Aurelia Metals Limited · ASX:AMI
Aurelia Metals — Corporate Update (August 2026)
20 slides from Aurelia Metals's corporate update, Aug 17, 2026
Slide 1: Peak/New Cobar CCC Presentation
Peak/New Cobar CCC Presentation 17 August 2026 ASX Code: AMI
Slide 2: Acknowledgement of Country
Acknowledgement of Country • Aurelia Metals Ltd respectfully acknowledges the Ngiyampaa Nation as the Traditional Custodians of this land – both past and present. • We know this land has history, custodians and stories, spanning tens of thousands of years, that endure to this day. • We pay our respe
Slide 3: July – September 2025
July – September 2025 data CCC Presentation
Slide 4: Safety is at the core of our business
Safety is at the core of our business Work, Health and Safety April – June 2026 Peak Safety performance was les than desired for the quarter with 2 recordable injuries of low severity which required medical treatment (Stitches) We continue to focus on lead management due to the increase in volumes b
Slide 5: Environment & Community
Environment & Community April – June 2026 ASX Code: AMI
Slide 6: Social licence to operate
Social licence to operate Seeking to deliver mutual benefit April – June 2026 • ANZAC day wreath laying • Cobar Show • Golf PGA tour • Workers ‘Clean up Australia Day’ • Outback Science and Engineering Challenge April – June 2026 data CCC Presentation
Slide 7: Seeking to deliver mutual benefit: donations
Seeking to deliver mutual benefit April – June 2026 Organisation Amount donated Details Cobar Yabbies $2,000 Western Districts AIF (Australian Imperial Forces) Swimming Carnival 08/02/2026 Castlereagh Womens Rugby League $8,500 Uniform costs and delivering a pre-season development clinic Cobar Arts
Slide 8: Peak Mines Environmental Incidents, Complaints & Initiatives
Peak Mines Environmental Incidents, Complaints & Initiatives April – June 2026 • 10 blast complaints received • 1 complaint about weeds on mine land • 1 complaint about dust at mine intersection April – June 2026 data CCC Presentation
Slide 9: April – June 2026 data CCC Presentation
April – June 2026 data CCC Presentation
Slide 10: Dust Deposition Gauges (EPL)
Dust Deposition Gauges (EPL) 7 6 5 Insoluble Solids (g/m2/month) 4 3 2 1 0 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Axis Title DM1 DM2 DM3 DM4 Bimbimbie Dellavale DM1 annual Ave DM2 Annual Ave DM3 Annual Ave DM4 Annual Ave Bimbimbie Annual Ave Dellvale Annu
Slide 11: Dust Deposition Gauges
Dust Deposition Gauges 4.5 4 3.5 Insoluble solids (g/m2/month) 3 2.5 2 1.5 1 0.5 0 Jul-25 Aug-25 Sep-25 Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 GC1 GC2 GC3 GC4 GC1 annual Ave GC2 Annual Ave GC3 Annual Ave GC4 Annual Ave April – June 2026 data CCC Presentation
Slide 12: Blast Vibration
mm/s 0 1 2 3 4 6 7 8 9 10 5 3/04/2026 5/04/2026 7/04/2026 9/04/2026 New Occ 11/04/2026 April – June 2026 data CCC Presentation 13/04/2026 15/04/2026 17/04/2026 Fort Bourke 19/04/2026 21/04/2026 23/04/2026 25/04/2026 Dellavale 27/04/2026 29/04/2026 1/05/2026 Salty 3/05/2026 5/05/2026 7/05/2026 9/05/2
Slide 13: Projects Update
Projects Update ASX Code: AMI
Slide 14: Projects: Great Cobar Development
Projects Great Cobar Development
Slide 15: Projects: Optimisation – Tails Thickener
Projects Optimisation –Tails Thickener
Slide 16: Projects: Historic Dewatering
Projects Historic Dewatering • Pipeline has been commissioned and running raw water • Electrical connection with Essential Energy in progress • Electrical Pump and control panel for historic shaft will be installed in June.
Slide 17: Projects: HV Access – Peak Way & Intersections
Projects HV Access – Peak Way & Intersections • Design & Engineering – final review by tfNSW roads • Construction has commenced and will transition to include the internal truck access widening • Signage is on main road to Peak access. • Proprietary road will commence at the completion of the Peak a
Slide 18: July – September 2025
July – September 2025 data CCC Presentation
Slide 19: Aerial Geophysical Survey
AERIAL GEOPHYSICAL SURVEY Commencing mid-late August 2026 • The Aurelia Metals Exploration team has engaged a company called Xcalibur Smart Mapping to conduct an aerial geophysical survey over a large portion of the Company’s tenement holdings. The survey will extend from Cobar to south of Nymagee.
Slide 20: July – September 2025
July – September 2025 data CCC Presentation