Feb. 23, 2010 (TheNewswire.ca) --
Mainstream Minerals Corporation (TSX-V: MJO)(the "Company") announces that it has initiated a geophysical survey of its two West Timmins gold (OOTC:TMGOF) (TSXV:TMM) projects in Keefer and Price Township. Vision Exploration of Timmins, Ont., has commenced line cutting and will follow up immediately with a magnetometer and induced polarization survey.
Mainstream's West Keefer claims consist of three claims totalling 34 mineral claim units. The claims cover an area of approximately 544 hectares and are located in Keefer Township of the Porcupine mining district of Ontario. These claims are located immediately north of the Destor-Porcupine Fault system and are accessible via year-round gravel roads. The Destor-Porcupine fault is a regional fault system in the Timmins gold belt that has been attributed as a major contributor of the gold-bearing quartz vein systems of the prolific Timmins mining district where over 70 million ounces of gold have been produced.
The northern block of 26 claim units has numerous splays running north from the volcanic belt that overlaps the southern portion of the property. Shear zones and quartz veins were discovered just south of Little Star Lake in the 1930s. Little assessment work has been filed over the years on this property, and as such, the property deserves a closer look using modern exploration methods. The southern block of 8 claim units is also accessible by the same gravel road as the northern block. It is underlain by volcanic and granitic quartz diorite. There are two faults transecting the property in opposite directions. This property has also seen limited work over the years.
Mainstream's Price claims consist of 11 claims totalling 134 mineral claim units located east of Lake Shore Gold's (TSX:SGF) (TSX:LSG) Golden River trend. The claims cover an area of approximately 2,144 hectares and are located in the Price and Adams townships of the Porcupine mining district of Ontario. The Price claims are strategically located for several reasons, including: (i) the claims are located on the projection of the Destor-Porcupine fault system; (ii) the claims appear to be on trend with the Golden River trend; (iii) the claims have limited outcrop exposure, which is similar to other properties being worked in the area; and (iv) there has been little to no work conducted on the claimed area in the past. As such, these newly acquired claims may potentially host a similar geological environment as that of the nearby Lake Shore Gold area. Several publications, including the Geological Survey of Canada and West Timmins Mining Inc. public maps, project the Destor-Porcupine fault as running east-west through these newly acquired mineral claims.
Mainstream's President Michael Romanik states "We are very excited to start work on our two West Timmins projects. Upon completion of the IP survey we will have drill targets identified. There are a number of companies currently drilling in the area and assay results are pending from several of these previously announced drill programs. The West Timmins properties are a terrific addition into our portfolio of projects which include the Bobjo Mine JV and Hazard Lake property both in the Red Lake area and our Raleigh Lake Lithium / Tantalum prospect where Consolidated Addadon is currently drilling on their claims adjoining to the south."
About Mainstream Minerals (OOTC:MSMCF) (TSXV:MJO)
Mainstream Minerals Corporation is a mineral exploration and development company focused on precious metal / rare earths mining properties with economic potential, with the aim of bringing such properties to commercial production. The Bobjo Mine project is located in the prolific Red Lake Gold Camp in Ontario.
MJO Shares Outstanding: 34,187,449
ON BEHALF OF THE BOARD
Signed "Michael Romanik"
Michael Romanik, President & CEO
(204) 222-0137
info@mainstreamminerals.com
www.mainstreamminerals.com
This news release includes certain forward-looking statements concerning the future performance of Mainstream Mineral Corporation's business, its operations and its financial performance and condition, as well as management's objectives, strategies, beliefs and intentions. The Company does not intend, and does not assume any obligation, to update these forward-looking statements. Forward-looking statements are frequently identified by such words as "may", "plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and results. These forward-looking statements represent management's best judgment based on current facts and assumptions that management considers reasonable. The Company makes no representation that reasonable business people in possession of the same information would reach the same conclusions. All forward-looking information is inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, competitive risks and the availability of financing and as described in more detail in the Company's recent securities filings available at www.sedar.com. Actual events or results may differ materially from those projected in the forward looking-statements and readers are cautioned against placing undue reliance thereon.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
Copyright (c) 2010 Thenewswire.ca - All rights reserved.