Sherritt International Corporation · TSX:S

Sherritt International — Investor Day (May 2018)

99 slides from Sherritt International's investor day presentation, May 30, 2018

  1. Slide 1: 2018 Investor Day

    SHERRITT 2018 INVESTOR DAY Welcome to Fort Saskatchewan May 30, 2018 1

  2. Slide 2: Today's presenters

    Today’s presenters David Pathe Andrew Snowden Steve Wood President and CEO Chief Financial Officer Chief Operating Officer Elvin Saruk John Marsh Lyle Trytten Senior Vice President Director, Technologies Projects GM of Sustainability Oil & Gas / Power 2

  3. Slide 3: Today's agenda

    Today’s agenda • Strategy & Outlook David Pathe • Financial Discussion Andrew Snowden • Review of Operations Steve Wood • Oil and Gas Outlook Elvin Saruk • Technologies Development John Marsh/David Pathe • History of Fort Site & Site Tour Lyle Trytten • Closing Remarks David Pathe 3

  4. Slide 4: Forward-looking statements

    Forward-looking statements The materials and presentations comprising the 2018 Investor Day for Sherritt International Corporation (“Sherritt” or the “Corporation”) presented on May 30, 2018 contain certain forward-looking statements. Forward-looking statements can generally be identified by the use

  5. Slide 5: Strategy & Outlook

    STRATEGY & OUTLOOK David Pathe President and CEO May 30, 2018 5

  6. Slide 6: Since our last investor day…

    Since our last investor day… $1.5B 1M Amount of debt eliminated Number of electric vehicles from balance sheet to be sold in China in 2018 Outlook for Sherritt is strongest in years 6

  7. Slide 7: Near-term outlook for cobalt is strong

    Near-term outlook for cobalt is strong Cobalt demand coming from the battery sector 70% 60% 50% 40% 30% 20% 10% 0% 2017 2018 2019 2020 2021 2022 2023 2024 2025 Batteries EV batteries Electric vehicles will consume 40% of the world’s cobalt supply by 2025 Source: CRU 7

  8. Slide 8: Nickel supply deficit is accelerating

    Nickel supply deficit is accelerating Global nickel supply/demand market balance (kt) 200 300 150 225 Nickel inventories (days) 150 • Supply deficit expected Market balance (kt) 100 75 to grow through 2025 50 0 0 • Demand is tied to EV (75) battery requirements (50) (150) • Current LME inventory is

  9. Slide 9: 2018 priorities

    2018 priorities 1 Preserve liquidity and enhance balance sheet strength Uphold global leadership in finished nickel laterite 2 production 3 Optimize opportunities in Cuban energy business The pillars of Sherritt’s strategy 9

  10. Slide 10: Strategic priorities scorecard

    Strategic priorities scorecard Strategic Priority 2018 Results YTD Strengthen balance sheet & preserve liquidity • Cash position increased to $237.3M – Q1 • $121.2M debenture purchased for $110.3M – Q1 • $10 million debenture purchase – Q2 Optimize Cuban energy business opportunities • PSC at PE/Yum

  11. Slide 11: Pillars are underpinned by commitment to innovation

    Pillars are underpinned by commitment to innovation  Pioneered commercialization of 1,700 Patents since 1948   high pressure hydrometallurgy 35+ operations use Sherritt technology around the world R&D, external services and operations support Fort Site – a centre of innovation for 60+ years 11

  12. Slide 12: Today's discussions

    Today’s discussions 1 Sherritt’s transformation and balance sheet initiatives 2 Near-term outlook for production and costs Opportunities for growth and commercialization of 3 innovation 4 Site tour of our production facilities Goal is to be informative and interactive 12

  13. Slide 13: Questions?

    Questions? David Pathe President and CEO 13

  14. Slide 14: Financial Review

    FINANCIAL REVIEW Andrew Snowden Senior Vice President and CFO May 30, 2018 14

  15. Slide 15: Today's discussion

    Today’s discussion 1 Recent balance sheet initiatives & strategic priorities 2 Cash flow from operations – How Sherritt generates cash 3 Sherritt’s sensitivity to commodity prices 15

