Unique Engineering & Construction Pcl · SET:UNIQ

Unique Engineering & Construction Pcl — Unique Engineering and Construction Public Company — FY2023 Earnings Presentation

78 slides from Unique Engineering & Construction Pcl's earnings presentation, Mar 12, 2024

  1. Slide 1: Investor Relationship Presentation

    12 March 2024 200 Jasmine lnternational Tower 15th Floor, Moo 4, Chaengwattana Rd., T.Pakkred, INVESTOR RELATIONSHIP A.Pakkred, Nonthaburi, 11120 PRESENTATION www.unique.co.th ir@unique.co.th

  2. Slide 2: Table of Content

    Table of Content Potential Future Projects 2 Interested Projects 35 Current Backlog 34 Financials 40 Experiences 46 Facilities and Machineries 72 1

  3. Slide 3: Government Infrastructure Projects

    Government Infrastructure Projects Grand Total Government Infrastructure Projects Distance (km.) Value (btbn) 1 Development of Inter-City Rail Network 7,792 2,700 2 Development of Land Transport Network 5,335 240 3 Development of Water Transport Network - 35.41 4 Development of Air Transport Network

  4. Slide 4: Development of Inter-City Rail Network

    DEVELOPMENT OF INTER-CITY RAIL NETWORK 3

  5. Slide 5: Double Track Railway

    Double Track Railway Double Track Routes Distance (km.) Value (btbn) Commenced 1 Kaeng Koi – Klong 19 110 10 2 Jira Road Station – Khon Kaen 185 26 3 Lop Buri - Pak Nampho 118 18.7 4 Mab Kabao - Jira Road Station, contract 1 and 3 66 16.9 5 Nakhon Pathom - Hua Hin 170 15.7 6 Prachuap Khiri Khan – Ch

  6. Slide 6: Double Track Railway

    Double Track Railway 3 uNioU ENGINEERING AND CONSTRUCTION PCL CHIANG KONG. Khon Kaen - Nong Khai ae Pai - jakorn Phanom KHON PHANOM CHONG MEK Korn Luang Nakhon Patho Hua Hin — Prachuab Khiri Khan PRACHUAP HIRT KHAN Prachuap Khiri Khan jum atthani - ang Nga. ; Phuk

  7. Slide 7: Pan Asian Railway Network

    Pan Asian Railway Network Linking Kunming to Singapore Eastern Route • 5,500 kilometers • Via Hanoi, Ho Chi Minh, Panom Penh Central Route • 4,500 kilometers • Via Vientiane, Nong Khai Western Route • 4,760 kilometers • Via Yangon All three routes will meet in Bangkok and Continue to final destinati

  8. Slide 8: East-West Economic Corridor (EWEC)

    7 East-West Economic Corridor (EWEC) 7

  9. Slide 9: North-South Economic Corridor (NSEC)

    North-South Economic Corridor (NSEC) 8

  10. Slide 10: High Speed Trains

    High Speed Trains ® BANGKOK - RAYONG e BANGKOK - CHIANG MAI ©@ BANGKOK - PADANG BESAR e BANGKOK - NONG KHAI Fy UNIQUE saree,

  11. Slide 11: High Speed Trains

    High Speed Trains High Speed Train Routes Distance (km.) Value (btbn) 1 Bangkok - Chiang Mai 672 152 2 Bangkok - Padang Besar 982 179 3 Bangkok - Rayong 220 420 Total 1,874 751 10

  12. Slide 12: Thai-China High Speed Railway

    Thai-China High Speed Railway Thailand-Chinese High Speed Rail Routes Distance (km.) Value (btbn) Phase 1 Bangkok - Nakhon Ratchasima 238.5 100 Total 238.5 100 11

  13. Slide 13: Development of Land Transport Network

    DEVELOPMENT OF LAND TRANSPORT NETWORK 12

  14. Slide 14: Mass Rapid Transit Lines map

    | 2. Light Pink Line (54 km.) Paki vata ‘unwcs ——sitt— Campi ° ee tL Se Pah RatBatamnanat Monument Vocnarapto! 2 eer Coons Raminvad Latha Whoo Rarminva3 Milan senans 7. Airport Rail Link (50.3 k a Marty as Phathacalan Thap hang Uatheabane Sarg oun ton conc Santneng ‘ea fiouig case seeg 3} tent wee 3

