Gemfields Group Limited · JSE:GML

Gemfields — Technical Presentation (December 2016)

89 slides from Gemfields's technical presentation, December 2016

  1. Slide 1: Site visit 6th - 11th December 2016

    A leading supplier of responsibly sourced coloured gemstones Site visit 6th - 11th December 2016 Gemfields Plc

  2. Slide 2: Legal disclaimer

    Legal disclaimer This document, which has been issued by Gemfields Plc (the “Company”), This document does not and is not intended to constitute an offer of securities for comprises the written materials/slides for a presentation concerning the distribution or sale in the United States or any other

  3. Slide 3: Kagem Emerald Mine

    Kagem Emerald Mine Dibya Baral Gemfields Plc 2

  4. Slide 4: Gemfields & The Government of Zambia

    Gemfields & The Government of Zambia A Model Collaboration GEMFIELDS Plc GOVERNMENT OF ZAMBIA 75% 25% THE KAGEM EMERALD MINE World’s largest Employees: 891 Location: ZAMBIA emerald mine 50% 50% THE KARIBA AMETHYST MINE World’s largest Location: ZAMBIA Employees: 251 amethyst mine Kagem license over

  5. Slide 5: Kagem Emerald Mine: Location Map

    Kagem Emerald Mine: Location Map Kitwe Kagem Emerald Mine Lusaka Kariba Gemfields Plc 4

  6. Slide 6: Kagem Location in Ndola Rural Restricted Area

    Kagem Location in Ndola Rural Restricted Area 606 000mE 616 000mE 626 000mE 636 000mE NDOLA RURAL EMERALD RESTRICTED AREA 406 407 410 408 414 403 409 402 405 435 404 229 223 444 412 401 411 443 449 447 450 322 400 324 323 8 560 000mN 8 560 000mN 443A 413 432 436 433 440 295 260 416 355 314 296 317 2

  7. Slide 7: Kagem Location In Emerald Area

    Kagem Location In Emerald Area Location Gemfields Plc 6

  8. Slide 8: Geology and Prospectivity

    Geology and Prospectivity Geology Gemfields Plc 7

  9. Slide 9: Kagem Licence Overview Map

    Kagem Licence Overview Map Geology Gemfields Plc 8

  10. Slide 10: Kagem Turnaround

    Kagem Turnaround Pre 2008 - 2016 • Loss making • Environmentally Degrading • Short-term plan and deferred mine development • Widespread Pilferage • Unsafe operations • Little or no geological knowledge • Demotivated Workforce • No Community engagement Today • Profit making, Tax and Dividend Paying •

  11. Slide 11: Exploration Work Flow

    Exploration Work Flow Exploration 625200 E 625300 E 625400 E 625500 E 625600 E 625700 E 625800 E 625900 E 626000 E 626100 E 626200 E 626300 E 626400 E 626500 E 626600 E 626700 E 626800 E 626900 E 627000 E 627100 E 627200 E 627300 E KLB 85 8554800 N RL 1190.607 TD 152.50 KLB 101 RL 1194.242 KLB 95 85

  12. Slide 12: Prospects

    Total Blocks No. of DHs Total meters 835 85,988 Prospects 6 SEMPALA VILLAGE DUMP SANDAWANA POLICE CAMP DUMP BULK SAMPLING PIT BULK SAMPLING PIT PIT RADIO TOWER PIT SANDAWANA PIT PIT PIT FIBOLELE DAM FIBOLELE FIBOLELE PIT PIT FIBOLELE POLICE CAMP POLICE CAMP PIT PIT LE E HU ULLE NC HU KA NCCH AN KKA

  13. Slide 13: Kagem JORC Resource and Reserves update

    Kagem JORC Resource and Reserves update Resource Summary Proved/Probable Measured, Indicated and Post-tax NPV Average annual Open pit mine Ore Reserves Inferred Mineral Resource production plan until 1.1bct at diluted ore grade (E+B) 1.8bct at diluted ore grade (E+B) US$520m 44.7mct 10% discount rat

  14. Slide 14: Mine Geology

    Mine Geology LAT/SOIL MS Pegmatite Discordant QT QT shear QT shear TMS AMPH FMS FW shear Pegmatite concordant Gemfields Plc 13

  15. Slide 15: Geology: Emerald Mineralisation

    Geology Emerald Mineralisation EMERALD MINERALISATION 1. Occurrence of Host rock (TMS) and presence of Chromoferic elements (Cr, V) in its composition 2. Intrusion of Pegmatite containing Beryllium elements 3. Alteration / Reaction / Ionic exchange between the pegmatitic fluids and the host rocks 4.