  16. Slide 16: Strategic focus - balance sheet initiatives

    Strategic focus - balance sheet initiatives 2014 2016 2017 2018 - Sold non-core coal - Extended debenture - Restructured Ambatovy - Repurchased $120M of assets for $946M and maturities by 3 years JV & eliminated $1.4B debentures for $110M repaid $425M in of debt - Repurchased $30M of - Additional $1

  17. Slide 17: Impact of balance sheet initiatives

    Impact of balance sheet initiatives $1,938M $653M 74%Decrease in net debt $507M since 2016(1) 12/31/2016 12/31/2017 3/31/2018 Reducing debt remains a key strategic priority (1) Non-GAAP measure. Net debt is defined as debt due within one year plus the face value of long-term debt, less cash, cash eq

  18. Slide 18: Debt metrics are improving

    Debt metrics are improving Net debt / LTM EBITDA(1) (year-end 2016) Net debt / LTM EBITDA(1) Capstone Mining 1.7x Capstone Mining 1.2x Copper Mountain 5.4x Copper Mountain 3.1x Ero Copper 0.0x Ero Copper 3.4x Hudbay Minerals 2.4x Hudbay Minerals 1.0x New Gold 3.4x New Gold 3.1x Taseko Mines 9.1x Tas

  19. Slide 19: 3+ year runway before major liabilities are due

    3+ year runway before major liabilities are due(1) $134M $206M $223M $170M 2018 2019 2020 2021 2022 2023 2024 2025 Public debentures Ambatovy partner loan • Sherritt has the option to repay its Ambatovy partner loan in: − Shares; − Cash and shares; or − 10 equal semi-annual payments commencing in De

  20. Slide 20: Ambatovy distributable cash flow

    Ambatovy distributable cash flow Revenue generated by Ambatovy - Payment of operating expenses and capital - Semiannual Senior Loan principal and its interest payments(1) - Deposit to Senior Debt Reserve Account - No cash in, Deferred Senior Loan principal prepayment and part of sponsor post-financi

  21. Slide 21: Strategic priorities

    Se AP tl 6. Se Le on . 4 . fu <a > ; > * _— ad ~ am) y " : ; } Strategic priorities

  22. Slide 22: Disciplined capital allocation

    Disciplined capital allocation Capital spending ($M)(1) 160 140 120 100 80 60 40 20 0 2012 2013 2014 2015 2016 2017 2018 Moa and Fort Site Ambatovy Oil&Gas Power • Moa JV and Fort Site: normalized sustaining capex of ~ $40M • Oil & Gas: timing of capital spending will be linked to the collection of

  23. Slide 23: Reducing operating and head-office costs

    Reducing operating and head-office costs Operations Moa MPR (1) costs (US$/lb, excl. by-product credits) • Focus on reduction of controllable costs − 3rd acid plant reduced operating costs 7.5 − New fleet to increase truck availability 7.0 • Lower NDCC aided by rising cobalt prices 6.5 Corporate 6.0

  24. Slide 24: Reducing overdue receivables

    Reducing overdue receivables Q1 progress US$M Q4 overdue Expected/due Received Q1 overdue Oil & Gas receivables $41.4 $21.5 ($27.4) $35.5 Power receivables $91.2 $13.3 ($13.3) $91.2 Total Cuban energy $132.6 $34.8 ($40.7) $126.7 receivables • Overdue receivables have always fluctuated over the years

  25. Slide 25: Cash flow from operations

    Cash flow from operations How Sherritt generates cash 25

  26. Slide 26: Q1 impact of liquidity initiatives & working capital changes

    Q1 impact of liquidity initiatives & working capital changes $ millions 132.3 237.3 33.1 (110.3) (9.4) (4.1) 203.0 (1.3) 16.0 (11.0) (11.0) Dec. 31, 2017 Adj. Interest paid Receipt of WC change Unit offering Repurchase Unit and Capex Other March 31, continuing on debentures advances of debentures de

