Nexus Minerals Ltd. · ASX:NXM
Nexus Minerals — Mines in the Vines 2025
15 slides from Nexus Minerals's conference presentation, Nov 19, 2025
Slide 1: Company Presentation – Mines in the Vines
COMPANY PRESENTATION MINES IN THE VINES 19TH & 20TH NOVEMBER 2025
Slide 2: Disclaimer
DISCLAIMER This document contains forward looking statements. Forward looking statements are not based on historical facts but are based on Nexus’s current expectations of future results or events. These forward looking statements are subject to risks, uncertainties and assumptions which could cause
Slide 3: Cautionary Statement – Scoping Study
CAUTIONARY STATEMENT – SCOPING STUDY The Scoping Study referred to in this presentation (slide 13) is based on the material assumptions outlined in the announcement released to ASX on 4 June 2024. The Scoping Study has been undertaken to determine the viability of open pit mining and third-party tol
Slide 4: Nexus Minerals (ASX:NXM) Corporate Profile
CORPORATE PROFILE NEXUS MINERALS (ASX:NXM) COMPANY OVERVIEW NEXUS MINERALS LIMITED ASX: NXM SHARES 603.8M SHARE PRICE A$0.081 MARKET CAP A$49M CASH (30/09/2025) A$9.6M ENTERPRISE VALUE A$39.4M TOP 20 48% CHAIRMAN – MR. PAUL BOYATZIS MANAGING DIRECTOR – MR. ANDY TUDOR +35 years in equity markets & co
Slide 5: Why Nexus Minerals?
WHY NEXUS MINERALS? TENURE FROM A MAJOR / JURISDICTION / COMMODITY – YES NST / WA / GOLD NEAR CURRENT GOLD PRODUCING ASSETS – YES 3 X NST OPEN PITS + 3 UG OPERATIONS (<5KM) PORPHYRY / MILLION DOLLAR / WALLBROOK MANAGEMENT + TEAM EXPERIENCE – YES ~100YRS MD & C-SUITE TEAM TOGETHER OVER 10YRS
Slide 6: West Australian Gold Focus
COMPANY PROJECTS WEST AUSTRALIAN GOLD FOCUS WALLBROOK PROJECT Exploring for large scale gold deposits Displaying strong spatial continuity Presenting prime opportunity for development Growing gold mineral resource base PINNACLES PROJECT High-grade underground deposit Joint venture (JV) with Northern
Slide 7: Wallbrook Gold Project
LARGE SCALE GOLD DEPOSITS WALLBROOK GOLD PROJECT 192KM2 140KM OF CONTIGIOUS NE OF KALGOORLIE TENEMENT PACKAGE BETWEEN NORTHERN STAR ~50KM STRIKE OF CAROSUE DAM AND PROSPECTIVE GEOLOGY PORPHYRY OPERATIONS GRANTED ML’S FAVOURABLE HOST MAIN PROSPECTIVE CORRIDORS INCLUDING GEOLOGY CRUSADER-TEMPLAR DEPOS
Slide 8: Crusader-Templar Prospect
WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR PROSPECT COMBINED MINERAL RESOURCE ESTIMATE Indicated Inferred TOTAL Au Tonnes Au grade Au ounces Tonnes Au grade Au ounces Tonnes Au grade ounces (kt) (g/t) (koz) (kt) (g/t) (koz) (kt) (g/t) (koz) 2,460 1.8 140 3,210 1.6 164 5,670 1.7 304 Indicated material c
Slide 9: Crusader-Templar Scoping Study – As at 4 June 2024
WALLBROOK GOLD PROJECT CRUSADER-TEMPLAR SCOPING STUDY – AS AT 4 JUNE 2024 MDCP Utilising third-party processing plants toll treatment agreement Outline $3,000 gold price used for study pit shell optimisations Using a gold price of $3,500 the Production Target mining inventory is: 1.5Mt at 1.75g/t pr
Slide 10: Permitting Status for Crusader-Templar
WALLBROOK GOLD PROJECT PERMITTING STATUS FOR CRUSADER-TEMPLAR ITEM PURPOSE STATUS COMMENT TENEMENTS To conduct Exploration & Mining. Tenements in Good Standing Granted mining leases Allows for Camp, Magazine, SMALL MINING PROPOSAL Allows for associated site-infrastructure on adjoining tenement (M3
Slide 11: Emerging Gold Camp
WALLBROOK GOLD PROJECT EMERGING GOLD CAMP Regional “Gold Camp” prospectivity 5 Mineralised Corridors identified to date – MC1 to MC5 ~90% of 192km2 tenement package yet to be explored 18 regional targets subject to first pass aircore drilling Multiple Discoveries – Branches / Payns / Clement / Godfr
Slide 12: Branches Prospect
WALLBROOK GOLD PROJECT BRANCHES PROSPECT Mineralised corridor now 1.5km x 300m (remains open) Gold associated with the Regional Gold Signature of: Quartz-Goethite veining Sericite-Rutile-Tourmaline-Albite alteration Hematite altered quartz porphyries RC drill results have included: 5m @ 17.91g/t Au
Slide 13: Pinnacles High-Grade Underground Deposit
High-Grade underground deposit NXM 90% : Northern Star (NST) 10% contributing JV JORC 2012 Combined MRE 609,000t @ 4.0g/t Au for 78,000oz (O/P+U/G) JORC 2012 U/G MRE 450,000t @ 4.6g/t Au for 66,000oz Au (U/G only) U/G Mine development options study underway The Joint Venture will sell the ore to Nor
Slide 14: Pinnacles JV Underground Study
PINNACLES JV PINNACLES JV (WITH NST) Underground Study 80m – 280m Conceptual Design Only Next Steps – Prepare Mining Proposal and Closure Plan + Operational Permits 14
Slide 15: Summary – Thank You
PROJECTS SUMMARY – THANK YOU WALLBROOK GOLD PROJECT PINNACLES U/G GOLD PROJECT HIGHLY PROSPECTIVE & STRATEGIC HIGH GRADE GOLD LANDHOLDING OPPORTUNITY Crusader-Templar Prospect - 300k+ resource 78koz resource @ 4.0g/t Multiple resource drill out ready prospects: Joint Venture – Nexus 90%, Branches /