  16. Slide 16: Mine Development

    Mine Development PB-5, looking to high wall Gemfields Plc 15

  17. Slide 17: Chama Progress in Mine Footprint

    Chama Progress in Mine Footprint Sep-2014 Jun-2013 Aug-2016 Mine Development 16

  18. Slide 18: Mine Geology: Chama Geology

    Mine Geology Chama Geology 17 Block Model looking to high wall

  19. Slide 19: Mine Planning and Scheduling

    Mine Planning and Scheduling Gemfields Plc 18

  20. Slide 20: Fibolele Sector Bulk Sampling

    4 Ha Proposed Fibolele Sector Bulk Sampling 8556900N 8556900N Successful Bulk Sampling Operation 8556800N 8556800N 8556700N 8556700N X` W` V` 8556600N 8556600N U` T` R` S` Exposed TMS Q` 8556500N 8556500N P` O` Gemfields Plc 8556400N 19 8556400N N` M`

  21. Slide 21: Libwente Sector Bulk Sampling

    Libwente Sector Bulk Sampling Accelerating the Search Libwente South pit Gemfields Plc 20 Ishuko South pit

  22. Slide 22: Washing Plant: Last Year

    Washing Plant Last Year Gemfields Plc 21

  23. Slide 23: Washing Plant: Today

    Washing Plant Today Gemfields Plc 22

  24. Slide 24: Value Addition – Sort House

    Value Addition – Sort House (i) Grading and Sorting (ii) Reliability (iii) Marketing (iv) Service Sorting and grading • Pioneered the world’s most comprehensive grading and sorting system for rough emeralds and rubies • Supported by the commensurate stock levels needed to ensure consistency of suppl

  25. Slide 25: Highlights and Mine cost analysis for Kagem, Zambia

    Highlights and Mine cost analysis for Kagem, Zambia A total of US$6.1m capex invested in Kagem in FY2016 Annual production Emerald and beryl of emerald and beryl grade for the year 30.0mct 241 ct/t 2015: 30.1 million carats (‘mct’) 2015: 242 carats per tonne (‘ct/t’) Total operating costs Unit opera

  26. Slide 26: Kagem Monthly Excavation / Gemstone Production

    Kagem Monthly Excavation / Gemstone Production TRH (t) $/ t Production Emerald+Beryl (carats) Gemfields Plc 25

  27. Slide 27: Value Addition — Local Employment

    Value Addition — Local Employment Increased mining activity created Employment Opportunities at Kagem 882 891 695 624 548 479 445 451 392 30 Jun 08 30 Jun 09 30 Jun 10 30 Jun 11 30 Jun 12 30 Jun 13 30 Jun 14 30 Jun 15 30 Jun 16 Gemfields Plc 26

  28. Slide 28: Mining Outlook

    Mining Outlook Production ramp up • Established the continuity of the host lithology all over the license and specifically over 300m along the dip and to a vertical depth of 150m by mining at Chama. • Further systematic exploration besides establishing the continuity over 500m down dip along the riv

  29. Slide 29: Sustainability

    Sustainability Gemfields Plc 28 Gemfields Plc

  30. Slide 30: Corporate social responsibility

    Corporate social responsibility Sustainability in Education, Health and Agriculture Gemfields Plc 29

  31. Slide 31: Corporate social responsibility

    Corporate social responsibility Sustainability in Education, Health and Agriculture Gemfields Plc 30

  32. Slide 32: Corporate social responsibility

    Corporate social responsibility Sustainability in Education, Health and Agriculture Gemfields Plc 31

  33. Slide 33: Montepuez Ruby Mining

    Montepuez Ruby Mining Ashim Roy Gemfields Plc 32

  34. Slide 34: Montepuez Ruby Mining Lda

    Montepuez Ruby Mining Lda Mwiriti Lda 75% 25% Potentially the world’s single largest ruby deposit Gemfields Plc 33

