Feb. 7, 2011 (Canada NewsWire Group) --
/NOT FOR DISTRIBUTION IN THE UNITED STATES OR FOR DISSEMINATION TO US NEWS WIRE SERVICES./
TSX-V: AUR
AIM: AAAM
LONDON, UK, Feb. 7 /CNW/ - African Aura Mining Inc. ("African Aura" or the "Company"), the TSX-V (AUR) and AIM (AAAM) listed exploration and development company is pleased to announce an updated independent National Instrument 43-101 compliant Mineral Resource Estimate at its 38.5% owned Putu iron ore project in Liberia.
- Inferred resource increased to 2.4 billion tonnes of iron mineralisation at 34% Fe
- Test work on magnetite BIF indicates a high grade concentrate can be produced
- Potential for direct shipping ore exists to generate near term cash flow
- Aggressive drilling campaign underway and expected to total >60,000m
- Potential for a further 1 to 2.5Bt below current modelled optimised pit shell
Luis da Silva, Chief Executive of African Aura, commented:
"The more than doubling of the resource at the Putu iron ore project in
Liberia to 2.4Bt is further excellent news for African Aura's
shareholders. The headline objective of African Aura and our joint
venture partner Severstal Resources was a 2Bt tonne resource and I am
very pleased that this has rapidly been achieved. We expect to upgrade
this resource to the indicated category during 2011. The JV partners
are mindful of the importance of moving the project forward as
efficiently as possible, for the benefit of the local communities and
all other stakeholders, and I look forward to providing updates on
progress in due course.
This news also comes on top of our announcement last week of a maiden 1Bt resource at our 100% owned Nkout iron ore project in Cameroon. African Aura's attributable iron ore inventory has increased fivefold in short order, from 0.38Bt at 34% Fe in 2010 to the current 1.96Bt at 34% Fe (equivalent to 666Mt of contained iron) and with the potential for significant further growth from here. The rationale for the proposed split of the Company into separately listed iron ore and gold companies, with shareholders in African Aura receiving one share in each company for each share they hold in African Aura, is a means to allow the market to better measure and reflect the intrinsic value of our assets which is becoming increasingly apparent."
Mineral Resource Estimate
This Putu Mineral Resource estimate, issued by independent engineers SRK
Consulting (UK) Ltd ("SRK") has been prepared for the Company and made
compliant with Canadian National Instrument 43-101 (NI43-101).
The report serves as an independent report prepared by a Qualified Person as defined by the Canadian National Instrument 43-101 and the companion policy 43-101CP. The definitions of Measured, Indicated and Inferred Resources, as well as reserves as used by the author, conform to the definitions and guidelines of the CIM (Canadian Institute of Mining, Metallurgy and Petroleum) reporting codes.
Table 1: Putu Project, Mineral Resource Estimate
| Zone | Resource Category | Tonnes (Mt) | Fe % | SiO2 % | AL2O3 % | P % |
| Oxide | Measured | - | - | - | - | - |
| Indicated | - | - | - | - | - | |
| Meas + Ind | - | - | - | - | - | |
| Inferred | 185 | 37.82 | 37.94 | 2.84 | 0.08 | |
| Magnetite Itabirite | Measured | - | - | - | - | - |
| Indicated | - | - | - | - | - | |
| Meas + Ind | - | - | - | - | - | |
| Inferred | 2,173 | 33.7 | 44.43 | 1.38 | 0.07 | |
| Haematite itabirite | Measured | - | - | - | - | - |
| Indicated | - | - | - | - | - | |
| Meas + Ind | - | - | - | - | - | |
| Inferred | 17 | 48.25 | 22.51 | 0.81 | 0.1 | |
| TOTAL | Measured | - | - | - | - | - |
| Indicated | - | - | - | - | - | |
| Meas + Ind | - | - | - | - | - | |
| Inferred | 2,374.00 | 34.1 | 43.8 | 1.49 | 0.07 |
Notes:
(1) The effective date of the Mineral Resource Estimate is 4 February, 2011
(2) The Mineral Resource Estimate for the Putu deposit was constrained within lithological and grade based solids and within a Lerchs-Grossman pit shell defined by the following assumptions; metal price of USD1.40/dmtu; slope angles of 44º; a mining recovery of 97.5%; a mining dilution of 2.5%; a base case mining cost of USD1.40/t and an incremental mine operating costs of USD0.05/t/10 m below the 100m reference RL and USD0.05/t/10 m above the 100 m reference RL; process operating costs of USD2.68/t crushed oxide andUSD5.67/t crushed BIF mineralisation; and G&A costs of USD2,915/t crushed mineralisation.
