  1. Slide 1: Developing Mexico's Next Gold-Silver Mine

    wy KIMBER RESOURCES TSX: KBR NYSE AMEX:KBX DEVELOPING Mexico’s NEXT GOLD-SILVER MINE BUILDING VALUE WITH COMMITMENT May 2012 www.kimberresources.com

  2. Slide 2: Kimber Resources

    KIMBER RESOURCES Monterde Project - 100% - owned  29,000 hectares located in Mexico’s prolific Sierra Madre gold-silver belt Preliminary Economic Assessment (“PEA”) - July 2011  Potential for a low cost, long-lived gold-silver mine  Estimated Annual Production 58,000 oz gold + 1.9 million oz silv

  3. Slide 3: Why Kimber?

    WHY KIMBER? Monterde PEA showing potential for low cost gold-silver production with long life Updated Mineral Resource Estimate - Q2-2012. Majority of gold-silver mineral resources in the “Measured and Indicated” category  Excellent platform for advancing towards production decision Potential for d

  4. Slide 4: Management

    MANAGEMENT MANAGEMENT Gordon Cummings C.A. President and CEO – over 22 years of finance and management expertise. James A. Currie P.Eng. COO – former COO at NewGold with over 33 years of mining experience Lyn Davies C.A. CFO – over 25 years of experience in public practice and finance roles. NON-EXE

  5. Slide 5: Capital Structure

    CAPITAL STRUCTURE April 30, 2012 Shares Outstanding 82.5M Fully Diluted 93.7M Market Capitalization C$75.9M Share Price TSX: KBR C$ 0.92 NYSE AMEX: KBX US$0.94 Cash C$2.0M Working Capital C$3.3M Long-Term Debt NIL 5

  6. Slide 6: Monterde: Well Positioned in the Prolific Sierra Madre Gold Belt

    MONTERDE WELL POSITIONED IN THE PROLIFIC SIERRA MADRE GOLD BELT 6

  7. Slide 7: Mineral Resources at Carmen

    MINERAL RESOURCES AT CARMEN (PEA July 22, 2011) Carmen Mineral Resource Estimate Carmen Open Pit cutoff at 0.3 g/t Au Eq Oz, Outside Pit cutoff at 2.0 g/t recoverable gold equiv. Contained In Situ Contained In Situ In situ Gold Grade In Situ Silver Grade Classification Location Tonnes (000s) Gold Si

  8. Slide 8: Monterde 2011 Preliminary Economic Assessment

    MONTERDE 2011 Preliminary Economic Assessment Payable Gold Payable Silver Total: 11.68 M tonnes 744,000 oz 20.2 M oz Open Pit Underground Tonnes 5.95 M 5.73 M Grade Gold 1.12 g/t 3.16 g/t Silver 98.7 g/t 85 g/t Est. Mine Life 9 yrs 15.5 yrs LOM Recovery Avg. gold 95% and silver 60% LOM Recoverable G

  9. Slide 9: Monterde - Exploration

    MONTERDE - Exploration 2011 Exploration Success Over 54,000 metres drilled since January 2011 with a focus on converting Inferred to Indicated Significant high-grade gold-silver intersected below Carmen Mineral Resource Identification of new high-grade gold-silver structures 2012 Exploration Focus U

  10. Slide 10: Monterde Simplified Geology and Surface Mineralization

    MONTERDE MONTERDE ‘STRATIGRAPHIC COLUMN Monterde om i Simplified Geology and Surface Mineralization wir Deposit XY Mineralized Target ~ call Mineralization Intercepted ® at Depth, Est. Strike % April 2012 Scale: n/s MONTERDE TSX: KBR www.kimberresources.com Deposit Area of Detailed} NYSE AMEX:KBX 7°

  11. Slide 11: Proposed Open Pit & Surface Mineralization at Carmen

    PROPOSED OPEN PIT & SURFACE MINERALIZATION AT CARMEN 11

  12. Slide 12: Monterde – Carmen Deposit: Highlights of 2011 Drilling

    MONTERDE – CARMEN DEPOSIT Highlights of 2011 Drilling From To Silver Label Zone Section Drill Hole (m) (m) Width (m) Gold (g/t) (g/t) 1*** Carmen Deep* 30 MTRD-476 565.5 570.4 4.9 78.4 128 2*** Carmen Deep* 34 MTRD-477 255.5 260.7 5.2 51.9 1,077 3*** Carmen Deep* 38 MTRD-473 188.0 192.0 4.0 25.1 13