  35. Slide 35: Timeline

    Timeline 2009 2009 Rubies first discovered in Montepuez 3rd 3rdJun Jun2011 2011 JV agreement signed between Gemfields plc and Mwiriti Lda th th 3030 Aug Aug2011 2011 Montepuez Ruby Mining Lda (MRM) comes into existence 2424 th th Feb 2012 Feb 2012 The mining licenses 4702 and 4703 issued in the name

  36. Slide 36: Location of Montepuez Ruby Mining

    Location of Montepuez Ruby Mining MRM 4703 C  MRM obtsained a 25-years of Mining and Exploration Licence (4702 & 4703c) in February 2012 for an area of 336 sqkm.  Subsequently, the Process of Amalgamation of concessions was accomplished in 2015 & a new concession bearing no. 4703C for an Gemfields

  37. Slide 37: Ruby Formation

    Ruby Formation Geological history The African setting The Asian setting The Pan-African orogeny (Figure 1) occurred 750–450 million years ago, and gave rise to deposits in Kenya, Tanzania, Mozambique, Madagascar, Sri Lanka and southern India. Many of these corundum are genetically related. In contra

  38. Slide 38: Ruby Formation

    Ruby Formation How? Gemfields Plc 37

  39. Slide 39: Ruby Formation: Primary Ruby Mineralisation

    Ruby Formation Primary Ruby Mineralisation Unlike many other rocks, rubies and sapphires can only form under a limited Range of high pressure and temperature. These rare conditions occurred during Continental plates crashed in Archean times. Veins The rock type found associated with this P & T are A

  40. Slide 40: Ruby Formation: Primary Ruby Mineralisation

    Ruby Formation Primary Ruby Mineralisation Corundum (Al2O3) can only form in a limited range of high pressures and high temperature condition in a Silica (SiO2) deficient condition. When solutions rich in Alumina (Al2O3) intrudes a host rock rich in Cr, Fe and V. The corundum gains a red/pink color.

  41. Slide 41: Ruby Formation: Secondary Ruby Mineralisation

    Ruby Formation Secondary Ruby Mineralisation Ruby is liberated by physical and chemical weathering process from rocks, concentrated by water/gravity and deposited as alluvial/colluvial material over weathered bedrock. The size, intensity variation and total area of this deposition is unknown and in

  42. Slide 42: Geology: Multidisciplinary Approach

    Geology Multidisciplinary Approach: Geological • Typical association with certain rocks or minerals Geophysical Method • Magnetic susceptibility, specific gravity conductivity, radioactivity Geochemical Method • Chemical signatures of hidden mineral deposits often dispersed over wide areas by chemic

  43. Slide 43: Geology: Geological Mapping

    Geology Geological Mapping: Shuttle Radar Topography Mission (SRTM) data. Digital Elevation Models Gemfields Plc 42

  44. Slide 44: Geology

    43 Geology Gemfields Plc 43

  45. Slide 45: Exploration: Core and Auger Drilling

    Exploration Core and Auger Drilling  The exploration programme incorporates: (i) Core drilling (ii) Auger drilling  Till Oct’16, total core drilling of 22,500m  Till date, auger drilling 21,217m Gemfields Plc 44

  46. Slide 46: Maninge Nice Area

    Maninge Nice Area Amphibolite Gravel Bed Figure 1 Bore holes Figure 2 Figure 1 showing the 3D model of paleo channel with gravel bed ( > 10 cm) with ruby mineralisation in the two exploration blocks. Figure 2 showing 3D model of primary mineralised Amphibolite body (Green) at Maninge nice area with

  47. Slide 47: Reserve Estimation

    Reserve Estimation SRK’s JORC complied report • Ore Reserves of Montepuez Ruby Mining in accordance with the JORC Code (2012) released on 22nd July 2015 • 467 million carats of indicated & 432 million carats of probable mineral reserve. (covering 36 sq. km based on exploration drilling till December

  48. Slide 48: Mining

    Mining Performance • Average stripping ratio of 1:5 (Ore:Waste) • Total ore mined until september 2016: 1.6 millions tonnes • Total waste mined until september 2016: 8 millions tonnes • 8 pits actively mined Gemfields Plc 47

  49. Slide 49: MRM Progression

    MRM Progression 2012 - 2016 • Year 1: 90, 000 tons total rock handling and 1.9 million carats • Year 2: 1.6 million tons total rock handling and 6.5 million carats • Year 3: 3 million tons total rock handling and 8.4 million carats • Year 4: 3.5 million tons total rock handling and 10.3 million cara

