Assays Confirm More Massive Nickel Sulphides at Dusty
Filed with ASX · · 17 pages · English
• Assays confirm lenses of massive nickel sulphide were intersected in a thicker zone of visible nickel sulphides in diamond drill hole TED22 at Dusty 1, which was completed in the 2021 diamond drill programme. • Diamond drill hole TED22 intersected 7.2m of visible nickel (Ni) sulphides grading 1.05% Ni and 0.26% copper (Cu) from 252m downhole including: • 0.7m of massive Ni-sulphides grading 3.0%
Story so far
Earlier from Toro Energy
- Pit Re-Optimisation Increases Potential Uranium Ore
- Nickel Drilling Recommenced and Uranium Study
- Further Massive Ni Sulphides at Toros Dusty Project
- V2O5 Resource Integrated into Lake Maitland U3O8 Resource
- Toro to Assess 90.9Mlbs U3O8 Portfolio for Opportunities
Later from Toro Energy
- Third Massive Nickel Sulphide Discovery at Dusty
- More Massive Nickel Sulphides at Jumping Jack Discovery
- Fourth Massive Nickel Sulphide Discovery at Dusty
- Lake Maitland Uranium Project Scoping Study
- Toro intersects More Massive Nickel Sulphides
Follow Toro Energy into a list and get an email when it puts out news.
Follow Toro Energy