Nexus Minerals Ltd. · ASX:NXM

Nexus Minerals — Diggers and Dealers 2026

24 slides from Nexus Minerals's conference presentation, Aug 3, 2026

  1. Slide 1: Company Presentation – Diggers and Dealers Kalgoorlie

    COMPANY PRESENTATION DIGGERS AND DEALERS KALGOORLIE 3-5 AUGUST 2026

  2. Slide 2: Disclaimer

    DISCLAIMER This document contains forward looking statements. Forward looking statements are not based on historical facts but are based on Nexus’s current expectations of future results or events. These forward looking statements are subject to risks, uncertainties and assumptions which could cause

  3. Slide 3: Cautionary Statement – Scoping Study

    CAUTIONARY STATEMENT – SCOPING STUDY The Scoping Study referred to in this presentation (slide 12) is based on the material assumptions outlined in the announcement released to ASX on 4 June 2024. The Scoping Study has been undertaken to determine the viability of open pit mining and third-party tol

  4. Slide 4: Nexus Minerals (ASX:NXM) Corporate Profile

    CORPORATE PROFILE NEXUS MINERALS (ASX:NXM) COMPANY OVERVIEW NEXUS MINERALS LIMITED ASX: NXM SHARES 603.8M SHARE PRICE A$0.041 MARKET CAP A$24.7M CASH (30/06/2026) A$5.3M ENTERPRISE VALUE A$19.5M TOP 20 49% CHAIRMAN – MR. PAUL BOYATZIS MANAGING DIRECTOR – MR. ANDY TUDOR +35 years in equity markets &

  5. Slide 5: West Australian Gold Focus

    COMPANY PROJECTS WEST AUSTRALIAN GOLD FOCUS WALLBROOK PROJECT Exploring for large scale gold deposits Displaying strong spatial continuity Presenting prime opportunity for development Growing gold mineral resource base PINNACLES PROJECT High-grade underground deposit Joint venture (JV) with Northern

  6. Slide 6: Wallbrook Gold Project

    LARGE SCALE GOLD DEPOSITS WALLBROOK GOLD PROJECT

  7. Slide 7: Wallbrook Gold Project: Large Scale Gold Deposits

    LARGE SCALE GOLD DEPOSITS WALLBROOK GOLD PROJECT 192KM2 140KM OF CONTIGIOUS NE OF KALGOORLIE TENEMENT PACKAGE BETWEEN NORTHERN STAR ~50KM STRIKE OF CAROSUE DAM AND PROSPECTIVE GEOLOGY PORPHYRY OPERATIONS GRANTED ML’S FAVOURABLE HOST MAIN PROSPECTIVE CORRIDORS INCLUDING GEOLOGY CRUSADER-TEMPLAR DEPOS

  8. Slide 8: Crusader-Templar Prospect

    WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR PROSPECT COMBINED MINERAL RESOURCE ESTIMATE Indicated Inferred TOTAL Au Tonnes Au grade Au ounces Tonnes Au grade Au ounces Tonnes Au grade ounces (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz) 2,460 1.8 140 3,210 1.6 164 5,670 1.7 304 Indicated material c

  9. Slide 9: Crusader-Templar Prospect - MRE

    WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR PROSPECT - MRE 9

  10. Slide 10: Crusader-Templar MOU Signed with Mining Contractor

    WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR MOU SIGNED WITH MINING CONTRACTOR Memorandum of Understanding (MOU) for mine development and mining signed with Macro Gold Mining Services Pty Ltd (MGMS) for a potential mining operation at the Crusader – Templar gold deposit MGMS are to provide a full operati

  11. Slide 11: Permitting Status for Crusader-Templar

    WALLBROOK GOLD PROJECT PERMITTING STATUS FOR CRUSADER-TEMPLAR ITEM PURPOSE STATUS COMMENT TENEMENTS To conduct Exploration & Mining. Tenements in Good Standing  Granted mining leases Pre - Operational Permitting SMALL MINING PROPOSAL Allows for associated site-infrastructure on adjoining tenement (

  12. Slide 12: Crusader-Templar Scoping Study

    WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR SCOPING STUDY Utilising third-party processing plants toll treatment agreement $3,000 gold price used for study pit shell optimisations Using a gold price of $3,500 the Production Target mining inventory is: 1.5Mt at 1.75g/t producing 80koz gold The Production

  13. Slide 13: Emerging Gold Camp

    WALLBROOK GOLD PROJECT EMERGING GOLD CAMP Regional “Gold Camp” prospectivity 5 Mineralised Corridors identified to date – MC1 to MC5 ~90% of 192km2 tenement package yet to be explored 18 regional targets subjected to first passaircore drilling Crusader Templar combined Mineral Resource Estimate (MRE