  50. Slide 50: Processing

    Processing Wash Plant Upgradation A wash plant has been in operation and its operating parameters continue to be improved simultaneously with the general understanding of the ore characteristics. Initial 50 tph pilot wash plant has been augmented to a 70 tph realistic and more efficient capacity sin

  51. Slide 51: Expertise in Sorting & Grading

    Expertise in Sorting & Grading Sort House Presently, hand sorting is conducted in a highly secure environment by a team of highly skilled sorters. Gemfields has developed the worlds’ first grading system for rough rubies. This system has been widely accepted by customers as it helps them assurance o

  52. Slide 52: Sort house upgradation

    Sort house upgradation • A State-of-the-Art ruby recovery plant to be added to the circuit by Q1 2018 • To produce 20million carats by FY 2018-19 • Installation of four optical sorting units for the first time in the world • Hands off sorting and classifying • Total cost of the new recovery plant es

  53. Slide 53: Sustainability

    Sustainability • The MRM Community Development Strategy (MRM-CDS) has been prepared with an objective to ensure that the local community benefits from the presence of MRM, in a way that is both sustainable and meaningful. • MRM-CDS seeks to enhance the socio-economic standards of the surrounding com

  54. Slide 54: Community Development

    Community Development Community and Social Investment • Further to the country’s economy benefitting from rubies as a natural Mozambican resource, we also strongly feel that the local communities should directly benefit from our presence. Our CSR programme is built around: Community development • He

  55. Slide 55: Community Development

    Community Development Community and Social Investment • Development of local farming associations and empowering women by forming Women’s chicken farming cooperative • Development of secondary schools and skills schools • Development of Medical centres Gemfields Plc 54

  56. Slide 56: Environmental Conservation

    Environmental Conservation Conservation funding We are committed to mining in a way that not only has the least impact on the environment but to leave it in a better state than what we found  Old pits to be re-filled, re-planted or filled with water and seeded with fish  No harmful chemicals used

  57. Slide 57: Thinking Ahead

    Thinking Ahead • We have improved the living conditions of our employees by investing huge amount in camp infrastructure of about US$ 5 million • We have a robust training program to develop the skills of our employees and we certificate them for every course that they complete • The security person

  58. Slide 58: Economic Impact

    Economic Impact • Building Mozambican rubies as a valuable natural resource • Paying Taxes - MRM pays approximately 20% of the corporate tax generated in Cabo Delgado • Generating foreign exchange for the country • Creating Employment - Most of our workforce is sourced from local villages and for th

  59. Slide 59: Transparency

    Transparency AUCTION RESULTS JUNE’14 DECEMBER’14 APRIL’15 JUNE’15 DECEMBER’15 JUNE’16 (RUBY & CORUNDUM) AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION Dates 12-17 June’14 3-8 Dec’14 17-22 April’15 16-21 June’15 14-18 Dec’15 13-19 June’16 Location Singapore Singapore Jaipur Singapore Singapore Singa

  60. Slide 60: End of year results Financial Highlights

    End of year results Financial Highlights Gemfields Plc 59

  61. Slide 61: Financial highlights

    Financial highlights Full year to 30 June 2016 Revenues US$ EBITDA US$ Gross profit margin 193.1m (+12.7%) 69.4m (+7.8%) 49% 2015: 50% 2015: 171.4 million (‘m’) 2015: 64.4m EBITDA margin 36% 2015: 38% Net Profit After Tax US$ Cost of gemstone and Fabergé Cash in hand US$ 23.5m 41.5m inventory US$ 20

  62. Slide 62: Revenue analysis – six auctions held during the year

    Revenue analysis – six auctions held during the year 2016 saw the highest ever auction revenue achieved at any Gemfields’ auction Higher, medium and Higher quality (‘HQ’) $200m Fabergé, UK Sales & Other commercial quality rough rough emeralds rubies Singapore, September 2015 $180m 18.9 Singapore, De