  27. Slide 27: How cash is generated from Cuba

    How cash is generated from Cuba Moa JV Oil & Gas Power 50% interest 100% interest 33.3% interest Finished products sold by ICCI to Cost-recovery oil and profit oil sold international customers, no Electricity sold locally locally receivable issue Conditional Repayment Repayment Payments Repayment sa

  28. Slide 28: Overview of Sherritt's financial assets in Cuba

    Overview of Sherritt’s financial assets(1) in Cuba Moa JV Power Energas conditional sales Working capital facility Expansion loan agreement (CSA) Outstanding • $9M • $242M • $210M amount (Q1 2018) • Prime + 3.50% or bankers’ • 6.5% • 8% Interest rate acceptance + 4.50% • Interest suspended until Q2

  29. Slide 29: Sensitivity to commodity prices

    Sensitivity to commodity prices 29

  30. Slide 30: Adj. EBITDA shows the sensitivity to nickel and cobalt prices

    Adj. EBITDA(1) shows the sensitivity to nickel and cobalt prices Nickel Price (US$/lb) $10 $45 Cobalt price (US$/lb) $9 Moa JV - Adjusted EBITDA ($M) $40 $8 $35 $7 Cobalt price (US$/lb) Nickel price (US$/lb) $30 $133M $6 $25 $5 $20 $4 $78M $81M $15 $3 $51M $42M $10 $2 $27M $20M $1 $5 $0 $0 2012 2013

  31. Slide 31: Moa – Cash flow sensitivity to nickel and cobalt prices

    Moa – Cash flow sensitivity to nickel and cobalt prices Impact of US$1/lb nickel price increase Impact of US$5/lb cobalt price increase $40M $20M Low-end of guidance Low-end of guidance Upside leverage to improving nickel and cobalt prices Note: Sherritt’s share of cash 31

  32. Slide 32: Review of 2018 NDCC forecasts

    Review of 2018 NDCC forecasts Moa Ambatovy $2.75 $3.25 -15% $2.75 -27% $2.00 Old New Old New • Due to higher cobalt prices • Driven by higher cobalt prices offset by changes to cobalt ore grade NDCC will benefit from higher than anticipated cobalt prices 32

  33. Slide 33: Summary

    Summary 1 Sherritt’s debt reduced and now aligned with peer group Cost reduction and disciplined capital allocation remain 2 key strategic priorities Sherritt has strong upside leverage to rising nickel and 3 cobalt prices Balance sheet and liquidity initiatives are transforming Sherritt 33

  34. Slide 34: Questions?

    Questions? Andrew Snowden Senior Vice President and CFO 34

  35. Slide 35: Review of Operations

    REVIEW OF OPERATIONS Steve Wood EVP & Chief Operating Officer May 30, 2018 35

  36. Slide 36: Today's discussion

    Today’s discussion 1 Commitment to safety and sustainability 2 Review of operations and recent progress 3 Optimization initiatives and outlook 36

  37. Slide 37: Focus on safety

    Focus on safety Moa JV - Work-related incidents Q1 2018 results • Zero lost time incidents 1.00 Frequency (per 200,000 hours worked) • 7 million hours without a lost time incident 0.90 0.80 • Safest record since Q3 2005 0.70 0.60 0.50 Global commitment 0.40 0.30 • Implementing Towards Sustainable Mi

  38. Slide 38: Commitment to sustainability

    Commitment to sustainability Recent efforts Ongoing sustainability initiatives and programs • Supported Hurricane Irma and Cyclone Ava relief efforts • Signed 3-year partnership with UNICEF Canada for road safety for youth in Cuba • Launched Five-year Sustainability Goals to drive continuous improve

  39. Slide 39: Review of operations & recent progress

    Review of operations & recent progress 39

  40. Slide 40: Moa joint venture overview

    Moa joint venture overview 1Alberta, Moa Nickel S.A. Finished nickel and cobalt products Canada To Asia via Vancouver To Europe via Montreal • Mines and processes nickel and cobalt from lateritic ore bodies Fort • High cobalt-to-nickel production ratio Saskatchewan 2 Mixed sulphides are Cobalt Refin

