Assays confirm high grades over more than 7km strike length
Filed with ASX · · 11 pages · English
• Drill sample assays from Block C confirm high grade VHM strand joining Block B to Block D over a strike length of 7.9 km. • Visual estimates of mineralogy indicate that the very high Zircon content is also continuous along strike. • Drilling with two rigs of the 2.2 km northern extension in Block A currently in progress. In September 2012, Image completed a drill program consisting of 198 aircor
Earlier from Image Resources NL
Later from Image Resources NL
- Update on Completion Timing for Murray Zircon Transaction
- Update on Murray Zircon Transaction Completion
- Additional Funding Secured
- Update Focus on Bankable Feasibility Study
- Feasibility study update
Follow Image Resources NL into a list and get an email when it puts out news.
Follow Image Resources NL