  63. Slide 63: Mine cost analysis for Kagem, Zambia (75% owned)

    Mine cost analysis for Kagem, Zambia (75% owned) A total of US$6.1m capex invested in Kagem in FY2016 Annual production Emerald and beryl • Kagem achieved similar of emerald and beryl grade for the year production levels to 2015 at 30.0mct 241 ct/t 30.0mct 2015: 30.1 million carats (‘mct’) 2015: 242

  64. Slide 64: Mine cost analysis for Montepuez, Mozambique (75% owned)

    Mine cost analysis for Montepuez, Mozambique (75% owned) A total of US$7.5m capex invested in Montepuez in FY2016 Annual production Average ruby and of rubies and corundum corundum grade • Step-up in production, exploration and bulk 10.3mct (+22.6%) for the year sampling activities delivered 2015: 8

  65. Slide 65: Consolidated income statement

    Consolidated income statement For the year ended 30 June 2016 % change In thousands of US$ 2016 2015 for the year Revenue 193,140 171,448 13 Cost of sales (98,827) (86,483) 14 Gross profit 94,313 84,965 11 Other income 427 747 (43) Selling, general and administrative expenses (54,848) (55,309) (1) P

  66. Slide 66: End of year results operational highlights

    End of year results operational highlights Gemfields Plc 65

  67. Slide 67: Kagem mine

    Kagem mine Believed to be the world’s single largest producing emerald mine (75% ownership) FY2016 highlights Outlook • Increase in the consistency of production, supported by overall • Target of 30-35mct of emerald and beryl production for FY2017. increase in scale of operations Goal to increase pr

  68. Slide 68: Montepuez mine

    Montepuez mine Considered to be the world’s single largest producing ruby and corundum deposit (75% ownership) FY2016 highlights Outlook • 10.3mct of ruby and corundum (2015: 8.4mct) and grade • Target of 10-12mct of ruby and corundum production for FY2017 of 35ct/t (2015: 26ct/t) supported by an up

  69. Slide 69: Leading the way and growing the business

    Leading the way and growing the business Other gemstone opportunities – targeting low cost, high value acquisitions Geographic and product diversification Dogogo South Block in early June 2016 and through investment in exploration and drilling commenced in July 2016 development of existing assets in

  70. Slide 70: Fabergé

    Fabergé (100% ownership) • Revenues grew 33% to US$11.8m for the year (2015: US$8.9m) following a number of agreements with multi-brand retail partners • Number of units sold and delivered increased by 81%. • At 30 June 2016, Fabergé products were available in 14 countries and the total number of bo

  71. Slide 71: Outlook

    Outlook Gemfields Plc 70

  72. Slide 72: Driving further value – upcoming milestones

    Driving further value – upcoming milestones Significant growth opportunities Mining Auctions and sales • Stable demand for coloured gemstones expected Kagem • Target of four emerald and beryl (two high and two commercial quality • Increasing production target to 30-35mct of emerald and beryl auction

  73. Slide 73: Sales & Marketing

    Sales & Marketing Gemfields Plc 72

  74. Slide 74: Market overview

    Market overview World records continue to be broken in the gemstone sector pushing up prices and demand • The market of worked emeralds, rubies and sapphires • European jewellery showed diverging dynamics – France’s continued to expand during 2015 imports of the top three coloured gemstones doubled

  75. Slide 75: Auction results

    Auction results Higher Quality Emerald Commercial Quality Emerald Rubies Total sales realised at auction (US$m) Total sales realised at auction (US$m) Total sales realised at auction (US$m) 36.5 34.9 34.7 19.2 44.3 31.6 31.5 33.1 15.2 16.4 15.5 14.5 43.3 14.3 26.2 26.8 33.5 29.3 19.6 10 11 9 28.8 7.

  76. Slide 76: Chopard – Case Study, May 2016

    Chopard – Case Study, May 2016 Gemfields continued to champion industry- • To mark the occasion, Chopard unveiled a new capsule collection of Green Carpet High Jewellery within its Red leading partnerships through a notable Carpet Collection, showcasing Gemfields emeralds. The collaboration with Cho

  77. Slide 77: Sustainability

    Sustainability Gemfields Plc 76

  78. Slide 78: Corporate social responsibility

    Corporate social responsibility Sustainability We don’t use any chemicals in our mining process and over the last five years we’ve planted over 300,000 trees on the land around our sites. We’re transforming old mines into lakes, and we’re seeding them with fish, creating a steady supply of fresh wat