  13. Slide 13: Carmen gm x m AuEq Longitudinal Section

    CARMEN gm x m AuEq LONGITUDINAL SECTION * Long Section only illustrates Carmen structure within the Carmen deposit 13

  14. Slide 14: Carmen gm x m Gold Only Longitudinal Section

    CARMEN gm x m GOLD ONLY LONGITUDINAL SECTION * Long Section only illustrates Carmen structure within the Carmen deposit 14

  15. Slide 15: Carmen gm x m Silver Only Longitudinal Section

    CARMEN gm x m SILVER ONLY LONGITUDINAL SECTION * Long Section only illustrates Carmen structure within the Carmen deposit 15

  16. Slide 16: Section 34

    Section 34 MTC-142A – NEW COCOS STRUCTURE -7.0m @ 18.3 g/t Au and 374.3 g/t Au - From 363.0m – 370.0m MTRD-477 - 5.2m @ 51.9 g/t Au and 1,076 g/t Ag - From 255.5m - 260.7m - 0.9m @ 44.5 g/t Au and 38.2 g/t Ag - From 418.5m - 419.4m - 1.2m @ 28.2 g/t Au and 26 g/t Ag - From 432.0m – 433.2m - intersec

  17. Slide 17: Section 30

    Section 30 Hole MTRD-476 -4.9m @ 78.4 g/t Au and 127.9 g/t Ag -From 565.5m - 570.4m -Intersected Carmen structure at depth -100 metres below previous drilling Hole MTRD-502 -3.0m @ 8.8 g/t Au and 7.7 g/t Ag -From 565.5m - 570.4m -Intersected Carmen structure at depth -Over 30 metres below above inte

  18. Slide 18: Social and Environmental Factors

    Social and Environmental Factors All projects in mining friendly Mexico Experienced Mexican exploration team Excellent relationships and history of accommodation with two active Ejidos at Monterde:  Health and Dental Brigades  Capacity and infrastructure building  Roundtable discussions No time l

  19. Slide 19: Kimber Value: NPV vs Market Capitalization

    KIMBER VALUE Per Monterde 2011 Updated Preliminary Economic Assessment: NPV** vs Kimber Market Capitalization* After Tax, 8% discount $500 $450 US$471.8M $400 $350 $300 $250 $200 US$211.9M $150 $100 $50 KIMBER MARKET CAPITALIZATION* $- US$1,100 Gold/oz US$1,500 Gold/oz US $19 Silver/oz US $35 Silver

  20. Slide 20: Kimber Value: Total Gold Ounces

    KIMBER VALUE TOTAL GOLD OUNCES BASED ON Au.Eq. (millions) GOLD PRICE $1150 Esperanza Resources SILVER PRICE $20 Goldgroup Mining Kimber Resources Timmins Gold Paramount Argonaut Gold 0.0 2.0 4.0 6.0 8.0 10.0 20

  21. Slide 21: Kimber Value: Gold Valuations

    KIMBER VALUE GOLD VALUATIONS BASED ON TOTAL Au.Eq. Market Cap/oz Au eq. GOLD PRICE $1150 Kimber Resources SILVER PRICE $20 Esperanza Resources Paramount Goldgroup Mining Argonaut Gold Timmins Gold $- $20 $40 $60 $70 Average$80 $100 $120 $140 Updated from April 30, 2012 See NI43-101 Statements at end

  22. Slide 22: Kimber Value: Total Silver Ounces

    KIMBER VALUE TOTAL SILVER OUNCES BASED ON Ag Eq (millions) GOLD PRICE $1150 Great Panther SILVER PRICE $20 Mag Silver Orko Silver Fortuna Silver Endeavour Silver Kimber Resources First Majestic Paramount 0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0 450.0 * Mag Silver and Goldgroup have joint v

  23. Slide 23: Kimber Value: Silver Valuations

    KIMBER VALUE SILVER VALUATIONS BASED ON TOTAL Ag. Eq GOLD PRICE $1150 Kimber Resources SILVER PRICE $20 Paramount Orko Silver Fortuna Silver First Majestic Endeavour Silver Mag Silver Great Panther $- $2.00 $4.00 $6.00 $8.00 $10.00 $12.00 $14.00 Updated for April 30, 2012 $4.81 Average See NI43-101