  15. Slide 15: 13 Mass Rapid Transit Lines

    13 Mass Rapid Transit Lines Mass Rapid Transit Line Employers Distance (km.) Value (btbn) Status Project 1 Dark Red Line Rangsit - Mahachai SRT 80.8 140,490 Commenced 2 Light Pink Line Kae Lai - Meenburi SRT 54 82,470 Commenced 3 Dark Green Line Lamlukka - Samurprakarn MRTA 66.5 94,970 Commenced 4 O

  16. Slide 16: The MRTA Orange Line (East and West) Project

    The MRTA Orange Line (East and West) Project (Taling Chan - Min Buri) 15

  17. Slide 17: The MRTA Purple Line (South) Project

    The MRTA Purple Line (South) Project 16

  18. Slide 18: The MRTA Brown Line Project

    The MRTA Brown Line Project (Khae Rai - Lam Sali) 17

  19. Slide 19: Tram-Train

    Tram-Train Tram-Train Distance (km.) Value (btbn) Status 1 Phuket 41.7 34.82 Pending 2 Chiang Mai(Underground) 34.93 99.5 Pending 3 Nakhon Ratchasima 54.87 32.5 Pending 4 Khonkaen 22.8 26.96 Pending 5 Pattaya 8 8 Pending 6 Hat-Yai 12.54 16.1 Pending Total 175 217.89 18

  20. Slide 20: Motorway

    Motorway Distance Value Motorway (km.) (btbn) Bang Pa In and Nakhon 1 196 84.6 Rachasima Bang Yai - Ban Pong - 2 96 45.9 Kanchanaburi 3 Pattaya - Mabtapud 32 18 4 Nakhonprathom - Cha Um 118 80.6 5 Had Yai - Sa Dao 70 30.5 Total 512 259.6 19

  21. Slide 21: Motorways (Bang Pa In - Nakhon Rachasima)

    Distance 196 km. Value 84.6 btbn Motorways (Bang Pa In - Nakhon Rachasima) 20

  22. Slide 22: Motorways Bang Yai – Ban Pong – Kanchanaburi

    Distance 96 km. Value 45.9 btbn Motorways Bang Yai – Ban Pong – Kanchanaburi 21

  23. Slide 23: Motorways Pattaya – Mabtapud

    M7 Motorways Pattaya – Mabtapud Distance 32 km. Value 18 btbn 22

  24. Slide 24: Motorways Nakornprathom – Cha Um

    Motorways Motorways Ban Yai – Ban Pong Nakornprathom – Cha Um Distance 118 km. Value 80.6 btbn 23

  25. Slide 25: Motorways Had Yai – Sa Dao

    Motorways Had Yai – Sa Dao Distance 70 km. Value 30.5 btbn 24

  26. Slide 26: Development of Water Transport Network

    DEVELOPMENT OF WATER TRANSPORT NETWORK 25

  27. Slide 27: Deep Seaport Project

    Hett+++t++t+ = Existed rail way tttttt++++++ ~=—- New proposed rail way New proposed 4 lanes roads New proposed roads Tse Ve—erett Deep Seaport Project 6) UNIQUE Besen,

  28. Slide 28: Deep Seaport Project

    Heng Fong Bag of Zergal MIDDLE EAST, EUROPE, .. “ pratiy Iciande SRP AWS | orl CHINA - PACIFIC, uh USA, . INDIAN OCEAN Bkccss fora KiHab ot — Imamiieriaink aia Deep Seaport Project Fy UNIQUE saree,

  29. Slide 29: Thailand Water Resources Management

    Thailand Water Resources Management Total Project: 4 projects Total Value: 8.8 Billion Baht Khong Wang Tanot Reservoir: Value = 6.1 Billion Baht Khong Praked Reservoir: Value = 0.96 Billion Baht Khong Hang Maeo Reservoir: Value = 0.82 Billion Baht To develop water resource in Chanthaburi Khong Phawa