  79. Slide 79: Sustainability - five key pillars

    Sustainability - five key pillars Setting new benchmarks for environmental, social and safety practices in the coloured gemstone sector Environmental Product • All operations aim to meet international good practice, taking steps • Gemfields policy is to ensure that whether rough or cut and to minimi

  80. Slide 80: Appendix

    Appendix Gemfields Plc 79

  81. Slide 81: Revealing the value of Mozambican Rubies

    Revealing the value of Mozambican Rubies Auction Six ruby auctions up to June 2016 generated total revenues of US$ 195.3 million. A part of revenue from the ‘Rhino Ruby’ has been given for the cause of anti-rhino-poaching aircraft operated by Game Reserves United. A part of revenue from the latest s

  82. Slide 82: Company overview

    Company overview Directors and Management Analyst Forecasts Target Price BMO Capital Markets – 1 Nov 2016 80p FinnCap – 6 Oct 2016 100p Investec Securities – 31 Aug 2016 80p JP Morgan Cazenove – 30 September 2016 53p Graham Mascall Ian Harebottle Janet Boyce Macquarie – 30 September 2016 90p Chairma

  83. Slide 83: Gemstone Price Index

    Gemstone Price Index Upper Fine Quality Gemstones Price Index: 1 - 1.5 Carat Lower Quality Commercial Gemstones Price Index: 1 – 1.5 Carat 2.00 3.5 1.80 3 1.60 1.40 2.5 1.20 2 1.00 0.80 1.5 0.60 1 0.40 0.5 0.20 0.00 0 2010 2011 2012 2013 2014 2015 2016 2010 2011 2012 2013 2014 2015 2015 Source: Gemg

  84. Slide 84: Rough emerald and beryl sales (Commercial quality)

    Rough emerald and beryl sales (Commercial quality) AUCTION RESULTS MAR ’10 MAR ’11 NOV ’11 JUN ’12 APR ’13 NOV ‘13 AUG’14 FEB ’15 NOV ’15 MAY ’16 (COMMERCIAL AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION QUALITY) Dates 11-15 Mar ‘10 10-14 Mar ‘11 21-25 Nov ‘11 9-13

  85. Slide 85: Rough emerald and beryl sales (Higher quality)

    Rough emerald and beryl sales (Higher quality) JUL ‘09 NOV ‘09 JUL ‘10 DEC ‘10 JUL ‘11 MAR ‘12 NOV ‘12 JUL ‘13 FEB ‘14 NOV ‘14 SEPT ‘15 APR ’16 AUCTION RESULTS AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION 20-24 Jul 23-27 Nov 19-23 Jul 6-10 Dec 11-15

  86. Slide 86: Rough ruby and corundum auctions

    Rough ruby and corundum auctions (Mixed quality) AUCTION RESULTS JUNE ’14 DEC ‘14 APRIL ’15 JUNE ‘15 DEC ‘15 JUNE ‘16 (RUBY & CORUNDUM) AUCTION AUCTION AUCTION AUCTION AUCTION AUCTION Dates 12-17 June ‘14 3-8 Dec ‘14 17-22 April ‘15 16-21 June ‘15 14-18 Dec ‘15 13-19 June ‘16 Location Singapore Sing

  87. Slide 87: Mining and production costs

    Mining and production costs Increased mining and production costs driven by ramp up in mining activity at Kagem and Montepuez Mining and production costs $20m 18,323 $18m 16,141 $16m $14m 2016: US$61.0m $12m 2015: US$46.5m $10m $8m 7,340 6,185 $6m 4,928 4,264 $4m 2,502 $2m 1,287 $0m Mineral royaltie

  88. Slide 88: Selling, general and administrative expenses

    Selling, general and administrative expenses % Year on In thousands of US$ 2016 2015 year change Labour and related costs 18,527 20,563 (10) Selling, marketing and advertising 14,568 16,224 (10) Professional and other services 6,173 5,720 (8) Travel and accommodation 5,008 3,537 42 Rent and rates 3,

  89. Slide 89: Contact us

    Contact us Gemfields Plc 1 New Burlington Place Mayfair London W1S 2HR United Kingdom Tel: +44 (0)20 7518 3400 Fax: +44 (0) 20 7197 8193 Gemfields Plc

Gemfields — Technical Presentation (December 2016) on 6ix