Kimber Res Inc

Kimber Res — Kimber Resources — Investor Presentation (January 2013)

34 slides from Kimber Res's investor presentation, January 2013

  1. Slide 1: Kimber Resources: Gold and Silver Exploration in Mexico

    We) KIMBER RESOURCES Gold and Silver Exploration in Mexico Building Value With Committment January 2013 TSX: KBR www.kimberresources.com NYSE MKT:KBX

  2. Slide 2: Monterde Project - 100% owned

    KIMBER RESOURCES Monterde Project - 100% - owned  29,000 hectares located in Mexico’s prolific Sierra Madre gold-silver belt Dolores Mulatos Pan American Silver Alamos Gold Ocampo Minera Frisco Pinos Altos Agnico Eagle Mulatos Alamos Gold El Sauzal Goldcorp 2

  3. Slide 3: Capital Structure

    CAPITAL STRUCTURE December 31, 2012 Shares Outstanding 82.7M Fully Diluted 87.5M Market Capitalization C$29.8M Share Price TSX: KBR C$ 0.36 NYSE MKT: KBX US$ 0.37 Cash C$1.9M Working Capital C$1.9M Debt C$3.0M 3

  4. Slide 4: Monterde Mineral Resource Estimate

    Monterde Mineral Resource Estimate Carmen Open Pit cutoff at 0.3 g/t Au Eq. Carmen Underground Area, Veta Minitas and Carotare cutoff at 2.0 g/t recoverable Au Eq. In situ Gold In Situ Silver Contained In Situ Contained In Situ Recoverable Classification Location Tonnes (000s) Grade Grade Gold Silve

  5. Slide 5: 2012 Updated Mineral Resource Estimate for Carmen Deposit: Overall Highlights

    2012 Updated Mineral Resource Estimate for Carmen Deposit Overall Highlights  Conversion and upgrade of a significant portion of the mineral resource into Measured and Indicated. Total Combined Measured & Indicated (Open Pit + Underground)  Gold ounces increased by 14%  Silver ounces increased by

  6. Slide 6: 2011 PEA Proposed Open Pit showing 2012 Mineral Resource Classification

    2011 PEA Proposed Open Pit showing 2012 Mineral Resource Classification Red: Measured Green: Indicated Blue: Inferred Potential to further expand the Open Pit through further optimization. 6

  7. Slide 7: Underground Area: Below 2011 PEA Proposed Open Pit

    Underground Area: Below 2011 PEA Proposed Open Pit 2011 drilling had greater than 90% structure intercept rate supporting continuity and Kimber’s geological model. 7

  8. Slide 8: Why Kimber? Advancing towards a Production Decision

    WHY KIMBER? Advancing towards a Production Decision  2012: Improved Classification = Improved Confidence  Open Pit: 91% Gold ounces now in M&I category (62% Measured) 95% Silver ounces now in M&I category (73% Measured) Metallurgical Recoveries: Gold: 94%, Silver: 55%  Underground 62% Gold ounces

  9. Slide 9: 2011 Preliminary Economic Assessment

    2011 Preliminary Economic Assessment* Payable Gold Payable Silver Total: 11.68 M tonnes 744,000 oz 20.2 M oz Open Pit Underground Tonnes 5.95 M 5.73 M Grade Gold 1.12 g/t 3.16 g/t Silver 98.7 g/t 85 g/t Est. Mine Life 9 yrs 15.5 yrs LOM Recovery Avg. gold 95% and silver 60% LOM Recoverable Grade 2.0

  10. Slide 10: Why Kimber? Open Pit & Underground Optionality

    WHY KIMBER? Advancing towards a Production Decision  Open Pit & Underground Optionality Potential to advance Open Pit and/or Underground production independently Note: The illustrated timeline towards production is an arbitrary timeline and does not rely on any material data supporting the probabil

  11. Slide 11: Carmen: Exploration Potential

    CARMEN: Exploration Potential Carmen Exploration Old Mine Working Rehabilitation Rehabilitation complete Hilos levels 0 & 1 sampling completed (announced Dec. 20, 2012) Carmen levels 1 & 3: Rehabilitation ongoing Sampling ongoing 11

