Blende Silver Corp. · TSXV:BAG

Blende Silver — Investor Presentation (January 2026)

26 slides from Blende Silver's investor presentation, January 2026

  1. Slide 1: Blende Silver Corp. Spring 2026

    Spring 2026 ae Wi & Blende Silver Corp. BAG:TSX.V

  2. Slide 2: Disclaimer

    Disclaimer This presentation does not constitute an offer to sell or solicitation of an offer to buy securities of Blende Silver Corp. FORWARD LOOKING STATEMENTS This presentation contains "forward-looking statements". These forward-looking statements are made as of the date of this presentation and

  3. Slide 3: Blende Silver Corp – The Company

    Blende Silver Corp – The Company 100% ownership of the Blende Deposit; a Silver-Zinc-Lead resource -> preliminary economic assessment stage asset in the Yukon, Canada • The Blende Deposit is the largest undeveloped (open pit-constrained) carbonate-hosted Zinc-Lead-Silver deposit in Yukon 2021 NI43-1

  4. Slide 4: Capitalization Structure

    Capitalization Structure Major Shareholders/Ownership Share Structure Management & insiders ~24% Stock Exchange / Symbol TSX.V: BAG Institutional ~10% Share Price $0. 11 Public ~66% Shares Outstanding 81,383,120 Warrants Outstanding 19,344,500 Insiders Options Outstanding 8,125,000 Institutional Pub

  5. Slide 5: Blende Silver Corp. – The Property

    Blende Silver Corp. – The Property Blende Property (100% owned) • The largest carbonate-hosted Ag-Zn-Pb deposit in the Yukon (M. Robinson and C.I. Godwin, Economic Geology 1995) 5

  6. Slide 6: Blende Project Access

    Blende Project Access Blende Ag-Zn-Pb Project Location and Access • 100% owned, fully permitted 5,346 ha property • 58 km winter road access • along Wind River Trail • 20 km north of Hecla’s high-grade Ag-Pb-Zn discovery at the Ocelot Project 6

  7. Slide 7: Resource Estimate

    Resource Estimate Cutoff In situ In situ Grades In situ Metal Content Category ZincEq Tonnage ZincEq Zinc Lead Silver OXRAT Zinc Lead Silver NSR (%) (ktonnes) (%) (%) (%) (gpt) (Mlbs) (Mlbs) (koz) ($CDN/t) Indicated 2.0 4,643 4.60 1.82 1.63 30.32 101.85 0.08 187 167 4,526 Inferred 2.0 42,243 4.49 1.

  8. Slide 8: Project Highlights

    Project Highlights • Mineralization extends >6 km along strike and >700 meters vertical. There is potential to substantially increase the Mineral Resource by drilling open pit extensions and stepping out from mineralized drill hole intercepts at the adjacent Far West, Central, Far East and Shanghai

  9. Slide 9: Proposed Exploration Program

    Proposed Exploration Program Field Program • Geological mapping and sampling program along extensions of the main Blende mineralization corridor. • 5,000 meters infill, extensional and metallurgical sample drilling to increase deposit size, grade and Mineral Resource. • Results to provide additional

  10. Slide 10: Recent Work Completed

    Recent Work Completed • Engaged Moose Mountain Technical Services (MMTS) to collect historic drill core samples for Specific Gravity determination, re-model the geology and prepare a NI 43-101 Technical Report and maiden Mineral Resource Estimate for the Blende Project. (Completed and filed on SEDAR

  11. Slide 11: Property History

    Property History • 1961 Geological Survey of Canada (GSC) noted Zn-Pb mineralization in region • 1975 Cyprus Anvil staked property • 1981 Archer-Cathro re-staked property • 1987 NDU Resources purchased property; 3 drill holes totalling 718 meters • 1989 Billiton Resources optioned property; 77 drill

