Daura Gold Corp. · TSXV:DGC

Daura Gold — Investor Presentation (April 2026)

19 slides from Daura Gold's investor presentation, April 2026

  1. Slide 1: High-Grade Gold & Silver Exploration in Peru and Argentina

    High-Grade Gold & Silver Exploration in Peru and Argentina TSXV: DGC | OTCQB: DGCOF April 2026

  2. Slide 2: Forward-Looking Statements

    Forward-Looking Statements FORWARD-LOOKING STATEMENTS The forward-looking statements herein are made as of the date of this presentation only and Daura Gold Corp. does not assume any obligation to update or revise them to reflect new information, estimates or opinions, future events or results or Th

  3. Slide 3: Why Daura, Why Now

    THE OPPORTUNITY Why Daura, Why Now District-Scale Land Package Gold & Silver at Record Highs 15,900+ hectares in Peru strategically surrounding Highlander Silver's Gold above US$4,000/oz with silver outperforming. Exploration San Luis Project - one of the ten highest-grade gold-silver deposits compa

  4. Slide 4: Two Countries, Four Key Projects

    PROJECT OVERVIEW Two Countries, Four Key Projects PERU 15,900+ hectares | 100% owned Antonella-Libelulas 3,800 ha | Flagship | Drill-ready with historic drilling Peru Tayacoto + Agustina 2,000 ha | Polymetallic | Early-stage sampling Yanamina 4,700+ ha | Historical resource + expansion targets Argen

  5. Slide 5: The District Story

    PERU The District Story 15,900+ strategically surrounding Highlander Silver's San Luis Project hectares Adjacent to World-Class Discovery Highlander's San Luis hosts 356 koz Au at 24.4 g/t and 8.4 Moz Ag at 579 g/t - among the ten highest-grade projects globally in both metals. Exceptional Neighbor

  6. Slide 6: Antonella-Libelulas

    FLAGSHIP PROJECT Antonella-Libelulas 3,800 hectares surrounding Highlander Silver's Bonita | 100% owned Historic Drilling (2,461m in 12 holes) 22.4m @ 4.36 g/t Au 19.25 g/t Au 9 of 12 Best intercept from High-grade hit 0.8m Historic holes confirmed 36.8m with 23 g/t Ag with 241 g/t Ag mineralization

  7. Slide 7: Antonella-Libelulas – Bonita Adjacent Drilling

    TRUE CLOSEOLOGY Antonella-Libelulas – Bonita Adjacent Drilling Where Highlander's discovery meets Daura's ground Mineralization Confirmed Historical drilling at Antonella and recent results from Bonita confirm the presence of mineralization at depth. Single Vein System Interpretation The most robust

  8. Slide 8: Antonella North

    NEW DISCOVERY Antonella North ~1 km north of main zone | Two 5+ km structural corridors Dec 2025 - Feb 2026 Surface Sampling Highlights 57.34 g/t Au 55.83 g/t Au 24.63 g/t Au + 125 g/t Ag + 220 g/t Ag + 128 g/t Ag 22.84 g/t Au 12.33 g/t Au 7.98 g/t Au + 102 g/t Ag + 99 g/t Ag + 189 g/t Ag Significan

  9. Slide 9: Tayacoto

    POLYMETALLIC DISCOVERY Tayacoto 2,000 ha (Tayacoto + Agustina) | 100% owned | Adjacent to Highlander's Daniela 14.5 km NE of Antonella in Peru's prolific Ancash Belt (hosts Antamina and Barrick's past-producing Pierina) November 2025 Surface Sampling Highlights 6.1 g/t Au, 1,153 g/t Ag 3.3 g/t Au, 1

  10. Slide 10: Yanamina

    HISTORICAL RESOURCE Yanamina 4,700+ hectares | 100% owned | 40 km north of Antonella Historical Mineral Resources (0.50 g/t Au cut-off) Category Tonnes Grade (g/t) Gold (oz) Indicated 1,566,900 1.65 83,100 Inferred 3,235,000 1.19 123,700 Total 4,801,900 1.34 206,800 *A qualified person has not done