  24. Slide 24: Specific Plans 2012

    SPECIFIC PLANS 2012 Continued drilling at Monterde Updated Carmen mineral resource estimate to be completed Q2-2012: to include 2011 drilling Advance towards a production decision  Completion of a Pre-Feasibility study following the updated Carmen mineral resource estimate  Feasibility-level work

  25. Slide 25: Summary

    SUMMARY Exploration Upside  Additional Structure discovered at Carmen with potential to discover more Valuation  Positive Monterde PEA based on existing mineral resources suggests Kimber undervalued Growth  2011 drill results to be incorporated in updated mineral resource Q2-2012 De-risking  Maj

  26. Slide 26: Additional Information May 2012

    Additional Information May 2012 26

  27. Slide 27: Monterde - History

    Monterde - History 1700s: Gold discovered by Spanish 1937-1943: High-Grade production  Reported production of 68,000t at 19.3 g/t gold and 311 g/t silver  Production halted due to lack of supplies during World War II 2000: Monterde acquired by Kimber 2002: Kimber listed on the TSX Venture  Upgrad

  28. Slide 28: Monterde – Veta Minitas and Carótare Total

    MONTERDE – VETA MINITAS and CARÓTARE TOTAL MINERAL RESOURCES (OUTSIDE CARMEN) (At a 0.3g/t Recoverable Gold Equivalent Cut-off) Base Case Total Mineral Resources Estimate (Inclusive of High Grade) for the Veta Minitas and Carotare Deposits Classification Tonnes In Situ Gold In Situ Silver Contained

  29. Slide 29: Monterde - Veta Minitas and Carótare High Grade

    MONTERDE - VETA MINITAS and CARÓTARE HIGH GRADE MINERAL RESOURCES (OUTSIDE CARMEN) (At a 2g/t Recoverable Gold Equivalent Cut-off) Base Case High Grade Mineral Resource Estimate for the Veta Minitas and Carotare Deposits Classification Tonnes In situ Gold In Situ Silver Contained In Contained In Sit

  30. Slide 30: Monterde: Operating and Capital Costs

    MONTERDE July 2011 – Preliminary Economic Assessment Operating and Capital Costs Operating Cost  Open Pit $14.50/t ore  Underground $40.07/t ore  Mill $13.88/t ore  G&A $0.98/t ore  Total cash costs $41.90/t ore Initial Capital Costs US$100.1m and Total Capital Costs of US$119.3m including $28.

  31. Slide 31: Monterde: Undiscounted Net Cash Flows

    MONTERDE Preliminary Economic Assessment Undiscounted Net Cash Flows 3 Year Trailing Ave Near Spot June 8, Base Case March 31, 2011 2011 Gold Price (US$/Oz) $1,100 $1,050 $1,500 Silver Price (US$/Oz) $19.00 $18.00 $35.00 Pre-Tax (millions) $585.1 $527.7 $1,205.5 After Tax (millions) $430.2 $388.9 $8

  32. Slide 32: NI43-101 Compliance

    NI43-101 COMPLIANCE Compliance with National Instrument 43-101 The economic assessment in the PEA is preliminary in nature and uses inferred mineral resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized

  33. Slide 33: NI43-101 Compliance (continued)

    NI43-101 COMPLIANCE (continued) The mineral resource estimate for the Carmen and Veta Minitas Deposit’s at Monterde were prepared by Mr. Gary Giroux P.Eng., a senior associate of Micon International, and the results for Carmen are effective at November 17, 2009 and for Veta Minitas at November 30, 2

  34. Slide 34: Cautionary Statements

    CAUTIONARY STATEMENTS This presentation contains certain statements which may be viewed as forward-looking statements that involve risks and uncertainties. When used herein, the words “believes”, “anticipates”, “expects” and similar expressions are intended in certain circumstances, to identify forw

  35. Slide 35: Developing Mexico's Next Gold-Silver Mine

    wy KIMBER RESOURCES TSX: KBR NYSE AMEX:KBX DEVELOPING Mexico’s NEXT GOLD-SILVER MINE BUILDING VALUE WITH COMMITMENT May 2012 www.kimberresources.com 35