  41. Slide 41: Moa is a long-life asset

    Moa is a long-life asset Nickel and cobalt production (tonnes, 100% basis) 33,599 33,972 34,572 34,263 33,542 32,909 33,705 32,927 • A vertically 31,524 31,500 integrated mining, processing and refining enterprise • 60+ years HPAL experience • 15+ years of proven reserve life • High cobalt-to- 3,721

  42. Slide 42: Moa is a low-cost asset

    Moa is a low-cost asset Net direct cash cost (US$/lb) 10.0 9.0 8.0 • Substantial cobalt and fertilizer by- 7.0 products produced 6.0 ensure the Moa JV remains competitive 5.0 throughout the cycle 4.0 • Moa’s NDCC has 3.0 been in the lowest 2.0 cost quartile for four 1.0 consecutive quarters 0.0 Q1 Q

  43. Slide 43: Moa production update

    Moa production update • Q1 mixed sulphides production and availability impacted by: − Heaviest rainfall in 20+ years − Spill-over effect from heavy rains in Q4 − Reduced ore stockpiles − Higher levels of impurities due to excess water − Rail service delays • Q2 developments: − Production at Moa back

  44. Slide 44: Ambatovy joint venture overview

    Ambatovy joint venture overview • Partnership with Sumitomo and Kores • Integrated mining, processing and refining plant in Madagascar • Class 1 nickel and high purity cobalt production • Operator at least through 2024 Ownership interest reduced to 12% with JV restructuring 44

  45. Slide 45: Ambatovy production update

    Ambatovy production update • Q1 production impacted by: − Cyclone Ava − Shutdown and repairs − Acid Plant 1 operating at 50% capacity • Q2 developments: − Replacement of economizer in Acid Plant 1 − Acid Plant 1 shutdown expected for ~ 3 weeks − Acid Plant 2 is operating normally • Ongoing focus on

  46. Slide 46: Optimization initiatives and outlook

    Optimization initiatives and outlook 46

  47. Slide 47: Initiatives to optimize performance and efficiency

    Initiatives to optimize performance and efficiency • Slurry preparation plant “dump pocket” − Goal is to improve screening of ore Mining fleet availability(1) (%) − Benefits include shorter haul distances and increased throughput 90% − 54% constructed with 2005 expansion project 80% 70% − Commission

  48. Slide 48: Review of 2018 production forecasts

    Review of 2018 production forecasts Moa (100% basis, tonnes)(1) Ambatovy (100% basis, tonnes)(2) 10,000 15,000 8,000 10,000 6,000 4,000 5,000 2,000 0 0 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Nickel Cobalt Nickel Cobalt • Production expected at lower range • Cobalt production guidance of guidance updated to grades

  49. Slide 49: Summary

    Summary 1 Q1 weather and logistical challenges now behind us 2 Initiatives underway to optimize efficiency and lower costs 3 On track for 2018 production and NDCC guidance targets 49

  50. Slide 50: Questions?

    Questions? Steve Wood Chief Operating Officer 50

  51. Slide 51: Oil and Gas Update

    OIL AND GAS UPDATE Elvin Saruk Senior Vice President, OGP May 30, 2018 51

  52. Slide 52: Today's discussion

    Today’s discussion 1 Sherritt’s oil and gas experience 2 Cuba’s north shore geology 3 Block 10 drilling and outlook 52

  53. Slide 53: Sherritt's oil and gas experience

    Sherritt’s oil and gas experience • Integrated operations in Cuba since 1992 − Specialize in long-reach directional drilling from land-based locations − Own 2 drilling rigs − Own most of maintenance and service equipment • Operate through Production Sharing Contracts − Cost recovery − Share of profi

  54. Slide 54: Target production and exploration areas

    Target production and exploration areas - Existing PSC’s - Expired PSC’s Based on long-reach directional drilling from land-based locations 54