  30. Slide 30: Development of Air Transport Network

    DEVELOPMENT OF AIR TRANSPORT NETWORK 29

  31. Slide 31: Airport

    Airport Suvanabhumi Airport – Phase 2 Don Mueang Airport – Phase 3 Ø Value = 62,000 Million Baht Ø Value = 32,000 Million Baht Chiang Mai Airport – Phase 2 Ø Value = 11,000 Million Baht 30

  32. Slide 32: Eastern Economic Corridor Development project (EEC)

    Eastern Economic Corridor Development project (EEC) 31

  33. Slide 33: Laem Chabang Port Phase 3

    Laem Chabang Port Phase 3 Ø Civil Work Value = 22,199 Million Baht Ø PPP (Operation) Value = 155,834 Million Baht 32

  34. Slide 34: UNIQUE's Interest

    UNIQUE’s Interest Mass Rapid Transit Double Tracks NSEC & EWEC High Speed Trains Motorways Ports Airports Water Management Eastern Economic Corridor Development project (EEC) 33

  35. Slide 35: Backlogs and Current Projects

    BACKLOGS AND CURRENT PROJECTS 34

  36. Slide 36: UNIQUE's Key Projects

    UNIQUE’s Key Projects Project Awarded Project Contract Projects Value Note Year Owner Life (btbn) JV with Kajima Corporation The Industrial Ring Road, Contract 3 2002 1.2 DRR 2002 – 2006 and Tokyu Construction (48% UNIQ) The Ramintra Outer Bangkok Ring Road Expressway, Contract 2007 1.7 EXAT 2007 –

  37. Slide 37: UNIQUE's Backlogs (1)

    UNIQUE’s Backlogs (1) Project Employers Value (btbn) Remaining (btbn) 1. The Construction of Mass Transit System Project in Bangkok (Red Line) (I) SRT 39.08 0.73 Contract 1: Civil Works for Bang Sue Grand Station and Depots 2. Orange Line Project Contract 4 Elevated Civil Works MRTA 10.87 0.04 (Khlo

  38. Slide 38: UNIQUE's Backlogs (2)

    UNIQUE’s Backlogs (2) Project Employers Value (btbn) Remaining (btbn) 10. The Cooperation between the Government of the Kingdom of Thailand and the Government of the People’s Republic of China on Bangkok – Nong Khai HSR Development for Regional Connectivity SRT 9.43 5.09 (Section I : Bangkok – Nakho

  39. Slide 39: UNIQUE's Backlogs (3)

    UNIQUE’s Backlogs (3) Project Employers Value (btbn) Remaining (btbn) 16. The Construction of a bridge across Khlong Maha Sawat, Ratchaphruek DRR 1.18 0.72 Road, Nonthaburi 17. The Construction of 2 bridges on the route 4060 Khao Chamao District, Kaeng Hang Maeo, Rayong, Chanthaburi DRR 0.59 0.47 18

  40. Slide 40: UNIQUE's Backlogs

    Signed The Contract: Ø The Construction of Highway no. 82 Bang Khun UNIQUE’s Backlogs Thian-Ban Phaeo Section Ekkachai-Ban Phaeo no. 6 Signed The Contract: Ø The Design and Construction of the Purple Line Project, Tao Pun - Rat Burana (Kanchanapisek Ø The Cooperation between the Road) Section Contra

  41. Slide 41: Financials

    FINANCIALS 40

  42. Slide 42: Financial Statement (P/L) (Million Baht)

    Financial Statement (P/L) (Million Baht) 2020 % 2021 % 2022 % 2023(4Q) % 2,644.47 Revenue from construction 10,798.97 99.15 10,936.91 99.43 99.56 10,319.08 98.94 2,655.93 Total revenue 10,891.23 100.00 11,000.14 100.00 100.00 10,429.73 100.00 2,207.39 Total cost 8,966.38 82.33 9,349.75 85.00 83.11 8