  14. Slide 14: Emerging Scale Potential

    WALLBROOK GOLD PROJECT EMERGING SCALE POTENTIAL PROSPECT SUMMARY Prospect Scale High light Intercepts Geology 5m @ 17.91g/t Au (within 8m @ 11.37g/t Au) from 118m 7m @ 8.03 g/t Au (within 15m @ 4.45 g/t Au) from 29m Hosted within hematite-altered porphyry dykes 5m @ 5.45g/t Au (within 36m @ 2.04g/t

  15. Slide 15: Branches Prospect

    WALLBROOK GOLD PROJECT BRANCHES PROSPECT Mineralised corridor now 1.5km x 300m (remains open) Gold associated with: Quartz-Goethite veining Sericite-Rutile-Tourmaline-Albite alteration Hematite altered quartz porphyries RC drill results have included: 5m @ 17.91g/t Au (within 8m @ 11.37g/t Au) from

  16. Slide 16: Payns Prospect: Regional RC/AC Success

    WALLBROOK GOLD PROJECT PAYNS PROSPECT: REGIONAL RC/AC SUCCESS Assay results received from Nexus RC drill program incl: 5m at 12.83g/t Au including 1m at 34.77g/t Au within 21m at 3.26g/t Au from 39m 6m at 3.15g/t Au including 1m at 10.46g/t within 22m at 1.14g/t Au from 28m 3m at 3.89g/t Au within 8

  17. Slide 17: Clement Prospect: Regional RC/AC Success

    WALLBROOK GOLD PROJECT CLEMENT PROSPECT: REGIONAL RC/AC SUCCESS Mineralised corridor now 650m x 250m Gold associated with: Felsic porphyry intrusions within a volcaniclastic host sequence Strong silicification and quartz veining Elevated sulphide content in fresh rock Assay results received from Nex

  18. Slide 18: Pinnacles: High-Grade Underground Deposit

    High-Grade underground deposit Northern Star (NST) 10% of the contributing JV is being acquired by Nexus to be completed by September 2026. Post this Nexus will have 100% ownership of the project JORC 2012 Combined MRE 609,000t @ 4.0g/t Au for 78,000oz (O/P+U/G) JORC 2012 U/G MRE 450,000t @ 4.6g/t A

  19. Slide 19: Pinnacles JV Underground Study

    PINNACLES JV PINNACLES JV (WITH NST) Underground Study 80m – 280m Conceptual Design Only Next Steps – Prepare Mining Proposal and Closure Plan + Operational Permits 19

  20. Slide 20: Over 7,500km2 of Prospective Tenure

    Over 7,500km2 of prospective tenure First mover advantage allows for regional scale exploration targeting with one of the largest pegging exercises in NSW history Exploration for a range of minerals Gold - Copper - Lithium - Caesium - Tantalum - Tin Lithium-caesium-tantalum (LCT) pegmatites are asso

  21. Slide 21: NSW Minerals Project: 7,500km2 Mega Peg

    NSW MINERALS PROJECT 7,500KM2 “MEGA PEG” A review of open file geology and whole-rock geochemistry confirmed that much of the exploration ground granted in southern NSW is underlain by reduced, fractionated, peraluminous S-type granites Southern Geoscience Consultants have completed the interpretati

  22. Slide 22: Summary

    PROJECTS SUMMARY WALLBROOK GOLD PROJECT PINNACLES U/G GOLD PROJECT NSW MINERALS PROJECT HIGHLY PROSPECTIVE & STRATEGIC HIGH GRADE GOLD ~7,500KM2 GRANTED TENURE LANDHOLDING OPPORTUNITY First mover advantage regional Crusader-Templar Prospect - 300k+ resource 78koz resource @ 4.0g/t scale exploration

  23. Slide 23: JORC Tables

    APPENDIX 1 JORC TABLES CRUSADER-TEMPLAR PROSPECT COMBINED JORC 2012 MINERAL RESOURCE ESTIMATE (0.4G/T AU CUT-OFF) Indicated Inferred TOTAL Tonnes Au grade Au ounces Tonnes Au grade Au ounces Tonnes Au grade Au ounces (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz) Pinnacles Project Combined JORC

  24. Slide 24: 2/41-47 Colin Street West Perth WA 6005 P (08) 9481 1749

    2/41-47 Colin Street West Perth WA 6005 P (08) 9481 1749

Nexus Minerals — Diggers and Dealers 2026 on 6ix