  55. Slide 55: Sherritt's gross production in Cuba

    Sherritt’s gross production in Cuba 60,000 240,000,000 50,000 200,000,000 Cumulative Production (BBLS) Production Rate (BOPD) 40,000 160,000,000 30,000 120,000,000 20,000 80,000,000 10,000 40,000,000 0 0 Jan-09 Jan-12 Jan-92 Jan-93 Jan-94 Jan-95 Jan-96 Jan-97 Jan-98 Jan-99 Jan-00 Jan-01 Jan-02 Jan-0

  56. Slide 56: Cuba's north shore geology

    Cuba’s north shore geology 56

  57. Slide 57: Cuba's north coast

    Cuba’s north coast • Complex area • Fold and thrust belt • Multiple duplexes • Each duplex has multiple thrusts • Best reservoir at top of thrusts 25 years of experience has provided a thorough understanding of geology 57

  58. Slide 58: North coast structural model

    North coast structural model Complex fold and thrust geology 58

  59. Slide 59: Block 10 drilling and outlook

    Block 10 drilling and outlook 59

  60. Slide 60: Current areas of focus

    Current areas of focus • Puerto Escondido/Yumuri PSC − Three-year extension to March 2021 − Cost recovery preserved − Profit oil reduced to 6% − Main purpose of extension is to retain equipment and personnel • Block 8A − Awaiting CUPET to approve seismic program • Block 6A − PSC signed November 2017

  61. Slide 61: Our experience with Block 10

    Our experience with Block 10 • CUPEY-1X drilled in 1994 tested 3750 barrels/day • Reprocessed seismic resulting in a better definition of the Lower Veloz and encouraged of the Upper Veloz presence • Additional potential identified • Drilled initial wells from land location with current technology Ne

  62. Slide 62: Block 10 target prospects

    Block 10 target prospects Primary target is the Litoral prospect 62

  63. Slide 63: Overview of Block 10

    Overview of Block 10 Target area requires approximately 6,000 metres of drilling 63

  64. Slide 64: Block 10 well status

    Block 10 well status SW CUPEY-1X NE Upper Vega Alta Upper Veloz 9 5/8” shoe 3318mMD Lost Circulation Zone Tested Oil First Well Lower LT-100 ST6 Well Plan First Well Vega Alta 7” Liner Second Well Anticipated Loss Circulation 7 5/8” Expandable Liner 4 1/2” Liner TD 7” Liner Lower 4 1/2” Liner TD Vel

  65. Slide 65: Block 10 drilling profile

    Block 10 drilling profileT6 Drilling Profile 1. Using the existing wellbore to 3318m MD, which is the depth of the 9-5/8” casing. 2. Drill and set expandable liner at least 100 meters below loss circulation zone. (Estimated to be set at approximately 4300m MD) 18-5/8” Casing @ 354m MD 3. The 7” line

  66. Slide 66: Block 10 development potential

    Block 10 development potential • Exploration PSC: − Cost Recovery − Profit Oil • Two target zones: − Upper and Lower Veloz • Average cost per well: − US$13 to $15 million • Opex: - ~US$10/barrel • Potential production: − 25,000 bopd GWI Development plan to be finalized pending drilling results in Q3

  67. Slide 67: Summary

    Summary 1 Sherritt has extensive oil and gas experience in Cuba 2 Block 10 development potential is significant 3 Preliminary Block 10 drilling results expected in Q3 67

  68. Slide 68: Questions?

    QUESTIONS? Elvin Saruk Senior Vice President, OGP May 30, 2018 68

  69. Slide 69: Partial Upgrading of Bitumen

    PARTIAL UPGRADING OF BITUMEN David Pathe President & CEO John Marsh Director, Technologies Projects May 30, 2018 69

  70. Slide 70: Today's discussion

    Today’s discussion 1 Why Sherritt is qualified 2 Market opportunity for bitumen upgrading 3 Overview of Sherritt’s process and pilot testing results 4 Next steps and timeline 70

  71. Slide 71: Sherritt has a long track record of innovation

    Sherritt has a long track record of innovation • Pioneered commercialization of high pressure hydrometallurgy 1,700 Patents since 1948 • • 35+ operations use Sherritt technology around the world Technologies group provides R&D, external services and operations support Experience with coal liquefacti