  43. Slide 43: Financial Statement (B/S) (Million Baht)

    Financial Statement (B/S) (Million Baht) 2020 % 2021 % 2022 % 2023(4Q) % Cash and Current Investment 384.00 1.14 3,784.14 9.15 4,076.69 11.21 2,836.00 7.57 A/R 2,975.59 8.87 2,875.86 6.95 2,850.08 7.84 2,835.14 7.56 Total Assets 33,562.99 100.00 41,361.76 100.00 36,369.19 100.00 37,456.95 100.00 Fin

  44. Slide 44: Key Financial Graphs

    Key Financial Graphs Construction Revenue (btbn) Gross Profit (%) 14 25 12.1 22.09 12 21.27 10.8 10.9 10.32 20 10 17.67 16.89 15 8 15 6 10 4 2.6 5 2 0 0 2019 2020 2021 2022 2023(4Q) 2019 2020 2021 2022 2023(4Q) Construction Cost + SG&A (%) Net Profit (btmn) 800 90 85 83.11 729.92 82.33 78.73 77.91 8

  45. Slide 45: Key Financial Graphs

    Key Financial Graphs Financial Cost (%) Net Gearing 3 14 2.5 2.42 12 11.58 2.18 1.97 10 2 1.88 8.75 8 7.23 7.46 1.5 1.36 5.94 6 1 4 0.5 2 0 0 2019 2020 2021 2022 2023(4Q) 2019 2020 2021 2022 2023(4Q) 44

  46. Slide 46: UNIQUE's Key Financial Ratios

    UNIQUE’s Key Financial Ratios Liquidity ratio 2019 2020 2021 2022 2023(4Q) Unit Current ratio 1.22 1.21 1.21 1.22 1.27 Times Quick ratio 0.80 0.92 1.02 1.05 1.11 Times Account receivable turnover 0.74 0.66 0.55 0.42 0.37 Times Debt to equity ratio 3.03 3.17 4.13 4.54 4.52 Times Financial debt to equ

  47. Slide 47: Experiences

    EXPERIENCES F UNIQUES Sere. 46

  48. Slide 48: The Industrial Ring Road (IRR)

    The Industrial Ring Road (IRR) 47

  49. Slide 49: The Industrial Ring Road (IRR)

    39 The Industrial Ring Road (IRR) 48

  50. Slide 50: SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan

    SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan 49

  51. Slide 51: SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan

    41 SRT Commuter Train Project (Red Line) Bang Sue – Taling Chan 50

  52. Slide 52: MRT Blue Line Extension Project Contract 3

    MRT Blue Line Extension Project Contract 3: Elevated Civil Works Tao Pun – Tha Phra Section 51

  53. Slide 53: MRT Blue Line Extension Project Contract 3

    MRT Blue Line Extension Project Contract 3: Elevated Civil Works Tao Pun – Tha Phra Section 52

  54. Slide 54: Construction of Mass Transit System Project in Bangkok

    Construction of Mass Transit System Project in Bangkok (Red line) (I) Contract 1: Civil Works for Bang Sue Grand Station and Depots 53

  55. Slide 55: The MRT Green Line (North) Project

    The MRT Green Line (North) Project Mo Chit - Saphan Mai – Khu Khot Section Contract 2: Civil Works Saphan Mai – Khu Khot Section and Associated Relevant Utility Relocation Works 54

  56. Slide 56: Mae Ngat – Mae Kuang Diversion Tunnel Project (Contract 2)

    Mae Ngat – Mae Kuang Diversion Tunnel Project (Contract 2) 55

  57. Slide 57: Link Road Ratcha Phruek - Kanchanaphisek Road

    Link Road Ratcha Phruek - Kanchanaphisek Road (North –South) 56

  58. Slide 58: The MRT Orange Line (East Section) Contract 4

    The MRT Orange Line (East Section) Project, Thailand Cultural Centre - Min Buri (Suwinthawong) Contract 4: The Elevated Civil Works 57

