Tata Power Company Limited · NSE:TATAPOWER
Tata Power — The Tata Power Company — Investor Presentation (February 2011)
65 slides from Tata Power's investor presentation, February 2011
Slide 1: The Tata Power Company Ltd Presentation February 2011
Presentation Title The Tata Power Company Ltd February Presentation 2011 Subtitle 1
Slide 2: Disclaimer
Disclaimer Certain statements made in this presentation may not be based on historical information or facts and may be “forward looking statements”, including those relating to The Tata Power Company Limited’s general business plans and strategy, its future outlook and growth prospects, and future d
Slide 3: Agenda
Agenda Part A: Overview of Tata Power Part B: Sustainability Part C: Tata Power Generation Part D: Projects Part E: Transmission & Distribution Part F: Other Businesses Part G: Financials 3
Slide 4: Part A: Overview of Tata Power
Part A: Overview of Tata Power
Slide 5: A Tata Company
A Tata Company Tata Group FY10 Total Revenue Rs. 3,195.3 bn USD 67.4 bn Market Capitalization Operating Income PAT All figures in Rs. bn (as on 27Jan’11) (as of 31Mar’10) (as of 31Mar’10) Tata Consultancy 2,347 230.44 56.18 Services Tata Motors 756.09 353.73 22.40 Tata Steel 623.78 249.41 50.47 Tata
Slide 6: Integrated Across the Value Chain
Integrated Across the Value Chain - 30% ownership of KPC and Arutmin (18 MTPA equity coal) Fuel For Industry Overview - Domestic mines under development (4.9 MTPA) refer to appendix Shipping - 2 Cape size vessels owned Logistics - 3 long term charters Tata Power is - 2997 MW of generating capacity G
Slide 7: Businesses
Businesses Power Business Other Business • Indonesian Coal Mines [30%] (34) Fuel & • Tubed [40%] (25) • SED (49) Logistics • Mandakini [33%] (25) • Tata BP Solar [49%] (50) • Trust Energy [100%] (36) • Tata Projects [48%] • Trombay (14) • CGPL [100%] (22) • Hydro (14) • Maithon [74%] (24) Investment
Slide 8: Part B: Sustainability
Id TATA Part B: Sustainability Lighting up Lives! aye
Slide 9: Our Sustainability Model
Our Sustainability Model Care Care Care Care For the Environment For the Community For our Customers For our people Growth thru Principles of Energy Clubs Safety and Health renewables , clean / Community Customer Care Organisational green energy Engagement Centres Transformation Effici
Slide 10: Part C: Tata Power Generation
Part C: Tata Power Generation
Slide 11: Generation: Business Models
Generation: Business Models Current Model (Targeted) Returns Upside Value Drivers Our Projects (Capacity MW) Capacity Regulated Returns 64% Normative Savings on Norms. + Operational Efficiency Mumbai Operations, (1906 MW) (25%-35%) RoE PLF incentive Maithon Regulated Tariff 7% Tariff + PLF Savings o
Slide 12: Existing Presence
Existing Presence Other Projects: 1. Indonesian Coal Mines: 30% stake 2. Australia: Geodynamics, 10% stake 3. Australia: Exergen, 5% stake Powerlinks NDPL Gujarat Jojobera Jamshedpur (IEL) Mumbai Haldia Maharashtra Thermal Belgaum Karnataka Hydro Wind Transmission Distribution 12
Slide 13: Capacity Details and Fuel Mix
Capacity Details and Fuel Mix Location Capacity Fuel Capacity (MW) Percentage of (MW) Total Capacity Coal 1195 40% Trombay 1480 LNG/Natural Gas 595 20% Trombay – Merchant 100 Oil 300 10% Jojobera 428 Production Gas 239 8% IEL, Jamshedpur 120 Wind 221 7% Haldia 120 Hydro 447 15% Belgaum 81 Hydros, Ne
Slide 14: Mumbai Operations - Generation
Mumbai Operations - Generation Thermal Hydro Unit Capacity Fuel Location Capacity Unit 4* 150 MW Oil & Gas Khopoli 72 MW Unit 5 500 MW Oil, Coal & Gas Bhivpuri 75 MW Unit 6 500 MW Oil & Gas Bhira 300 MW Unit 7 180 MW Gas Total 447 MW Unit 8 150 MW Coal Total 1480 MW * Unit 4 on standby Regulated Equ
