Maronan Project Visual Results Drill Hole MRN14002
Filed with ASX · · 2 pages · English
copper-gold and basemetal metres below the strong silver and lead intercepts in MRN13002. deposits. Nine separate horizons of stronger bedded lead sulphide mineralisation occur within a 151 metre down-hole interval of banded carbonate- sulphide rock (Figure 1). These lead sulphide rich horizons vary from Issued Capital: about 2 to 19 metres in down-hole width and combined have a cumulative down-ho
Earlier from Red Metal
- Maronan Preliminary Mine Scoping Study Results
- December 2015 Quarterly Activities & Cashflow Report
- September 2015 Quarterly Activities & Cashflow Report
Later from Red Metal
- March 2016 Quarterly Activities Report and Cashflow
- June 2106 Quarterly Activities and Cashflow Report
- Irindina Copper-Cobalt First Pass Drilling Underway
- Irindina Copper-Cobalt Project Drilling Update
- September 2016 Quarterly Activities & Cashflow Report
Follow Red Metal into a list and get an email when it puts out news.
Follow Red Metal