(3) Mineral Resources for the Putu deposit has been classified according to the "CIM Standards on Mineral Resources and Reserves: Definitions and Guidelines (December 2005) by Howard Baker (MAusIMM) an independent Qualified Person as defined by National Instrument 43-101.
In total, SRK has estimated an Inferred Mineral Resource for the Putu Project of 2.37 billion tonnes ("Bt") grading 34.1% Fe, 43.8% SiO2, 1.49% Al2O3 and 0.07% P. Of this, 185 million tonnes ("Mt") grading 37.8% Fe lies within surface oxidized zone, 2.17 Bt grading 33.7% Fe lies within the fresh magnetite itabirite zone, and 17 Mt grading 48.25% Fe lies within the fresh haematite itabirite zone.
Putu Resource Potential
The Putu model is open at depth and SRK recognises that there is
potential to increase the Mineral Resource Statement by targeting
material that falls below the optimised pit shell but remains
potentially economic. This material, based on a metal price of
USD1.40/dmtu is considered by SRK to be potentially economic, should
sufficient exploration data be collected that confirms the geometry and
continuation of the mineralisation and that enables a classified
resource to be estimated.
SRK has identified that an additional 1 to 2.5 Bt lies below the optimised pit shell used for constraining the Inferred Mineral Resources. The potential quantity of tonnes is conceptual in nature as there has been insufficient exploration or demonstration of economic viability to report these in the Inferred Mineral Resource category at the current time. It is uncertain if further exploration will result in these targets being defined and reported in a future Mineral Resource Estimate. These potential tonnages reflect a range of material within SRK's wireframe solid models outlining the interpreted down dip extent of mineralisation.
Database Validation
The QA/QC program for Company's Putu project consists of alternating the
insertion of a blank and duplicate sample on a regular basis within the
sample train. All samples have been assayed at the accredited SGS
Johannesburg laboratory in South Africa. SRK found that the results of
the above described QA/QC program indicate that the Company's Putu
assay databases were appropriate for Mineral Resource Estimation,
however, these databases need to be improved in order to upgrade the
Inferred Mineral Resources to Indicated Mineral Resources.
Data Verification
Howard Baker as qualified person completed the verification of data on
which the Putu Resource Estimate was based. This verification included
an assessment of QA/QC data, sample preparation and assay
methodologies, density data, data inputs and survey data used in the
estimate. Data was validated by using field checks, statistical methods
and evaluating the Company's protocols.
Geological Modelling, Resource Estimation Assumptions, Parameters and
Methods
Putu can be divided into two main areas, Montroh and Jideh. The former
is east-west trending, and the latter is northnortheast-southsouthwest
trending. Both areas are compromised of magnetite Banded Iron Formation
("BIF") with oxidized caps of dominantly haematite mineralisation. SRK
created a geological model based on the lithological logging and
magnetic susceptibility data enabling two separate antiform structures,
one at Jideh and one at Montroh, comprising BIF material to be modelled
and a three dimensional solid to be created. A statistical review of
the validated drill hole data enabled a domain to be created within the
oxidized cap. Internal metasedimentary waste domains created within the
BIF and oxidized cap were based on lithology logging, magnetic
susceptibility data, Fe and Al2O3 assay grades.
A 5 m composite file was used in a geostatistical study (variography and Quantitative Kriging Neighbourhood Analysis, "QKNA") that enabled Ordinary Kriging ("OK") to be used as the main grade interpolation method. The interpolation used an elliptical search following the predominant dip and dip direction of the geological domains. The results of the variography and the QKNA were utilised to determine the most appropriate search and estimation parameters.
