Torrent Power Limited · NSE:TORNTPOWER

Torrent Power — Q2 FY2025-26 Earnings Presentation

27 slides from Torrent Power's earnings presentation, Nov 11, 2025

  1. Slide 1: Exchange filing cover letter

    November 11, 2025 To, To, Corporate Relationship Department Listing Department BSE Limited, National Stock Exchange of India Limited th 14 Floor, P. J. Towers, “Exchange Plaza”, C – 1, Block G Dalal Street, Fort, Bandra- Kurla Complex, Bandra (East), Mumbai-400001 Mumbai-400051 SCRIP CODE: 532779 SC

  2. Slide 2: Investor Presentation Q2 FY 2025-26

    s Investor Presentation Q2 FY 2025-26

  3. Slide 3: Disclaimer

    Disclaimer THIS PRESENTATION IS NOT AN OFFER TO SELL ANY SECURITIES OR A SOLICITATION TO BUY ANY SECURITIES OF TORRENT POWER LIMITED (THE “COMPANY or TPL”) OR ITS SUBSIDIARIES, ASSOCIATE, JOINT VENTURES TOGETHER WITH THE COMPANY, THE “GROUP” The material that follows is a presentation of general bac

  4. Slide 4: Presentation Outline

    Presentation Outline 01 Torrent Group Overview 02 Company Overview 03 Performance Overview 04 Key Highlights 3

  5. Slide 5: Torrent Group Overview

    #1 Torrent Group Overview

  6. Slide 6: Torrent Group

    Torrent Group Torrent Pharmaceuticals Limited Torrent Power Limited Torrent Gas Limited ◼ Generics pharmaceutical major with ◼ One of the leading private sector ◼ Incorporated in FY19, City Gas Distribution strong global footprint Integrated Power Utility with presence (CGD) business now has 17 oper

  7. Slide 7: Torrent Group …2

    Torrent Group …2 ₹ 40,681 Cr ₹1,93,356 Cr ₹ 1,83,195 Cr 27,400+ Turnover Enterprise Value Spreading smiles Illuminating Lives Market Cap Employees Generating Trust. Distributing Opportunities. Not just healthcare… Lifecare Building pan-India city gas distribution Turnover ₹ 29,165 Cr Turnover ₹ 11,5

  8. Slide 8: Company Overview

    #2 Company Overview 7

  9. Slide 9: One of the Leading Private Sector Integrated Power Utility

    One of the Leading Private Sector Integrated Power Utility Promoter Public 51.09% 48.91% Torrent Power Limited (Market Cap: c. ₹ 61,333 Cr1) Green hydrogen / Thermal Generation Renewable Generation Distribution PSP Transmission Green Ammonia Solar: Licensed ~8.4 GW across Uttar Pradesh and Gas based

  10. Slide 10: Pan India Footprint with Presence in Key States

    Pan India Footprint with Presence in Key States Wind Solar Gas Coal Transmission GUJARAT RAJASTHAN Wind (615 MW) Wind (24 MW) Distribution Licensee Distribution Franchisee Solar (583 MWp) AMGEN (362 MW) UTTAR PRADESH Operational Capacity (MWp) Agra SUGEN & UNOSUGEN (1530 MW) DGEN (1200 MW) Transmiss

  11. Slide 11: Operational Capacity to Grow from ~5.0 GW to ~10.1 GW

    Operational Capacity is estimated to Grow from ~5.0 GW to ~10.1 GW Backed by Robust Renewable Capacity Addition Installed Capacity Installed Capacity (including Pipeline) Solar 949 19% Gas Solar, 2,670 , 2,730 Coal + RE PIPELINE (26%) (27%) Coal Wind Solar (31%) (36%) (33%) 10,131 MWp 4,961 MWp Wind

  12. Slide 12: Snapshot of Operating Thermal Assets

    #1: Snapshot of Operating Thermal Assets Sugen Unosugen Capacity Capacity Plant Type Location COD Fuel Plant Type Location COD Fuel (MW) (MW) 1,147.5 Gas-based Surat, August Domestic 382.5 Gas-based Surat, April Domestic CCPP Gujarat 2009 Gas & CCPP Gujarat 2013 Gas & R-LNG (3 x 382.5) (1 x 382.5) I

  13. Slide 13: Snapshot of Under Development Thermal Assets

    #2: Snapshot of Under Development Thermal Assets Strategic Expansion in Thermal Power  Project Overview  Capacity: 1,600 MW (2x800 MW)  Location: Madhya Pradesh  Technology: Ultra-Supercritical (high efficiency, lower emissions)  Model: DBFOO – Design, Build, Finance, Own, Operate  Project Hig

  14. Slide 14: Snapshot of Licensed Distribution Assets

    #3: Snapshot of Licensed Distribution Assets Ahmedabad / Gandhinagar Surat Customer Base (FY25) Peak Demand (FY25) Licensed Area Customer Base (FY25) Peak Demand (FY25) Licensed Area ~ 356 sq. km. >21 lakh 2,117 MW ~ 52 sq. km. >6 lakh 812 MW Highlights Highlights ✓ Distribution loss of 3.33% (FY25)

