  1. Slide 1: CCC Presentation Hera-Federation Complex Project Update

    CCC Presentation Hera-Federation Complex Project Update 27 May 2025 ASX Code: AMI

  2. Slide 2: Acknowledgement of Country

    Acknowledgement of Country • Aurelia Metals Ltd respectfully acknowledges the Ngiyampaa Nation as the Traditional Custodians of this land – both past and present. • We know this land has history, custodians and stories, spanning tens of thousands of years, that endure to this day. • We pay our respe

  3. Slide 3: Federation Hera Complex Progress

    3 Federation Hera Complex Progress Tracking Key Dates of Interest: • Kidman Way upgrade works were originally scheduled set to commence at Priory Tank Road 15 February 2025 and then move on to the Peak Intersection, This is likely to commence in August now with delays in design approval with Transpo

  4. Slide 4: Federation Hera Complex Progress

    4 Federation Hera Complex Progress 2nd Jumbo on site

  5. Slide 5: Federation Hera Complex Progress

    5 Federation Hera Complex Progress New emulsion yard installed by Orica • Emulsion is used to manufacture explosives. It is not an explosive however until it is mixed with a product known as “gasser”

  6. Slide 6: Federation Hera Complex Progress

    6 Federation Hera Complex Progress New emulsion tank

  7. Slide 7: Federation Hera Complex Progress

    7 Federation Hera Complex Progress New workshop construction

  8. Slide 8: Federation Mine Development

    8 Federation Mine Development Federation development 1 February 2025

  9. Slide 9: Federation Mine Development

    9 Federation Mine Development Federation development end of April 2025

  10. Slide 10: Environment and Community

    Environment and Community 27 May 2025 ASX Code: AMI

  11. Slide 11: Project Approval Modification

    11 Environment and Community Project Approval Modification Modification 2: • As reported at the last CCC meeting the company is seeking approval to modify the project approval • to increase the project’s of ore trucked to the Peak, • increase trucking numbers and increase trucking hours from 7pm to 10

  12. Slide 12: Environmental Priorities, Improvement Initiatives and Complaints

    12 Environment and Community Environmental Priorities, Improvement Initiatives and Complaints Priorities and improvement initiatives • Following up from a question at last meeting regarding the installation of a wash bay: • A wash bay has not been installed for ore trucks. It was decided that the be

  13. Slide 13: Environmental Priorities, Improvement Initiatives and Complaints

    13 Environment and Community Environmental Priorities, Improvement Initiatives and Complaints Priorities and improvement initiatives • De-watering remains a priority and a challenge. Preliminary investigations have commenced into looking transferring UG water from Federation to UG at Hera. This woul

  14. Slide 14: Groundwater Monitoring

    14 Groundwater Monitoring Groundwater monitoring completed in December. Quarterly SWL for Hera Bores. Quarterly SWL and water quality for Federation bores

  15. Slide 15: Air Quality Monitoring network

    15 Air Quality Monitoring network

  16. Slide 16: Air Quality – HVAS PM10

    16 — Air Quality - HVAS PM,, 60.0 50.0 40.0 30.0 PM; 9 (ug/m*) 20.0 10.0 bs bs b bs bs Vv asd py op” os’ PP PP oN 0.0 | \ oe s auretia “+

  17. Slide 17: Air Quality – HVAS TSP

    7 == Air Quality - HVAS TSP 140 TSP (ug/m*) 20 | > ll bs bs b bs be bs bs be > P95 ov ae ee Pos? 6 i" “i F° 6 RS as ‘s® op grips na wr SP ah auretia “+

  18. Slide 18: Air quality - EBAM

    18 Air quality - EBAM EBAM average daily concentrations of PM10. Comparison to NEPM criteria

  19. Slide 19: Air Quality – E-Sampler

    19 Air Quality – E-Sampler 1 E-Sampler 1 has had intermittent issues resulting in poor data capture. The sampler was replaced on 31st January 2025

  20. Slide 20: Air Quality – E-Sampler

    20 Air Quality - E-Sampler 2 30 25 NO Oo PMyo(ug/m*) BR a = Oo auretia “+

  21. Slide 21: Trucking to Peak

    21 Trucking to Peak Trucking to Peak commenced in November 2024. Trucking recommenced in the new year at the end of February. Note – Return trip from Federation to The Peak is counted as two movements. Average Total Quantity Month No. movements movements (tonnes) February 20 6.67 716.4 March 406 15.

  22. Slide 22: Blasting

    22 Blasting Blast monitoring recommenced in November 2024. Number of blasts each month were: January – 62 February - 55 March – 67 No exceedances were recorded.

  23. Slide 23: Exploration

    Exploration 27 May 2025 ASX Code: AMI

  24. Slide 24: Exploration

    24 Exploration • “Nymagee Mine” is the current focus for exploration in Nymagee area. A notification alerting residents to the works was emailed and circulated on 25 April 2025. • Update provided on successful drilling program at Federation. An extract of the announcement to the ASX has been circulat