Resource Minerals International Ltd · ASX:RMI

Resource Minerals International — Resource Mining — 4th Asia Nickel Conference 2014

29 slides from Resource Minerals International's conference presentation, Nov 21, 2014

  1. Slide 1: 4th Asia Nickel Conference Presentation (ASX cover letter)

    ABN: 97 008 045 083 702 Murray Street, West Perth For personal use only Western Australia 6005 Phone: 61 8 9213 9400 Fax: 61 8 9213 9444 Website: www.resmin.com.au 21 November 2014 The Company Announcements Office Australian Securities Exchange Limited 4th Floor, 20 Bridge Street SYDNEY NSW 2000 4th

  2. Slide 2: PNG Nickel: Wowo Gap Project

    For personal use only 4th Asia Nickel Conference 19‐20 November Jakarta Indonesia PNG Nickel : Wowo Gap Project Market Opportunity Resource Capability VALUE 1

  3. Slide 3: Disclaimer

    For personal use only DISCLAIMER This presentation has been prepared by Resource Mining Corporation Limited (“RMC” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation wi

  4. Slide 4: Competent Persons Statement

    For personal use only COMPETENT PERSONS STATEMENT The information in this presentation is extracted from various reports to the Australian Securities Exchange and are available on the ASX website www.asx.com.au . The Company confirms that it is not aware of any new information or data that materiall

  5. Slide 5: The Company

    For personal use only The Company • Company Structure • Board and Senior Management • ASX Code RMI • Capable management with extensive in‐ • Shares currently on issue 2,700M country experience and sound reputation • Shares – fully diluted 2,900M • Warwick Davies Managing Director • Market Cap A$5.4M

  6. Slide 6: Market: Forecast Nickel Consumption Growth

    MARKET For personal use only Forecast Nickel Consumption Growth • World nickel consumption has risen at CAGR of around 4% since 2006; • China consumption growing above trend at 18% CAGR since 2006; • All sectors are growing, lead by robust Chinese stainless steel demand growth 5

  7. Slide 7: Market: 2013 World Nickel Consumption by Region

    MARKET For personal use only 2013 World Nickel Consumption by Region • Total World nickel consumption around 1.8 Mt in 2013 • China accounted for 49% of global nickel consumption in 2013 • BUT • China has limited domestic nickel resources and mine production; • Nickel Pig Iron technology developed o

  8. Slide 8: Market: 2013 World Nickel Consumption by Type

    MARKET For personal use only 2013 World Nickel Consumption by Type • Chinese Nickel Pig Iron producers supplied 26% of the world’s nickel • China now produces NPI containing around 0.5 Mtpa of nickel; • BUT • This relies upon large tonnages of imported nickel laterite ore as feedstock to the NPI ind

  9. Slide 9: Market: 2013 Chinese Nickel Ore Imports

    MARKET For personal use only 2013 Chinese Nickel Ore Imports • Principal sources are Indonesia and Philippines • High Grade (1.8% Ni) ores from Indonesia are the predominant feedstock for the Chinese NPI Industry • It is estimated that 80% of Chinese NPI production (20% of global nickel consumption)

  10. Slide 10: The Indonesian Ban is a Game Changer!

    OPPORTUNITY For personal use only The Indonesian Ban is a Game Changer! • The Indonesian Export Ban: • Prohibits the export of unprocessed ores; • Applies to all ores including nickel, bauxite and iron ores; • Policy objective is to incentivise investment in local mineral processing; • Became effect

  11. Slide 11: Options to address the shortfall

    OPPORTUNITY For personal use only Options to address the shortfall 1. Do nothing; 2. Increase supply from existing sources; 3. Invest in Indonesian ore processing facilities; 4. Develop new sources of ore supply. 10

  12. Slide 12: Do Nothing

    OPPORTUNITY For personal use only Do Nothing • Not a valid option  11

  13. Slide 13: Increase supply from existing sources

    OPPORTUNITY For personal use only Increase supply from existing sources • Philippines  • Does not have the quality or quantity equivalent to Indonesia; • Will require time to expand significantly to sustain exports; • Recent growth in exports to China post ban have been low grade ore; • Mixed messa

  14. Slide 14: Invest in Indonesian ore processing facilities

    OPPORTUNITY For personal use only Invest in Indonesian ore processing facilities • Recent nickel industry performance is very poor with substantial startup delays, cost overruns and capacity shortfalls  13

  15. Slide 15: Invest in Indonesian ore processing facilities

    OPPORTUNITY For personal use only Invest in Indonesian ore processing facilities • Economics of NPI in Indonesia are not as compelling as in China; ? • Capital Intensity will be higher than in China. • Input costs (especially energy) will be higher than in China. • Taxation and financing costs will