  72. Slide 72: Logical extension into hydrocarbon processing

    Logical extension into hydrocarbon processing Hydrometallurgical Heavy oil operations reactor design Bitumen Upgrading Proximity to Alberta’s oil Direct coal liquefaction sands Opportunity to capitalize on our experience and proximity to bitumen producers 72

  73. Slide 73: Market opportunity for bitumen upgrading

    Market opportunity for bitumen upgrading 73

  74. Slide 74: Bitumen producers currently need diluent for transportation

    Bitumen producers currently need diluent for transportation Bitumen + Diluent = Bitumen blend API Gravity 8.0 67.5 > 19 Viscosity (cSt) > 450,000 0.62 < 350 Diluent Light, low viscosity hydrocarbon stream used to improve flow characteristics Represents ~30% of the bitumen blend Bitumen blend meeting

  75. Slide 75: Represents huge market potential

    Represents huge market potential Estimated industry benefit (US$ bn / year)(1) 2017 2030 Net cost of diluent for Diluent blending with bitumen $6bn $15bn Avoidance and heavy crudes Diluent Increased bitumen Transportation blend shipments Benefit $1bn $3bn occupy vacated pipeline space Value uplift a

  76. Slide 76: Overview of Sherritt's process and pilot testing results

    Overview of Sherritt’s process and pilot testing results 76

  77. Slide 77: Sherritt's technology

    Sherritt’s technology • Upgrading bitumen may be accomplished by rejecting carbon or adding hydrogen  Carbon rejection methods produce 20%-30% of low value coke or asphaltene product and have low liquid yields  Typical hydrogen addition techniques are reliant on highly active and expensive catalys

  78. Slide 78: Pilot test results - Pipeline critical properties

    Pilot test results - Pipeline critical properties API gravity (º) Viscosity (Centistokes) Minimum 1,000,000 pipeline specification 100,000 10,000 Maximum pipeline 450,000 specification 1,000 23 350 19 100 8 - 10 10 59 20 1 Bitumen Bitumen Upgraded Sherritt Product Bitumen Bitumen Upgraded Sherritt P

  79. Slide 79: Pilot test results - Product yield improvement

    Pilot test results - Product yield improvement What is inside an oil barrel? 100% Light 80% 60% + = 40% 20% Heavy 0% (1) Bitumen Upgraded Sherritt Product WCS WTI Feed Feed upgraded Blend (2) Naphtha Diesel HGO Residue Sherritt’s product delivers higher liquid yield, lower gasoline and higher diesel

  80. Slide 80: Competitive advantage vs. alternatives

    Competitive advantage vs. alternatives 33 Delayed Coking (Full Upgrading) 31 29 27 API gravity 25 23 Hi-Q (MEG Energy) 21 Sherritt 19 Pipeline API specification 17 Jet Shear 15 35 40 45 50 55 60 65 70 WCS supply cost (C$/bbl at 10% ATAX IRR) Process Provider Capex intensity (C$/bpd) Jet Shear(1) Fra

  81. Slide 81: Next steps and timeline

    Next steps and timeline 81

  82. Slide 82: Sample timeline

    Sample timeline 2018 2019 2020 2021 2022 Discussions with potential partners Site assessment, basic design Design, procurement and construction of the pilot plant Commissioning Testing / operations Decision on commercial plant 82

  83. Slide 83: Next steps

    Next steps • Develop better understanding of commercial environment and potential economics • Discussions initiated with: − Alberta Government agencies − Potential partners for demonstration plant − License and royalty structures to be determined Potential to monetize process is being fully exploite

  84. Slide 84: Summary

    Summary Sherritt has developed an innovative process that 1 addresses significant bitumen industry need Technology is based on Sherritt’s processing capabilities 2 and experience 3 Process has been proven in pilot testing Timelines of additional testing and commercialization 4 being developed 84

  85. Slide 85: Questions?

    Questions? David Pathe President & CEO John Marsh Director, Technologies Projects 85