  59. Slide 59: The MRT Orange Line (East Section) Contract 6: Trackwork

    The MRT Orange Line (East Section) Project, Thailand Cultural Centre - Min Buri (Suwinthawong) Contract 6: Trackwork 58

  60. Slide 60: Track Doubling Project Lop Buri – Pak Nam Pho Contract 1

    The Construction of Track Doubling Project Section: Lop Buri – Pak Nam Pho Contract 1: Ban Klab – Khok Kathiam (Elevated Railway) 59

  61. Slide 61: Track Doubling Project Lop Buri – Pak Nam Pho Contract 2

    The Construction of Track Doubling Project Section: Lop Buri – Pak Nam Pho Contract 2: Tha Khae – Pak Nam Pho 60

  62. Slide 62: Bangkok – Nong Khai HSR Contract 4-2

    Republic of China on Bangkok – Nong Khai HSR Development for Regional Connectivity (Section I : Bangkok – Nakhon Ratchasima) Contract 4 - 2 : Civil Works (Don Mueang-Nava Nakorn Section) 61

  63. Slide 63: Bangkok – Nong Khai HSR Contract 4-6

    Republic of China on Bangkok – Nong Khai HSR Development for Regional Connectivity (Section I : Bangkok – Nakhon Ratchasima) Contract 4 - 6 : Civil Works (Phrakeaw – Saraburi Section) 62

  64. Slide 64: Rama 3-Dao Khanong – Western Outer Ring Road Expressway

    The Rama 3-Dao Khanong – Western Outer Ring Road Expressway Project: Contract 1 63

  65. Slide 65: Track Doubling Project: Banphai – Nakhonphanom Section

    Track Doubling Project: Banphai – Nakhonphanom Section Contract: 2 Nong Phok – Saphan Mittraphap 3 Section 64

  66. Slide 66: Design and Construction of the Purple Line Project

    The Design and Construction of the Purple Line Project, Tao Pun - Rat Burana (Kanchanapisek Road) Section Contract 4: Underground Civil Works Memorial Bridge - Dao Khanong Section 65

  67. Slide 67: Off Terminal Check-in Building at Phuket International Airport

    The Off Terminal Check-in Building at Phuket International Airport 66

  68. Slide 68: Junction between the BRT and BTS station

    Construction the junction between the BRT and BTS station (Sathorn Road – Narathiwat Intersection) 67

  69. Slide 69: Ramintra Outer Bangkok Ring Road Expressway, Contract 1 & 2

    The Ramintra Outer Bangkok Ring Road Expressway, Contract No. 1 & 2 68

  70. Slide 70: Ramintra Outer Bangkok Ring Road Expressway, Contract 1 & 2

    The Ramintra Outer Bangkok Ring Road Expressway, Contract No. 1 & 2 69

  71. Slide 71: Highway Route No.302 Bridge Over Chao Phraya River

    Highway Route No.302 (RATANATHIBETH) Section : Bridge Over Chao Phraya River 70

  72. Slide 72: Highway Route No.302 Bridge Over Chao Phraya River

    Highway Route No.302 (RATANATHIBETH) Section : Bridge Over Chao Phraya River 71

  73. Slide 73: Facilities and Machineries

    Facilities and Machineries 72

  74. Slide 74: Technologies & Facilities: Precast Segment Yard

    UNIQUE’s Technologies & Facilities Precast Segment Yard 73

  75. Slide 75: Technologies & Facilities: Heavy Machinery

    UNIQUE’s Technologies & Facilities Heavy Machinery 74

  76. Slide 76: Technologies & Facilities: Bored Pile Machines

    UNIQUE’s Technologies & Facilities Bored Pile Machines 75

  77. Slide 77: Technologies & Facilities: Steel Works

    UNIQUE’s Technologies & Facilities Steel Works 76

  78. Slide 78: Engineering and Construction Public Company Limited

    o ENGINEERING AND CONSTRUCTION PUBLIC COMPANY LIMITED

Unique Engineering and Construction Public Company — FY2023 Earnings Presentation on 6ix