  16. Slide 16: Develop new sources of ore supply

    OPPORTUNITY For personal use only Develop new sources of ore supply • Limited opportunities in the Pacific Basin outside Indonesia and Philippines (refer USGS Report 2011 Ni‐Co Laterite Deposits of the World) Develop new sources of ore supply What about PNG? 15

  17. Slide 17: Papua New Guinea

    OPPORTUNITY For personal use only Papua New Guinea  • Country with a strong mining history;  • Established Mining Law; • Significant foreign investment. • Geological settings similar to Indonesia;  • Large laterite nickel inventory with untested exploration targets; • Existing Nickel industry; 

  18. Slide 18: Papua New Guinea

    OPPORTUNITY For personal use only Papua New Guinea • Current Nickel Laterite Ore situation with China • Existing stocks of high grade Indonesian ore decreasing; • Accelerated imports lower grade Philippine ore; • BLENDING to sustain NPI production; • Shanghai Metals Market (3rd Nov), predicted stock

  19. Slide 19: PNG Nickel Deposits

    For personal use only OPPORTUNITY PNG Nickel Deposits NORTH ASIAN • 2011 US Geological Survey MARKETS published data identifies Wowo Gap as the largest known nickel laterite deposit in PNG 18

  20. Slide 20: Wowo Gap Current Status

    RESOURCE For personal use only Wowo Gap Current Status • 100% owned and controlled by RMC through Niugini Nickel Limited • Significant Mineral Resource already defined Mineral Resource Classification Mt Nickel (%) Cobalt (%) (JORC 2004) Indicated 72 1.03 0.07 Inferred 53 1.09 0.06 Total 125 1.06 0.0

  21. Slide 21: Wowo Gap Current Status

    RESOURCE For personal use only Wowo Gap Current Status • Deposit contains both saprolite and limonite ores suitable for feedstock to different process facilities WOWO GAP SAPROLITE ORE LIMONITE ORE FERRO NICKEL NPI - RKEF HPAL - CARON NPI BLAST FURNACE 20

  22. Slide 22: Wowo Gap Current Status

    RESOURCE For personal use only Wowo Gap Current Status • Tenement licence renewed until 28/02/2016: tenure is secure • Mineralisation open to the north and south of current resource model on EL 1165 • Grant of EL 1980 (neighbouring exploration lease) in 2012 – mineralisation identified in EL 1980 wi

  23. Slide 23: Wowo Gap Exploration Target

    RESOURCE For personal use only Wowo Gap Exploration Target • 40 to 60 Mt at 1.6% to 1.8% Ni plus additional metal credits: • 0.07 to 0.15% Co; • 0.8 to 1.2% Mn; • 1 to 3% Cr2O3; • 25 to 35% Fe2O3 • 17 to 27% MgO • ONLY 35 km FROM OCEAN • Refer ASX announcement 23 June 2014 – Exploration Target: Wowo

  24. Slide 24: Wowo Gap Objectives

    CAPABILITY For personal use only Wowo Gap Objectives 1. Confirm high grade nickel DSO resource; 2. Complete Feasibility Study and permitting; 3. Develop mine, road and port infrastructure in stages; 4. Get product to market as soon as possible to capitalise on changed market conditions 23

  25. Slide 25: Planned Wowo Gap work program

    CAPABILITY For personal use only Planned Wowo Gap work program 1. Assess higher grade DSO ore 1. Ground Penetrating Radar survey to identify limonite and saprolite boundaries: Stage 1 completed; 2. Infill drilling to better define existing high grade limonite and saprolite zones: New auger rig purch

  26. Slide 26: Planned Wowo Gap work program cont.

    CAPABILITY For personal use only Planned Wowo Gap work program cont: GPR defined depth to base of clay Provides an example of the sampling techniques zone over DSO target areas. currently employed. 25

  27. Slide 27: RMC capability well established

    CAPABILITY For personal use only RMC capability well established • Managing Director and Exploration Manager; • Over 15 years combined experience operating in PNG; • Tenement has been held for over 12 years; • Support network developed with local villages; • Currently ± 300 local people employed as

  28. Slide 28: Wowo Gap work program - significant progress already achieved

    VALUE For personal use only Wowo Gap work program ‐ Significant progress already achieved • Construction of additional site accommodation and support facilities;  • Recruitment and mobilisation of additional PNG based supervisory, technical, administrative and support staff (including 7 x geologist

  29. Slide 29: Thank You

    Thank You For personal use only Resource Mining Corporation 702 Murray Street, West Perth, WA, 6008 www.resmin.com.au ASX: RMI 28

Resource Mining — 4th Asia Nickel Conference 2014 on 6ix