Toro Energy LimitedASX: TOE

High Grade U3O8 Resource confirmed at expanded Wiluna Proj

· Issued by Toro Energy Limited

Filed with ASX · · 38 pages · English

• 27% increase in the previously reported high grade Lake Maitland U3O8 resource to 15.7 Mlb (at 500 ppm cut-off). • Lake Maitland adds scale and quality to pre-acquisition Resources at Wiluna. The total Resource base is reported as: -42.3 Mlb at 898 ppm (500 ppm cut-off) including 36.7 Mlb at 930 ppm from the first four planned mines – Centipede, Lake Way, Millipede and Lake Maitland; and -76.5 M

Toro Energy Limited on 6ix