  1. Slide 1: Quality, Diverse Group of Mining Assets

    Quality, Diverse Group of Mining Assets January 2017 TSX: TKO NYSE MKT: TGB 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Some of the statements contained in the following material are "forward-looking statements". All statements in this release, other than statements of historical facts, that address estimated mineral resource and reserve quantities, grades and contained metal, and possible

  3. Slide 3: Diversified Asset Base

    Diversified Asset Base Gibraltar (Cu-Mo) – 75% 4th largest open-pit copper mine in North America Aley (Nb) – 100% 722 million tons P&P reserve, with add’l 3rd largest niobium deposit in the world resources expected to convert to reserves 84 million tonne P&P reserve @ 0.50% 22 year mine life Nb2O5 (

  4. Slide 4: Gibraltar Copper Mine

    Gibraltar Copper Mine Canada’s Second Largest Open-Pit Copper Mine Location: 65 km north of Williams Lake, British Columbia Ownership: 75% 3.3 billion pounds recoverable copper Mineral Reserves: 62 million pounds recoverable molybdenum Reserves Update (Dec 2015: 722m tons at 0.272% copper equivalent

  5. Slide 5: Gibraltar Copper Mine

    Gibraltar Copper Mine GDP3 Expansion – New 30k tpd Concentrator (commissioned in 2013) 34’ SAG Mill 20’ Ball Mill 160m3 Float Circuit Operating at steady-state 150 Gibraltar Production (100%, Mlbs Cu) after six years of expansion 120 activities Modernized mine stabilized at 90 reduced operating cost

  6. Slide 6: Operating Costs

    Operating Costs Focussed on Lower Cost per Ton Milled • Cost per ton milled sustained at low levels for past two years due to cost saving initiatives, including revised mine plan with lower strip ratio • Comparable open pit mines in South America at $15-20 per ton milled Cost Per Ton Milled (C$) $13

  7. Slide 7: Cost Benefits

    Cost Benefits BC Advantage Low cost power - $0.06/kWh vs. $0.15-$0.20 elsewhere Established infrastructure in a favorable jurisdiction – highway access, rail, port, grid power (existing infrastructure funded by government) Skilled and efficient labor force – similar sized South American mine employs

  8. Slide 8: Operating Costs

    Operating Costs Total Operating Costs per Pound (C1) Head grade has significant impact on reported C1 cost Copper grade expected to average ~0.3% into 2017 compared to <0.26% in 2016 Operating costs, on a per pound basis, will be positively impacted by 2017 copper grade and ongoing cost reduction in

  9. Slide 9: Operating Margin Sensitivity

    Operating Margin Sensitivity Highly levered to copper price recovery and further cost reductions C1 Costs (US$/lb) Operating Margin (C$, $1.80 $1.70 $1.60 $1.50 $1.40 $1.30 millions) $2.10 $55 $75 $95 $110 $130 $150 Cu Price (US$/lb) $2.30 $95 $110 $130 $150 $170 $185 $2.50 $130 $150 $170 $185 $205

  10. Slide 10: Valuation Comparable

    Valuation Comparable Teck’s Highland Valley Copper • Teck recently acquired the remaining 2.5% of their HVC Copper Mine in British Columbia • Applying the same valuation to Gibraltar: In situ recoverable pounds of copper Teck purchased (reserves) 82,000,000 Total paid (C$) $33,000,000 Total paid per

  11. Slide 11: Florence Copper Project

    Florence Copper Project A Near Term, Low Cost Copper Producer Location: Central Arizona near the community of Florence Ownership: 100% 345 million tons grading 0.36% TCu (at a 0.05% total copper Mineral Reserves: cutoff) containing 1.7 billion pounds of recoverable copper Mine Type: In-situ copper r

  12. Slide 12: Florence Copper Project

    Florence Copper Project 2017 Technical Study In January, Taseko announced the results of a two-year metallurgical test program as well as an optimization of the project well field development sequence The updated data was used to re-cost the project which resulted in a significant improvement in pro

  13. Slide 13: Florence Copper Project

    Florence Copper Project Project development costs and timeline Phase 1 – Production Test Facility (PTF): 2017 – construction & operation Phase 2 – Full scale production facility Permitting – 12 months (initiated during PTF operation) Construction – 18 months Copper production - 2020 13

  14. Slide 14: Aley Niobium Project

    Aley Niobium Project Accretive Development Opportunity Location: Northern British Columbia Ownership: 100% Mine Type: Open Pit, 10,000 tpd mill throughput Mine Life: 24 years Project Highlights Proven and probable reserves of 84 million tonnes grading 0.50% Nb2O5 announced in September 2014 Pre-tax

  15. Slide 15: Copper Price Leverage

    Copper Price Leverage Taseko Cash Flow to Benefit Most in Copper Price Recovery At At Spot Change 2017 CFPS Spot +10% +20% Spot +10% Spot +20% Copper Price $2.19 $2.41 $2.63 Large Cap FM $1.27 $1.40 $1.53 10% 20% FCX $2.69 $3.16 $3.63 17% 35% TCK C$4.20 C$4.41 C$4.61 5% 10% TRQ ($0.18) ($0.15) ($0.1

  16. Slide 16: Sector Scarcity

    Sector Scarcity TSX/TSXV Copper Producers - 2008 Anvil Mining Ltd. Capstone Mining Corp. • Lack of publicly listed intermediate producers and Centenario Copper Corp. quality development assets stem from a decade of Copper Mountain Mining Corp. M&A and corporate activity with little to no new investm

  17. Slide 17: Deeply Discounted Valuation

    Deeply Discounted Valuation NPV $1.0 billion $1.2 billion $0.8 billion $2.1 billion NPV Total: $5.1 billion Market Capitalization: $0.3 billion = 94% discount 17

  18. Slide 18: Appendix

    Appendix 18

  19. Slide 19: Corporate Information

    Corporate Information Cash on Hand (9/30/16): C$64 million LT Debt (9/30/16) : C$364 million Listed: TSX; TKO / NYSE MKT; TGB Shares Outstanding: 221.8 million Market Capitalization: ~C$330 million 52 Week High/Low: C$1.53/C$0.35; US$1.17/US$0.23 Analyst Coverage: Scotia Capital, National Bank, Para

  20. Slide 20: New Prosperity Project

    New Prosperity Project One of the Largest Gold/Copper Porphyries in the World Location: 125 km south west of Williams Lake, British Columbia Ownership: 100% 7.7 million ounces recoverable gold Mineral Reserves: 3.6 billion pounds recoverable copper Mine Type: Open-pit, 70,000 tpd mill throughput Min

  21. Slide 21: Aley Niobium Project

    Aley Niobium Project What is Niobium Niobium Benefits in Steel $9 of Niobium used in a Car Specifically used in manufacturing high strength, low alloy steels Green technologies, turbines, aerospace, automobile steels, oil and gas Global annual consumption of ferro-niobium is 210 million lbs/year Gro

  22. Slide 22: Experienced Management Team

    Experienced Management Team Russell Hallbauer, P. Eng - President & CEO and Director – Mr. Hallbauer is a professional engineer with over 35 years of mining experience. He has a strong background in open pit and underground mining, overseeing operating joint ventures and revitalizing mines to profit

  23. Slide 23: Reserves & Resources

    Reserves & Resources New Prosperity The mineral resource and reserve estimations were completed by Mineral Reserves @ C$5.50 NSR/t Cut-Off1 Taseko staff under the supervision of Scott Jones, P.Eng., Vice- Grade Recoverable Metal Contained Metal President, Engineering and a Qualified Person under Nat