Slide 15: Merchant Capacity
Merchant Capacity 250 6 200 6 5 5 200 150 4 4 150 3 100 3 100 2 2 50 50 1 1 0 0 0 0 Q3FY10 Q4FY10 Q1FY11 Q2FY11 Q3FY10 Q4FY10 Q1FY11 Q2FY11 M Us Sold Realization (Rs/Unit) Haldia* Trombay - Unit 8 Project Capacity 100 MW 100 MW Customers PPA with Tata Power Trading PPA with Tata Power Trading Fuel H
Slide 16: Jojobera
Jojobera Generation (MU) Capacity 428 MW 3000 Unit 1: 67.5 MW, Unit 2-4: 120 MW each Fuel Type Domestic Coal 2500 Customer Tata Steel 20 year PPA till 2017 2000 Model Fuel and Interest are a pass through FY07 FY08 FY09 FY10 Other expenses on normative basis PLF (%) 73 76 80 80 1st Priz
Slide 17: Belgaum & IEL
Belgaum & IEL Capacity 81 MW Generation (MU) 500 Fuel Type Heavy Fuel Oil 400 Belgaum Customer KPTCL 300 12 year PPA till 2012 200 100 Business Model Fuel charge is a pass through 0 Other charges recovered as fixed FY07 FY08 FY09 FY10 cost PLF (%) 27 33 63 55 Capacity/COD 120 MW, Aug 2009 (PH-6)
Slide 18: Wind
Wind Capacity • ~221 MW Generation (MU) 400 320 Customer • Maharashtra: TPC-D 100 MW 3rd Party 21 MW 200 128 • Karnataka: BESCOM 50 MW 29 36 • Gujarat: GUVNL 50 MW 0 FY07 FY08 FY09 FY10 PLF (%) 19 20 19 19 FY11 Tariff* Annual (Rs / kwh) Escalation Maharashtra 3.95 Rs 0.15 till 2020 Karnataka 3.40 Ni
Slide 19: Part D: Projects
TATA Part D: Projects ae :
Slide 20: Projects Under Execution
Projects Under Execution DHPC Bhutan Maithon Tubed Mundra Mithapur Jojobera Lodhivali Mandakini Mulshi Thermal 5210 MW Maharashtra Wind 242 MW Solar 28 MW Tamil Nadu Hydro 126 MW Coal 13.5 MTPA 20
Slide 21: Generation Capacity (Tata Power Group)
Generation Capacity (Tata Power Group) 8605 9000 2526 Capacity at end of year 8000 Capacity added in the year 7000 6079 1743 6000 Capacity 4336 5000 2978 1318 4000 2786 192 CGPL 1600 CGPL 2400 3000 421 Wind 118 DHPC 126 2365 IEL 120 Mithapur 25 2000 PH6 120 Maithon 1050 Unit 8 250 Wind 42 Wind 145 W
Slide 22: Mundra UMPP
Capacity 4000 MW (5 X 800 MW) Customers Gujarat (1805 MW), Maharashtra (760 MW), Punjab (475 MW), Haryana (380 MW), Rajasthan (380 MW) Fuel Imported Coal – 11-12 mtpa Requirement & Offtake agreement with KPC and Arutmin for 10.11 ± 20% Source Looking for additional mines in Australia, Moza
Slide 23: Mundra UMPP: Payment Security Mechanism
Mundra UMPP: Payment Security Mechanism Letter of Credit (LC) for 1.1x of the average monthly bill for supply of electricity An escrow account into which all the payments are made (incl.1.1 month’s average bill amount) If the LC is drawn upon, the escrow account will be used to re-instate the
Slide 24: Maithon
Capacity 1050 MW (2 X 525 MW) Customers DVC (300 MW), NDPL (300 MW), WBSEB (150 MW), PSEB (300 MW) Long term (30 yr) PPAs commence on CoD for DVC & 1st April 2012 for NDPL, WBSEB & PSEB. Power generated available for sale in open market in the interim Fuel Domestic Coal; 100% linkage sanctio
Slide 25: Captive Coal Blocks
Captive Coal Blocks 7.5 mtpa (jointly allotted with Jindal Photo Film and Monnet Ispat & Energy - each JV Partner having a share of 2.5 MTPA) at Dist. Angul, Orissa Mining plan approved by MoC NOC from Central Ground Water Board and Consent to proceed from State Pollution control Mandakini Coa
Slide 26: Hydro Projects
Hydro Projects 2 x 63 MW run of the river Hydro project with Tata Power holding 26% and Royal Govt. of Bhutan holding 74% Project cost-USD 200 million with debt equity of 60: 40; debt tied up with ADB and others Dagacchu 126 MW PPA signed with Tata Power Trading Hydro project Bhutan Power Tr
