Lake Victoria Gold Ltd · TSXV:LVG
Lake Victoria Gold — Tembo Gold — Investor Presentation (January 2013)
31 slides from Lake Victoria Gold's investor presentation, January 2013
Slide 1: High Grade Gold Exploration in Tanzania
TSX-V: TEM High Grade Gold Exploration in Tanzania Investor Presentation, January 2013
Slide 2: Cautionary Note
Cautionary Note This presentation includes certain statements that may be deemed forward-looking. All statements in this presentation, other than statements of historical facts, that address future production, mineral resource or mineral reserve potential, results of exploration drilling, geological
Slide 3: Tembo at a Glance
Tembo at a Glance • Highly Prospective Tanzanian Gold Asset – A 101km2 contiguous area consisting of 33 active licences and 5 under application, adjacent to African Barrick's 14Moz Bulyanhulu Mine in the prolific Lake Victoria greenstone belt of Tanzania – Significant initial drill results with best
Slide 4: Capital Structure
Capital Structure Clean capital structure with limited shares outstanding Capital Structure Holders TSX-V Symbol TEM Management & Founders 20% Share Price (as at Jan 11, 2013) $0.57 49 North Resources 10% 52 Week Range $0.35 - 2.29 BEC International 10% Issued and Outstanding 49,486,213 Institutiona
Slide 5: Management Team
Firsthand and Extensive Experience MANAGEMENT TEAM TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 5 www.TemboGold.com
Slide 6: Directors & Management
Directors & Management Former Bulyanhulu management leading the company • David Scott – President & CEO – Former Technical Services Manager for Barrick Gold’s subsidiary Kahama Mining Corporation; responsible for all Technical Services at Bulyanhulu including on-mine exploration activities – Over 32
Slide 7: Directors & Management
Directors & Management Experienced mining professionals strengthen the corporate team • John Seaman – CFO/Director – Mr. Seaman has been involved with several successful mining projects and is currently the CFO for Premier Gold Mines – Previously held the position of CFO of Wolfden and Pediment whic
Slide 8: Tembo Gold Project
Historic and Recent Work TEMBO GOLD PROJECT TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 8 www.TemboGold.com
Slide 9: Lake Victoria Mining Camp
Lake Victoria Mining Camp An established mining camp with several multi-million ounce gold deposits • Six modern mining operations • Significantly improved infrastructure • Strong gold endowment • Well understood geological granite greenstone terrane with parallels worldwide M&I Inferred Company Min
Slide 10: The Tembo Project
The Tembo Project 101km2 land package adjacent to African Barrick’s 14Moz Bulyanhulu mine • Large contiguous ground holding – 94km2 active licence area and 7km2 under application • Project credentials – Historic exploration database with good results – >10km of extensively continuous artisanal worki
Slide 11: Historical Exploration
Historical Exploration Exploration results suggest a highly prospective area that is under-drilled • Airborne magnetics – Defines the extent of the greenstone geology that hosts gold mineralisation – Confirms geological continuity with the area to the southeast – Clearly defines magnetic structures
Slide 12: Artisanal Activity
Artisanal Activity Significant artisanal activity further confirms gold mineralization • Over 2,000 artisanal miners operating over 100 active mine shafts • More than 2,800 shafts located along Bulyanhulu parallel, east-west, and northwest trending structures totaling over 10km of artisanal mining z
Slide 13: LIDAR and Recent Field Mapping
LIDAR and Recent Field Mapping 2011 LIDAR survey identifies over 10km of artisanal mining zones • LIDAR survey and field mapping – Digital terrain model (DTM) and high resolution orthophoto identified numerous previously unrecorded areas of mining – Individual laterally continuous zones of mining sh
Slide 14: Tembo Drilling Status
Tembo Drilling Status 35,328m in 192 holes (57 DD and 135 RC) completed to date • Ngula 1 – 7,785m of DD (32 holes) and 7,035m of RC drilling (37 holes) completed – Targeting two structural zones focusing on a southern set of east-west, and interpreted northwest and northeast intersecting structures
Slide 15: Interpretation of Ngula1 as the Horsetail off the Bulyanhulu structure
Interpretation of Ngula1 as the “horsetail” off the Bulyanhulu structure Compressional transfer bend north of Ngula1 Bulyanhulu Bulyanhulu Inferred kinematics (left-lateral strike slip shear-vein) Ngula1 horsetail zone - A dilatant “tail” to the Bulyanhulu structure with clear Branching high-grade p
Slide 16: Ngula Drilling Update
Ngula 1 Drilling Update A 600m strike length across multiple structures, grades ranging between 1-300g/t gold Note: Detailed information on all drill results available on the company website TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 16 www.TemboGold.com
Slide 17: Ngula Drill Results
Ngula 1 Drill Results Several drill holes encountered multiple zones of mineralization • Highlights Include: – TDD0004: 3.13 g/t gold over 25.89m from 41.00m including 9.38 g/t gold over 6.30m; – TDD0005: 5.14 g/t gold over 8.50m, including 15.59 g/t gold over 2.68m; – TDD0010: 6.44 g/t gold over 1.