  86. Slide 86: Introduction to Sherritt Metals

    Introduction to Sherritt Metals Lyle Trytten General Manager Sustainability May 30, 2018 86

  87. Slide 87: Today's discussion

    Today’s discussion • Sherritt and site background • Responsible production • JV and Metals Refinery operations • Utilities and Fertilizers operations • Tour of facilities 87

  88. Slide 88: Sherritt and site background

    Sherritt and site background • Sherritt Gordon Mines Ltd − Started as a copper miner, discovered nickel (Sherridon - 1927) (Lynn Lake - 1940s) − Developed hydrometallurgical technology (1950s) • Fort Saskatchewan Refinery − Started operation in 1954 − Lynn Lake mine closed mid-1970’s − First Moa sul

  89. Slide 89: Development over the years

    Development over the years • Developed a JV with Cuban nickel agency in 1994 to secure feed − 50% Sherritt, 50% General Niquel de Cuba − Moa Nickel – mining and processing in Cuba − Cobalt Refinery Company – refining nickel and cobalt in Canada − International Cobalt Company – marketing nickel and c

  90. Slide 90: Sherritt Fort Site Agenda

    Sherritt Fort Site AGENDA 90

  91. Slide 91: Responsible production – Safety first

    Responsible production – Safety first • The Fort Site employs ~750 workers − 360 Hourly Employees (Unifor) in Operations, Maintenance − No labour interruption in history of site (>60 yrs) − Culture of collaboration and being in touch with workforce • Many long-term employees (more than 20 years of s

  92. Slide 92: Responsible production - Environmental

    Responsible production - Environmental • Greenhouse gases – regulated under Alberta law − Able to capture process CO2 emissions from Ammonia Plant for use • Solid process “wastes” are byproducts sold to third parties • Zero liquid effluent to river − Treated in regional sewage treatment plant, inclu

  93. Slide 93: Responsible production – sustainable mining

    Responsible production – sustainable mining • Supply chain transparency is important to our customers • Core sustainability commitments: we will − Ensure our process feeds are free from human rights abuses − No child or forced labour − No feeds from identified conflict areas, artisanal and small-sca

  94. Slide 94: Joint venture operations

    JOINT VENTURE OPERATIONS Moa Laterite Ore Sulphuric Acid HPAL CCD Wash Tailings Sulphide Precipitation Mixed Sulphides 60% Ni+Co Fort Saskatchewan Ammoni Ammonia Leach Leach Residue a Recycl Ni / Co Separation e Metal Ammonia Recovery Byproducts Nickel Cobalt SP/ Hydrogen Reduction Hydrogen Reductio

  95. Slide 95: Joint venture products

    Joint venture products • Nickel Briquettes − Sintered, LME Grade, 99.8% − Unsintered, “Steel Grade”, 99.4% nickel • Nickel Powders − Coarse, standard and fine grades • Cobalt Briquettes − Sintered, 99.9% − Cobalt Powder − Coarse grade • Ammonium Sulphate: − ~180,000 t/y − Coarse and fine grades High

  96. Slide 96: Utilities and fertilizer operations

    Utilities and fertilizer operations • Ammonia Plant − Produce up to 350 t/d for internal use and sale − Standard Haber-Bosch process • Sulphuric Acid Plant − Produce up to 800 t/d for internal consumption and sale − Operating rate determined by external sales (managed by third party) • Granulation P

  97. Slide 97: Questions?

    Questions? Lyle Trytten General Manager Sustainability 97

  98. Slide 98: Closing Remarks

    CLOSING REMARKS David Pathe President and CEO May 30, 2018 98

  99. Slide 99: Sherritt International Corporation

    Sherritt International Corporation 181 Bay Street, 26th Floor, Brookfield Place Toronto, Ontario, Canada M4T 2Y7 Investor Relations Joe Racanelli Telephone: 416.935.2457 Toll-Free: 1.800.704.6698 Email: investor@sherritt.com Website: www.sherritt.com 99

Sherritt International — Investor Day (May 2018) on 6ix