Slide 27: Tata Power Solar Intent
Tata Power Solar Intent We expect to have 300 MW solar based capacity over the next 4-5 years. Indian Solar Scenario For details refer to Appendix Carnac Corporate Centre Rooftop Mulshi One of the largest grid-connected solar power plant in Maharashtra Capacity 3 MW Technology Crystalline sili
Slide 28: Projects in Pipeline
Projects in Pipeline Phase 1 Project Fuel Source Capacity (MW) Status Coastal Maharashtra Imported Coal 1600 Land Acquisition in progress (Dehrand) Land Acquisition in progress Captive Coal - Naraj Marthapur IPP 660 Environmental Clearance Mandakini Granted, PPA to be signed Captive Coal – Tubed Tir
Slide 29: Part E: Transmission and Distribution
Part E: Transmission and Distribution
Slide 30: Transmission - Mumbai
Transmission - Mumbai Tata Power (TPC-T) is among the 3 transmission licensees that bring power into Mumbai The TPC-T transmission network comprises of about 1100 CKm of 220kV/ 110 kV lines and 17 receiving stations that evacuate power from the Trombay and hydro generating stations Network upg
Slide 31: Powerlinks Transmission Limited
Powerlinks Transmission Limited India’s first private sector inter-state transmission project on a BOOT basis Implemented through a JV between Tata Power (51%) and Powergrid (49%) This is a part of the transmission system associated with the 1020 MW Tala hydro-electric Project in Bhutan, East-
Slide 32: Mumbai Distribution
Mumbai Distribution Among 3 private distribution licensees viz. Tata Power, BEST and R-Infra in Mumbai After MERC allowed changeover of customers from R-Infra to Tata Power in Oct 2009, TPC-D has added over 75,000 changeover customers (as of Q3FY11) to build a base of over 100,000 retail custome
Slide 33: North Delhi Power Limited (NDPL)
North Delhi Power Limited (NDPL) JV between Tata Power and Govt. of Delhi Among three private licensees to distribute power in North and North West Delhi Consistently overachieved AT&C targets The only dividend paying utility in Delhi Tariff revision pending with the Regulator (last tariff
Slide 34: Part F: Other Businesses
Id TATA Part F: Other Businesses Lighting up Lives! ye *
Slide 35: Indonesian Coal Mines Investment
Indonesian Coal Mines Investment Structure Control Considerations Tata Power Entitled to proportionate (30%) cash surplus of Company Ltd. coal operating companies (India) 2 out of 5 on the Board of Commissioners and the Board of Directors with affirmative rights on key issues such as Bhivpuri Bhir
Slide 36: Indonesian Coal Mines
Indonesian Coal Mines Operating Performance CY ’09 CY ‘08 Quantity mined (MT) ~63 ~53 Average Selling Price (FOB USD/ton) ~62 ~73 EBITDA from Operations (USD mn) 815 1131 Source – Bumi Resources Production capacity planned to reach 75-80 MTPA by CY 2012 Further capacity expansion to 100 MTPA pla
Slide 37: Shipping Subsidiaries
Shipping Subsidiaries Trust Energy Resources Pte Ltd incorporated in Singapore for owning ships to meet shipping requirements and trading in fuels, Energy Eastern Pte Ltd incorporated for chartering of ships Shipping requirement for Mundra - 6 vessels going up to 8 vessels by FY13 To be met th
Slide 38: Strategic Electronics Division (SED)
Strategic Electronics Division (SED) Originated as an internal R & D unit for power electronics. Revenues of Rs.1.23 bn (Mar 10) against Rs.1.01 bn during the previous year. First batch of Pinaka Launchers was successfully subjected to Factory Acceptance Tests (FAT) by the Ministry of Defence.
