  1. Slide 1: Ounces/Year (AuEq) x1,000 Annual Production

    Ounces/Year (AuEq) x1,000 700 g 8 g 8 8 8 8 10 8 0 Wo We MB Yo YS Ye YF Y8 Yo lm AuEq Ounces/Yr ==»AuEq Head Grade 6 3 z 33 9 3 iy arc) 3 § 3° 3 $ 2 22 ° g a1 < 0 Y1-Y5 Annual Production 455,000 AuEq oz Y1-Y10 Annual Production 370,000 AuEq oz LOM Annual Production 324,000 AuEq oz

  2. Slide 2: Processing Overview

    Processing Overview The process flowsheet in the DFS has been simplified and de-risked from that which was developed for the 2022 FS. In Years 1 through 5, 3.0 million tonnes per annum (“Mtpa”) will be processed. A pebble crusher will be added in Year 3 to maintain production when harder ore is proc

  3. Slide 3: Process flowsheet diagram

  4. Slide 4: Mine site infrastructure layout

    oo MG Ore Stockpile _—— Mine — Maintenance Shop —— Tire Shop Admin Building & Mine Dry

  5. Slide 5: Mine Maintenance & Process Infrastructure

    Mine Maintenance & © Process Infrastructure 1G Ore Stockpile ¢ MG Ore Stockpile South Pit Eskay Creek Property Boundary