Slide 18: Nyakagwe East Drilling Update
Nyakagwe East Drilling Update A 1,000m strike length across multiple structures, grades ranging between 1-61 g/t gold Note: Detailed information on all drill results available on the company website TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 18 www.TemboGold.com
Slide 19: Mgusu Drilling Update
Mgusu Drilling Update High grade drill results and artisanal grab samples confirm significant mineralization Note: Detailed information on all drill results available on the company website TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 19 www.TemboGold.com
Slide 20: Nyakagwe Village
Nyakagwe Village Multiple high grade gold intersections both near surface and at 300m depth Note: Detailed information on all drill results available on the company website TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 20 www.TemboGold.com
Slide 21: Drill Results Overview
Drill Results Overview High grade gold mineralization demonstrated on multiple targets TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 21 www.TemboGold.com
Slide 22: Immediate Drill Program
Immediate Drill Program Resource development and depth extent testing of high grade zones at Ngula 1 • Drilling will be conducted along a 600m strike length • 50mx50m spaced in-fill diamond drilling from surface to -200m • Approximately 48 holes 12,000m • Define an inferred resource that may be expl
Slide 23: Investment Summary
Investment Summary • HIGHLY PROSPECTIVE GOLD ASSET: Located adjacent to African Barrick's 14Moz Bulyanhulu Mine in the prolific Lake Victoria Greenstone belt, the 101km2 property has highly prospective geology, encouraging earlier exploration with promising results, and multiple targets identified •
Slide 24: Appendix
Additional Info APPENDIX TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 24 www.TemboGold.com
Slide 25: Artisanal Mining Faces
Artisanal Mining Faces Artisanal mining of well developed quartz veins TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 25 www.TemboGold.com
Slide 26: Ngula Drill Results
Ngula 1 Drill Results Several drill holes encountered multiple zones of mineralization • Highlights Include: – TDD0004: 3.13 g/t gold over 25.89m from 41.00m including 9.38 g/t gold over 6.30m; – TDD0005: 5.14 g/t gold over 8.50m, including 15.59 g/t gold over 2.68m; – TDD0010: 6.44 g/t gold over 1.
Slide 27: Nyakagwe East
Nyakagwe East Multiple zones of mineralization at varying depths • Highlights Include: – TDD0019: 3.51 g/t gold over 2.45m from 67.35m including 11.30 g/t gold over 0.34m; – TDD0029: 61.8 g/t gold over 0.68m from 277.24m, and 3.93 g/t gold over 1.47m, including 5.28 g/t gold over 0.62m from 140.53m
Slide 28: Preliminary Metallurgical Testing
Preliminary Metallurgical Testing Preliminary metallurgical test work indicates ~90-95% gold recoveries • Gold Deportment Procedure – Artisanal face samples grouped and composited into low, medium and high- grade – Amenability to gravity recovery tested by Knelson concentrator – Mineralogical charac
Slide 29: Bulyanhulu Geology
Bulyanhulu Geology Mineralized reefs along steeply dipping northwest striking structure • A 14m million ounce narrow-vein shear hosted gold deposit with silver and copper mineralisation • Shear zone situated within a narrow argillite unit at a contact within a volcanic sequence • Sulphide mineraliza
Slide 30: Bulyanhulu Long Section
Bulyanhulu Long Section A high grade narrow vein 14Moz deposit >4km long, >2km deep, ~2m wide TSX-V: TEM / OTCQX: TBGPF / FSE: T23 January 2013 30 www.TemboGold.com
Slide 31: Technical & Local Team
Technical & Local Team The Mineral Corporation hands-on team has a wealth of experience • Dr. Johan Krynauw – Senior Geological Advisor – Thirty-nine years of experience as a geologist, including base and precious metals exploration and exploration management in the Archaean terranes of Africa, with