Slide 39: Tata BP Solar
Tata BP Solar 51:49 JV between BP Solar and Tata Power to manufacture multi-crystalline cells and modules Market leader in Solar Photovoltaic technology in India with a turnover of Rs 9.76 bn in FY10 The turnover of the Co. in India and SAARC region is about Rs. 2.78 bn. With exports to BP Sol
Slide 40: Part G: Financials
TATA Part G: Financials ae :
Slide 41: Funding Requirement (FY11-FY13)
Funding Requirement (FY11-FY13) Own Funds Debt (Rs.47 Billion) (Rs.132 Billion) • FCCB proceeds (as on Mar 31, ‘10): • Domestic loans through domestic financial institutions, banks and capital markets $ 250 mn (equivalent to Rs. 12 bn) • Balance from Internal accruals: Rs.35 bn • Foreign loans throu
Slide 42: Tata Power – Financials (Standalone)
Tata Power – Financials (Standalone) Profit After Tax (In Billion Rs.) Standalone Numbers (YTD Q3FY11) 8.7 9.22 9.39 6.97 6.11 Debt: Rs. 65.6 bn Equity: Rs. 112.9 bn Cash: Rs. 8.5 bn 2006 2007 2008 2009 2010 D/E: 0.58 EPS (in Rs.) Net Worth (In Billion Rs.) 44 41 91.32 39 34 71.85 29 63.63 40.1 44.6
Slide 43: Tata Power – Financials (Consolidated)
Tata Power – Financials (Consolidated) Profit After Tax (In Billion Rs.) Consolidated Numbers (YTD Q3FY11) 19.67 Debt: Rs. 231.3 bn 12.19 10.55 Equity: Rs. 137.1 bn 7.47 7.59 Cash: Rs. 22.9 bn D/E: 1.7 2006 2007 2008 2009 2010 Net D/E: 1.5 EPS (in Rs.) Net Worth (In Billion Rs.) 104.77 85.01 76.43 5
Slide 44: Dividend History
Dividend History 50 50 Dividend (Rs) 45 EPS (Rs) 45 40 Payout Ratio (%) 40 35 35 30 30 Rs 25 25 % 20 20 15 15 10 10 5 5 0 0 FY06 FY07 FY08 FY09 FY10 44
Slide 45: Thank you
kd TATA Thank you We take pride in Lighting up Lives! Lighting up Lives! TATA POWER :; 3K
Slide 46: Appendix
TATA <a : Appendix
Slide 47: India – Capacity Requirement
India – Capacity Requirement 741 Efficiency Assumptions PLF - 70% in 2009 to 75% in 2017 T&D loss - 28% in 2009 to 18% in 482 GW 600 2017 & continuing in 2030 500 287 GW 187 GW 313 Peaking Base Load 495 163 GW 400 150 330 211 115 Business as usual Low Growth Business as usual High growth Installed C
Slide 48: Peak load deficit will continue despite aggressive capacity augmentation
As per current plans an aggressive capacity augmentation peak load deficit will still continue with possibly a small base load surplus with an average growth of 7% Installed Capacity Requirement to meet Base Load and Peak Load Requirement 2017 (GW) (25% % of reqd.) 300 (8.5 % of reqd.) 40 77 18 1 20
Slide 49: Electricity Consumption
Electricity Consumption Electricity Consumption in Bn Kwh 1500– 3200 4500 Kwh/capita 4000 3500 3000 2500 900 – 1350 Kwh/capita 2000 1500 600 Kwh/capita 1000 500 0 2010 2020 2030 Assumptions: Population grows by CAGR of 1.5% 1. High growth would also result in a high growth in per capita electricity
Slide 50: Key Challenges Remain
Key Challenges Remain Land acquisition will remain a key challenge to overcome Land acquisition is viewed as a way to benefit the community Our principles of engagement also help avoid / minimize the challenge Land of using Acquisition Agricultural land Land for dwelling Forest land La
Slide 51: Domestic Coal Requirement