  12. Slide 12: Carmen: Recent Exploration Hilos Underground Sampling

    CARMEN: Recent Exploration Hilos Underground Sampling Station Sample Au Eq.** Sample width* Gold g/t Silver g/t Number g/t Location (m) Station 06 1.8 1.36 633.7 13.4 Hilos 1 Horizontal 3.2 2.78 138.6 5.4 Hilos 1 Sample 12 Station 17 1.7 3.36 296.9 9.0 Hilos 1 Station 18 1.3 7.39 1,250.0 30.3 Hilos

  13. Slide 13: Monterde: Exploration Potential

    MONTERDE: EXPLORATION POTENTIAL  Additional mineralized structures discovered northeast of Carmen; Cocos Structure & Carmen East  Monterde wide targets 13

  14. Slide 14: Monterde: Exploration Potential

    Monterde: Exploration Potential La Verde Veta Norte Structure 0409 Carmen Carmen East Carotare Veta Minitas Carmen South Extension Arimo Exploration Targets Monterde Deposits Exploration Targets 14

  15. Slide 15: Carmen: Exploration Potential

     Deposit remains open at CARMEN: Exploration Potential depth/along strike Showing Proposed Pit and Surface Mineralization (see pg. 14 for details)  Exploration potential to north-east of Carmen  Regional potential at Monterde Note: See pg. 30 for corresponding drill highlights 15

  16. Slide 16: Carmen: Exploration Potential

    CARMEN: Exploration Potential Carmen East D ? ? • Potential for parallel mineralized structures • Possible Full Graben Model ? ? 16

  17. Slide 17: Carmen: Exploration Potential

    CARMEN: Exploration Potential Ring Structures: Carmen situated between two ring structures. Potential for additional mineralization extending along ring fracture. *Note: Artistic interpretation used. May not be accurately drawn. 17

  18. Slide 18: Carmen: Exploration Potential

    CARMEN: Exploration Potential 18

  19. Slide 19: Exploration Potential: Stratigraphic – down dip potential

    EXPLORATION POTENTIAL: Stratigraphic – down dip potential Situated in Upper Volcanic Sequence: eg. Monterde – Kimber Resources, Pinos Altos – Agnico Eagle Situated in Lower Volcanic Sequence: eg. Palmarejo – Coeur d’Alenes, O’Campo – AuRico Gold, San Miguel - Paramount 19

  20. Slide 20: Why Kimber? Social and Environmental Factors

    Why Kimber? Social and Environmental Factors All projects in mining friendly Mexico Experienced Mexican exploration team Excellent relationships and history of accommodation with two active Ejidos at Monterde:  Health and Dental Brigades  Capacity and infrastructure building  Roundtable discussio

  21. Slide 21: Kimber Value: M&I Gold Ounces

    KIMBER VALUE M&I GOLD OUNCES BASED ON Au.Eq. (millions) M&I Au Eq. Ozs. Gold Eq. Grade GOLD PRICE $1150 Kimber KimberResources Resources 3.0 g/t Au Eq SILVER PRICE $20 Explorers Esperanza 1.1 g/t Au Eq Paramount 0.5 g/t Au Eq Goldgroup Mining 0.8 g/t Au Eq Producers Timmins Gold 0.6 g/t Au Eq Aura M

  22. Slide 22: Kimber Value: Gold Valuations Based on M&I Au Eq Ozs

    KIMBER VALUE GOLD VALUATIONS BASED ON M&I Au.Eq.Ozs. EV pe M&I Au Eq. Oz Gold Eq. Grade GOLD PRICE $1150 Kimber Resources Kimber Resources 3.0 g/t Au Eq SILVER PRICE $20 Explorers Esperanza 1.1 g/t Au Eq Paramount 0.5 g/t Au Eq Aura Minerals 0.8 g/t Au Eq Goldgroup Mining 0.8 g/t Au Eq Producers Arg

  23. Slide 23: Kimber Value: M&I Silver Ounces Based on Ag Eq

    KIMBER VALUE M&I SILVER OUNCES BASED ON Ag Eq M&I Ag Eq. Ozs Silver Eq. Grade SantaCruz** 298 g/t Ag Eq GOLD PRICE $1150 SILVER PRICE $20 Explorers Mag Silver* 816 g/t Ag Eq Kimber Kimber Resources Resources 177 g/t Ag Eq Orko Silver 126 g/t Ag Eq Paramount 30 g/t Ag Eq Great Panther 552 g/t Ag Eq A