  11. Slide 11: Cerro Bayo: Drilling Now

    ARGENTINA Cerro Bayo: Drilling Now Deseado Massif, Santa Cruz Province | Option to earn up to 80% from Latin Metals 600+ 20+ Since 1990 in the Deseado Massif Moz Ag produced Moz Au produced Premier District Hosts world-class mines: Newmont's Cerro Negro (~7 Moz AuEq), Hochschild's San Jose (~64 Moz

  12. Slide 12: Cerro Bayo: IP Data & Targets

    DRILL TARGETS Cerro Bayo: IP Data & Targets Geophysical interpretation guiding drill program Ingrid Target 10 holes targeting clearly delineated structurally controlled zones, interpreted as potential mineralizing conduits and feeder structures. IP Survey Interpretation IP profiling identified resis

  13. Slide 13: Cerro Bayo / La Flora Option

    DEAL STRUCTURE Cerro Bayo / La Flora Option 75% Initial Option to Earn 80% Top-Up Option Cash Payments Based on resource estimate payment: US$7/oz for Measured & Indicated US$1,700,000 to Latin Metals over 38 months resources, US$5/oz for Inferred resources. US$400,000 to underlying vendor Initial:

  14. Slide 14: Management Team

    LEADERSHIP Management Team Mark D. Sumner Stuart Mills, M.Sc. Martin Zegarra CEO & Chairman VP of Exploration Exploration Manager 15+ years financing and leading exploration projects in 30+ years global experience in mineral exploration, 15+ years mineral exploration across epithermal, South America

  15. Slide 15: Board of Directors

    GOVERNANCE Board of Directors Mark D. Sumner Luis Saenz Dr. Ernesto Lima CEO, Chairman & Director Director Director 15+ years financing and leading exploration projects in 30+ years in corporate finance, strategic consulting, Majority shareholder of Estrella with 20+ years mining South America acros

  16. Slide 16: Capital Structure

    INVESTMENT Capital Structure ~84.3M ~32.1M ~7.0M Warrant Details 19,804,011 @ $0.10 exp. Jan 2027 Shares Outstanding Warrants Options 1,124,444 @ $0.115 exp. Mar 2027 200,247 @ $0.175 exp. Apr 2027 Fully Diluted: ~123.4M shares 16,153,900 @ $0.375 exp. Oct 2027 Major Shareholders ~10.8% insider owne

  17. Slide 17: Exploration Roadmap

    UPCOMING CATALYSTS Exploration Roadmap Cerro Bayo Phase 1 drill results - 22 holes, ~1,500m Q2 2026 Near-term Argentina program expansion based on Phase 1 success Peru drilling program at Antonella-Libelulas H2 2026 Mid-term Tayacoto follow-up work and target generation Yanamina resource verificatio

  18. Slide 18: Why Invest in Daura Gold?

    INVESTMENT THESIS Why Invest in Daura Gold? District-Scale Position in Proven High-Grade System High-Grade Results Across Multi-Asset Pipeline 1 4 Over 15,900 hectares surrounding Highlander Silver's Surface samples up to 57.34 g/t Au at Antonella North. Historic bonanza-grade San Luis Project in Pe

  19. Slide 19: Contact Us

    Contact Us Mark Sumner CONNECT WITH US CEO & Chairman x.com/DauraGold Kaitlin Taylor Investor Relations linkedin.com/company/daura-gold-corp PHONE youtube.com/@DauraGold +1 (647) 202-3904 EMAIL investors@dauragold.com WEBSITE TRADING TICKERS dauragold.com ADDRESS TSXV OTCQB 501 - 543 Granville Stree

Daura Gold — Investor Presentation (April 2026) on 6ix