  12. Slide 12: Key Personnel

    Key Personnel Andrew H. Rees, B.Comm – President & CEO, Director has over 20 years experience working with oil & gas and mining companies and has raised over $100 million in the public markets. In executive management roles, Mr. Rees has taken projects from discovery to commercial production. Mr. Re

  13. Slide 13: Corporate Information

    CORPORATE INFORMATION TSX.V: BAG – 81.38M shares issued Suite 1100, 1111 Melville Street Vancouver, BC, CAN, V6E 3V6 www.blendesilver.com Andrew H. Rees – CEO info@blendesilver.com (604) 505-3739 13

  14. Slide 14: Appendix

    \\L f; > mS : °"—§_—$_ Se Zz — Blende Silver Corp. BAG:TSX.V - APPENDIX -

  15. Slide 15: Blende Deposit Aerial Views

    Blende Deposit Aerial Views 15

  16. Slide 16: Blende Deposit Geology and Mineralization

    Blende Deposit Geology and Mineralization • The Blende deposit is a Proterozoic-aged carbonate-hosted massive sulphide deposit with features of both Irish-type and clastic-dominated Zn–Pb deposits (M.Moroskat et.al., Mineral Deposita 2014). and is the largest carbonate-hosted Zn-Pb-Ag deposit in Yuk

  17. Slide 17: Geology, Pit Resource Outlines and Long Section Traces

    Geology, Pit Resource Outlines and Long Section Traces 17

  18. Slide 18: West Zone Pit Resource Longitudinal Section

    West Zone Pit Resource Longitudinal Section *Moose Mountain Technical Services NI 43-101 Resource Estimate and Technical Report dated May 25, 2018. 18

  19. Slide 19: East Zone Pit Resource Longitudinal Section

    East Zone Pit Resource Longitudinal Section *Moose Mountain Technical Services NI 43-101 Resource Estimate and Technical Report dated May 25, 2018. 19

  20. Slide 20: East Zone Ag(g/t) and Zn+Pb% Distribution

    East Zone Ag(g/t) and Zn+Pb% Distribution 20

  21. Slide 21: West Zone Ag (g/t) and Zn+Pb% Distribution

    West Zone Ag (g/t) and Zn+Pb% Distribution 21

  22. Slide 22: Blende Metallurgical Results and Upsides

    Blende Metallurgical Results and Upsides • Despite the elevated extent of sulphide oxidation in the drill core metallurgical samples, test results showed a good response using conventional mineral processing procedures • Head grades ranged from 1.5% to 5.4% for Pb, 1.5% to 3.5% for Zn, along with 17

  23. Slide 23: Blende Metallurgical Results and Upsides

    Blende Metallurgical Results and Upsides Mr. Wright, P.Eng. states “With further evaluation the process response can be expected to improve on these results with ongoing project advancement. In part this would be due to evaluating more representative mineralized samples taken at depth that are shown

  24. Slide 24: Geology, Pit Resource Outlines and Expansion Targets

    Blende Geology, Pit Resource Outlines and Expansion Targets 24

  25. Slide 25: Exploration Upside

    Blende Exploration Upside Near Pit West Zone • The largest deposit defined to date at Blende. 2008 drill hole (BE08126) marked the first significant mineralization (24.7m @ 1.68% Pb+Zn and 5.7 g/t Ag; including 6.2m @ 4.87% Pb+Zn and 14.9 g/t Ag) encountered in the footwall of the BFZ (main deposit)

  26. Slide 26: Exploration Upside

    Blende Exploration Upside Central Zone • 2007 drill hole intersected 8.0m @ 3.4% Pb+Zn including 3.0m @ 6.5%. Warrants additional mapping, sampling and drilling Far East / Shanghai Zone • Recent discovery 3km to east of East Zone in 2004, with 3.0m @ 1.6% Pb+Zn, 6.0 m @ 1.3% Pb + Zn and 1.0m @ 4.3%

Blende Silver — Investor Presentation (January 2026) on 6ix