  24. Slide 24: Kimber Value: Silver Valuations Based on M&I Ag Eq Ozs

    KIMBER VALUE SILVER VALUATIONS BASED ON M&I Ag. Eq. Ozs Silver Eq. Grade Ev per M&I Ag Eq. Oz. Kimber Kimber Resources Resources 177 g/t Ag Eq GOLD PRICE $1150 SILVER PRICE $20 Explorers Paramount 30 g/t Ag Eq Orko Silver 126 g/t Ag Eq Take over announced Dec. 16, 2012 SantaCruz** 298 g/t Ag Eq Mag

  25. Slide 25: Summary

    SUMMARY De-risking Achieved  Majority of total gold-silver mineral resources at Carmen and Monterde are within “Measured and Indicated” Category.  Open Pit: M&I category contains 91% of gold and 95% of silver ounces.  Underground: Indicated category contains 62% of gold and 73% silver ounces.  T

  26. Slide 26: Additional Information January 2013

    Additional Information January 2013 26

  27. Slide 27: Major Shareholders (> 1 million)

    Major Shareholders (> 1 million) Fund Number of Shares (million) Craton Capital 7.3 James (Jim) Puplava 6.0* FMR LLC (Fidelity) 5.8 Sprott Inc. 5.1 Royal Bank of Canada (RBC) 3.2 Sun Valley Gold LLC 2.5 US Global Investors Inc 1.5 Total 31.4 % of Outstanding Shares** 38% As reported in September 30,

  28. Slide 28: Experienced Board and Management

    Experienced Board and Management MANAGEMENT Gordon Cummings C.A. President and CEO – over 23 years of finance and management expertise. David Hembree, Registered Professional Geologist, QP VP Exploration – over 30 years of experience in exploration and production including open pit and underground o

  29. Slide 29: Monterde - History

    Monterde - History 1700s: Gold discovered by Spanish 1937-1944: High-Grade production  Reported production of 68,000t at 19.3 g/t gold and 311 g/t silver  Production halted due to lack of supplies during World War II 2000: Monterde acquired by Kimber 2002: Kimber listed on the TSX Venture  Upgrad

  30. Slide 30: Monterde – Carmen Deposit: Highlights of 2011-2012 Drilling

    MONTERDE – CARMEN DEPOSIT Highlights of 2011-2012 Drilling From To Silver Label Zone Section Drill Hole (m) (m) Width (m) Gold (g/t) (g/t) 1*** Carmen Deep* 30 MTRD-476 565.5 570.4 4.9 78.4 128 2*** Carmen Deep* 34 MTRD-477 255.5 260.7 5.2 51.9 1,077 3*** Carmen Deep* 38 MTRD-473 188.0 192.0 4.0 25.

  31. Slide 31: Cautionary Statements

    CAUTIONARY STATEMENTS Cautionary Note on Mineral Resources Compliance with National Instrument 43-101 Mineral resources that are not mineral reserves do not have demonstrated economic viability. Mineral resource estimates do not account for mineability, selectivity, mining loss and dilution. These m

  32. Slide 32: NI43-101 Compliance

    NI43-101 COMPLIANCE Forward Looking Statements This presentation contains certain statements which may be viewed as forward-looking statements that involve risks and uncertainties. When used herein, the words “believes”, “anticipates”, “expects”, "intend", "hopes", "should", "may", "will", "if", "po

  33. Slide 33: NI43-101 Compliance (continued)

    NI43-101 COMPLIANCE (continued) The mineral resource estimate for the Carmen Deposit at Monterde was prepared by Mr. Gary Giroux P.Eng. a senior associate of Micon International Limited and a Qualified Person (“QP”), and the results are effective at October 24, 2012. This mineral resource estimate w

  34. Slide 34: Kimber Resources: Gold and Silver Exploration in Mexico

    We) KIMBER RESOURCES Gold and Silver Exploration in Mexico Building Value With Committment January 2013 TSX: KBR www.kimberresources.com NYSE MKT:KBX 34

Kimber Resources — Investor Presentation (January 2013) on 6ix