  15. Slide 15: Snapshot of Franchisee Distribution Assets

    #4: Snapshot of Franchisee Distribution Assets Bhiwandi Agra Licensed Area Peak Demand (FY25) License validity Licensed Area Peak Demand (FY25) License validity ~ 721 609 25th Jan 2027 ~ 221 572 31st March sq. km. MVA [The license validity for the Bhiwandi area can be sq. km. MVA 2030 extended by fi

  16. Slide 16: Transmission - Current Operations and Future Projects

    #5: Transmission - Current Operations and Future Projects Existing Transmission Portfolio  400 kV Double-Circuit Transmission Lines: 355 km & 220 kV Double-Circuit Transmission Lines: 128 km  Operations are conducted through Torrent Power Grid Limited (TPGL), a subsidiary wherein Torrent holds 90.

  17. Slide 17: Target to Increase Renewable Portfolio to ~5.4 GW

    #6: Target to Increase Renewable Portfolio to ~5.4 GW Renewable Energy Projects in Pipeline Contracted Capacity Under Expected Tariff in Project Technology Capacity Installation Off-taker Project Cost Remarks Rs/Unit (MW) (MWp**) (Rs in Cr) Part project commissioned; SCOD MSEDCL 306* 367* 3.10 MSEDC

  18. Slide 18: Pumped Storage Hydro Projects

    #7: Pumped Storage Hydro Projects 3 GW Pumped Storage Hydro Project – Under Development ➢ Project Capacity: 3,000 MW ➢ Location: Raigad District, Maharashtra ➢ Project Cost: ~₹14,000 Crore ➢ Tied-up Capacity: 2,000 MW / 16,000 MWh for 40 years • Agreement: Executed Energy Storage Facility Agreement

  19. Slide 19: Performance Overview

    #3 Performance Overview 18

  20. Slide 20: Overview of Operations – Q2/ FY 2025-26

    Overview of Operations – Q2/ FY 2025-26 Rs in Crore Q2 25-26 Q2 24-25 % Growth H1 25-26 H1 24-25 % Growth FY 24-25 Revenue from Operations 7,876 7,176 10% 15,782 16,210 (3%) 29,165 Power Purchase Cost 5,242 5,113 10,714 11,363 20,168 Material Cost & Change in Inventory 464 255 725 543 1,317 Contribu

  21. Slide 21: Overview of Operations – Q2/ FY 2025-26

    Overview of Operations – Q2/ FY 2025-26 Total Comprehensive Income for Q2 FY 2025-26 stood at ₹ 730 Cr as compared to ₹ 492 Cr for Q2 FY 2024-25. The strong operational performance contributing to higher TCI of ₹ 238 Crs for the quarter on a year-on-year is primary attributable to:  Increase in con

  22. Slide 22: Overview of Operations – Thermal Power

    #1: Overview of Operations – Thermal Power Thermal PLF % 82.9% 88.5% 51.0% 33.9% 32.2% 32.6% 21.4% 25.5% 25.2% 7.9% 11.0% 6.6% SUGEN UNOSUGEN DGEN GAS AMGEN THERMAL Q2-25 Q2-26 89.6% 89.8% 55.3% 40.5% 46.2% 35.6% 38.6% 33.2% 28.5% 28.4% 21.4% 21.0% SUGEN UNOSUGEN DGEN GAS AMGEN THERMAL H1-25 H1-26 2

  23. Slide 23: Overview of Operations – Renewable Power

    #2: Overview of Operations – Renewable Power Renewable Power PLF % Q2-25 Q2-26 32.3% 30.1% 13.4% 16.0% WIND 921 MW/ 921 MW SOLAR 567 MWp / 949 MWp H1-25 H1-26 30.4% 30.8% 15.9% 18.9% WIND 921 MW/ 921 MW SOLAR 567 MWp / 949 MWp PLF on contracted capacity 22

  24. Slide 24: Overview of Operations – Power Distribution

    #3: Overview of Operations – Power Distribution USO/Purchase (MUs) 2,508 2,693 2,830 Q2 FY25 Q2 FY26 2,453 1,102 1,063 1,068 1,008 763 797 212 205 223 225 Ahmedabad Surat DDDNH Dahej Bhiwandi Agra SMK T&D Loss – Licensed Distribution (%) T&D Loss – Franchised Distribution (%) H1 FY25 H1 FY26 5.0% H1

  25. Slide 25: Key Highlights

    #4 Key Highlights 24

  26. Slide 26: Key Highlights

    Key Highlights  One of the leading Indian conglomerate with significant experience in multiple businesses such as Pharma, Power and CGD  Quality equipment sourced from major OEMs for the projects #1  Competitive advantage through direct LNG imports compared  Being a part of Torrent Group enables

  27. Slide 27: Thank You

    THANK YOU Contact details: Rishi Shah Torrent Power Limited “Samanvay”, 600 Tapovan, Ambawadi, Ahmedabad 380015 Ph. No. (079) 26628473 Email: IR@torrentpower.com 26

Torrent Power — Q2 FY2025-26 Earnings Presentation on 6ix