Central Tanami Project - Exploration Update
Filed with ASX · · 8 pages · English
Results from reverse circulation (RC) drilling has extended the mineralised strike length south of the Groundrush Open Pit with the following significant results: • 7m @ 13.8g/t Au including 2m @ 45.5g/t (High grade Vein) • 7m @ 4.4g/t Au including 2m @ 11.9g/t (High grade Vein) • Visible gold logged in follow-up drilling– results pending Ongoing success from Groundrush Resource Upgrade Program wi
Follow Tanami Gold NL into a list and get an email when it puts out news.
Follow Tanami Gold NL