Domestic Coal Requirement 780 Import requirement 730 could go 680 from 50 MT to 160 MT 620 496 430 FY07 FY08 FY09 FY10 FY11 FY12 Demand CIL Low Production Aggressive Demand CIL Plan • Difficulties of access to captive coal blocks remain a concern • Wide range of coal import need can impact both impo
Slide 52: Tata Power - Pioneer in Indian Power Sector
Tata Power - Pioneer in Indian Power Sector First to Introduce SCADA and First 800 MW Fibre Optic super critical ground wire thermal unit 220 kV communication Cable Computerized Transmission grid control Network and energy First pump management storage unit First Flue Gas system in the country 500 M
Slide 53: Non-PPA Capacity - Mumbai
Non-PPA Capacity - Mumbai Starting April 1, 2010 we expected to have 358 MW (excl. 42 MW from Unit 4) to be released from any PPA/ allocations We expected ~160 MW of this to be used for our new retail customers in FY11 since we are adding ~500 customers daily and we expect this demand to increas
Slide 54: Mundra – Site Photographs
Mundra – Site Photographs Plant view from Skimmer Bay 54
Slide 55: Mundra – Site Photographs
Mundra – Site Photographs View from chimney top – Sea water Intake channel 55
Slide 56: Mundra – Site Photographs
a. Mundra — Site Photographs TATA Lighting up Lives! oe
Slide 57: Mundra – Site Photographs
Mundra – Site Photographs Stacker Cum Reclaimer work in ICHS area 57
Slide 58: Mundra – Site Photographs
Mundra – Site Photographs Sheeting work on coal conveyor 58
Slide 59: Mundra UMPP Progress Update
Progress External Linkages Update New Coal Jetty (MPSEZL): 1st vessel berthed in December 2010 at West Port Jetty Power Evacuation Lines (Powergrid): Work in progress for 400 KV transmission lines of Mundra-Vadavi, Mundra-Jetpur, Mundra-Limbdi, and Gandhar-Navsari Unit #1 TG put in turning gea
Slide 60: Maithon – Site Photographs
Maithon – Site Photographs BTG Area 60
Slide 61: Maithon – Site Photographs
Maithon – Site Photographs Unit 1 TG Floor 61
Slide 62: Maithon Progress Update
Progress External Linkages Update Railway siding to undergo some modification due to Delhi-Kolkata rail corridor being planned. Would require additional capex of ~Rs. 3.80 bn due to land acquisition and railwork. Phase I to be completed by December 2011 Plan to transport coal from BCCL mines by
Slide 63: The Indian Solar Scenario
The Indian Solar Scenario NATIONAL SOLAR MISSION (CENTRAL LEVEL) TARGET Grid-parity for solar power by 2022, and coal-based parity by 2030 ROADMAP Installed Capacity Phase I Phase II Phase III (in MW) 2009 - 2013 2013 - 2017 2017 - 2022 Grid-connected 1000 - 2000 4000 – 10,000 20,000 Off-grid 200 10
Slide 64: Standalone – Q3 FY11
Standalone – Q3 FY11 Rupee in Billions Q3 FY11 Q3 FY10 YTD YTD Q3FY11 Q3FY10 Operating Income 16.52 15.66 51.56 53.03 Operating Expenditure (13.06) (11.99) (39.90) (38.78) Operating Profit 3.46 3.67 11.66 14.25 Interest (1.09) (0.93) (2.97) (3.12) Financial Charges (0.14) (0.03) (0.32) (0.12) Deprec
Slide 65: Consolidated – Q3 FY11
Consolidated – Q3 FY11 Rupee in Billions Q3 FY11 Q3 FY10 YTD YTD Q3FY11 Q3FY10 Operating Income 44.41 45.16 144.35 141.22 Operating Expenditure (33.71) (39.64) (110.62) (114.06) Operating Profit 10.70 5.52 33.73 27.16 Interest (2.11) (1.86) (5.91) (5.79) Financial Charges (0.16) (0.05) (0.43) (0.14)
The Tata Power Company — Investor Presentation (February 2011) on 6ix