The interpolated block model was validated through visual checks and a comparison of the mean input composite and output model grades. SRK is confident that the interpolated block grades are a reasonable reflection of the available sample data.
Putu Metallurgical Test Work
As previously announced, metallurgical test work was conducted on five
samples from each of the main mineralisation units - magnetite
itabirite, epidote-chlorite magnetite itabirite, haematite itabirite,
transitional magnetite itabirite, and weathered (predominantly
haematite) itabirite. The test work was undertaken by Amdel Mineral
Laboratories in Australia.
The test work results indicate that the unweathered magnetite itabirite should be amenable to conventional magnetite processing, that is, using several stages of Wet Low Intensity Magnetic Separation.
Given the high (60%) recovery achieved for the transitional itabirite sample in the Davis Tube tests, despite the low magnetite content of this material according to the Satmagan measurement, this material may be amenable to the same flow sheet as the unweathered magnetite itabirite, albeit with a lower recovery. The suitability of this material to such a flow sheet may also depend on the relative proportions of this material to unweathered magnetite itabirite in the resource.
For the weathered itabirite and haematite itabirite samples, a process route possibly consisting of a combination of gravity separation, magnetic separation and flotation is indicated. In all cases, further test work is required in order to firm up potential process flow sheets and optimise the conditions under which to achieve a combination of acceptable product quality and recovery.
Putu Mineral Resource Classification
The Putu project has been classified as containing Inferred Mineral
Resources in the unweathered itabirite and oxidised domains. This is
mostly due to the current lack of assay data and the requirement for
more robust QAQC results. Inferred Mineral Resources have been
extrapolated no more than 200 m down dip of the deepest drill hole
intersection. It is the opinion of SRK that the down dip extension of
Inferred Mineral Resources is justified in areas of unsupported blocks
due to the known down-dip extensions observed in the geological logging
and the quality of the estimate in adjacent blocks.
About the Putu Iron Ore Project
The Putu iron ore project is a 13km long iron rich ridge, located only
130km inland from the deepwater shoreline of eastern Liberia. In
February 2011 the Company announced an Independent Mineral Resource of
2.4 billion tonnes of iron mineralisation at 34% total iron (Fe). The
best drill results to date are 73m @ 60.4% Fe in hole PDD011
(predominantly oxide) and 366m @ 41.5% Fe in hole PDD052 (predominantly
magnetite itabirite, with some haematite itabirite).The project is
being advanced in joint venture with Severstal who are earning a 61.5%
interest in the project as it moves towards completion of a
Pre-Feasibility Study. A Mineral Development Agreement detailing the
fiscal and legal terms for the development and mining of the Putu iron
ore deposit was granted and ratified by the Government of Liberia on
9th September 2010.
Cautionary Statement
The effective date of the Putu Mineral Resource Estimate is February 04,
2011. The Fe % presented in the above table is not meant to imply
recoverable product. Mineral Resources for the Putu iron ore Project
have been classified according to the "CIM Standards on Mineral
Resources and Reserves: Definitions and Guidelines (December 2005) by
Howard Baker (MAusIMM) an Independent Qualified Person as defined by
National Instrument 43-101.
Mineral Resources were estimated in conformity with generally accepted CIM "Estimation and Mineral Resource and Mineral Reserve Best Practices Guidelines". SRK is not aware of any known environmental, permitting, legal, title, taxation, socio-economic, marketing or other relevant issues that could potentially affect the estimate of Mineral Resources. The Mineral Resource may be affected by further exploration drilling which may increase or decrease the estimate. The Mineral Resource may also be affected by subsequent assessments of mining, environmental, processing, permitting, taxation, socio-economic and other factors. There is insufficient information at this stage to assess the extent to which the Mineral Resource will be affected by these factors that are more fully assessed in a feasibility study.
Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. Mineral Reserves can only be estimated based on the results of an economic evaluation as part of a preliminary feasibility or feasibility study. No Mineral Reserves have been estimated by SRK as part of the current assignment. There is no certainty that all or any part of the Mineral Resource will be converted to a Mineral Reserve.
The quantity and grade of reported Inferred Mineral Resource in this estimate are uncertain in nature and there has been insufficient exploration to define these Inferred Mineral Resources as an Indicated or Measured Mineral Resource; and it is uncertain if further exploration will result in upgrading them to an Indicated or Measured Mineral Resource category.
Qualified Person
Howard Baker has some ten years experience in the exploration,
definition and mining of iron ore Mineral Resources. Howard Baker is a
full-time employee of SRK Consulting (UK) Ltd, an independent
Consultancy and has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration, and to
the type of activity which he is undertaking to qualify as a Qualified
Person in accordance with NI43-101 and a Competent Person as defined in
the June 2009 Edition of the AIM Note for Mining and Oil & Gas
Companies. Howard Baker consents to the inclusion in the announcement
of the matters based on their information in the form and context in
which it appears and confirms that this information is accurate and not
false or misleading.
The NI 43-101 compliant Technical Report on the Mineral Resource Estimate will be filed on www.sedar.com within 45 days.
About African Aura Mining Inc.
African Aura is an established exploration and development company
listed on the TSX-V (AUR) and London's AIM (AAAM). The Company operates
two divisions that are intended to be split into separate listed
companies becoming effective, subject to shareholder, regulatory and
other approvals in April 2011:
- The iron ore division includes its 38.5% interest in the 2.4Bt Putu iron ore project in Liberia, which is subject to a resource expansion drilling programme and moving through pre-feasibility managed by joint venture partner Severstal Resources (the mining division of London and Moscow listed OAO Severstal). In September 2010 Putu was granted a 25 year renewable Mineral Development Agreement by the Government of Liberia. The division also includes a 100% interest in the Nkout 1Bt iron ore project and surrounding iron targets in Cameroon which is subject to a resource expansion drilling programme.
- The gold assets, to be held in "Aureus Mining Inc." when listed independently, include the New Liberty gold deposit in western Liberia which has a resource of 1.51 million ounces of gold grading 3.78 g/t (comprising 5,599,000 tonnes grading 4.17 g/t in the indicated category and 7,040,000 tonnes grading 3.40 g/t in the inferred category) which is being advanced through a bankable feasibility study, and the proximal Ndablama, Weaju, Silver Hills and Gondoja gold projects all within the Company's Bea Mountain 25 year renewable Mineral Development Agreement.
In addition, the Company has a 22% interest in AIM-listed diamond producer Stellar Diamonds Plc (AIM: STEL, www.stellar-diamonds.com).
The Company has a highly motivated and experienced team with a track record of discovering mines and taking projects through development and into production. As a pioneer, African Aura has attracted some excellent strategic partners and shareholders, always with the objective of preserving or enhancing shareholder value.
Forward-looking Statements
This press release includes certain forward-looking statements. All
statements, other than statements of historical fact, included herein,
including without limitation, statements regarding the future plans and
objectives of African Aura, are forward-looking statements that involve
various known and unknown risks and uncertainties as well as other
factors.
Such forward-looking statements are subject to a number of risks and uncertainties that may cause actual results or events to differ materially from current expectations, including delays in obtaining or failure to obtain required regulatory approvals. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Any forward-looking statements speak only as of the date hereof and, except as may be required by applicable law, African Aura disclaim any obligation to update or modify such forward-looking statements, either as a result of new information, future events or for any other reason.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.
For further information on the Company you are invited to visit its website atwww.african-aura.com, or SEDAR's website at www.sedar.com, or contact one of the following:
African Aura Mining Inc.
Luis da Silva, President & CEO Tel: +44 (0) 20 7257 2930
Evolution Securities Limited
Rob Collins / Tim Redfern Tel: +44 (0) 20 7071 4300
Pelham Bell Pottinger
Charles Vivian / James MacFarlane Tel: +44 (0) 20 7861 3232