Emu NLASX: EMU

Gold exploration prospects, Chile

· Issued by Emu NL

Filed with ASX · · 15 pages · English

The drilling completed to date is summarised in table 1 and the drill collars are shown in figure 1. The first hole was abandoned due to the time taken to drill to this depth caused by equipment failure which caused the hole condition to deteriorate. The other completed holes were finished in rock types that the contractor considered too hard for air core (using the vernacular – “refusal”). Table

Emu NL on 6ix

Story so far

Earlier from Emu NL

Later from Emu NL

All Emu NL news releases