  1. Slide 1: Developing the Next Tier 1 Gold & Silver Mine

    Developing the Next Tier 1 Gold & Silver Mine Corporate Presentation April 2026 TSX: SKE | NYSE: SKE www.skeenagoldsilver.com

  2. Slide 2: Forward Looking Statements

    Certain statements and information contained or incorporated by reference in this news release constitute “forward-looking information” and “forward-looking statements” within the meaning of applicable Forward Canadian and United States securities legislation (collectively, “forward-looking statemen

  3. Slide 3: Eskay Creek is a Cashflow Focused Gold & Silver Mine

    Eskay Creek is a Cashflow Focused Gold & Silver Mine Large -Scale Gold & High Low Operating Robust Cashflow & Major Construction Silver Production Gold Grade Costs Profitability Underway 450,000 gold equivalent 5.5 gpt gold equivalent in US$538 per oz AISC Projected annual after -tax free On schedul

  4. Slide 4: Rigorous Permitting Process Completed

    R igorous Permitting “A collaborative effort drawing on leadership from Tahltan Nation, community comments, regulators and Skeena’s expert team.” Process Completed Nalaine Morin SVP, Environment & Social Affairs EA 180 Day Revised 180 Day IBA Vote S ection 7 EA Major Certificate Review Application R

  5. Slide 5: Our Track Record of Delivering on Commitments in our Journey to Production

    Our Track Record of Delivering on Commitments in our Journey to 2026 -2027 Production 2023 -2025 2019 -2022 2016 -2018 Received all permits for construction Improved Definitive Feasibility Study Full scale construction Secured project financing Publish updated NI 43-101 to Upgraded resource commitme

  6. Slide 6: Existing Infrastructure Provides Substantial Cost Savings

    Projects Existing TAHLTAN TERRITORY SADDLE Operations Newmont Infrastructure RED CHRIS Provides Substantial SCHAFT CREEK Teck Newmont Cost Savings GALORE CREEK Teck COAST MOUNTAIN HYDRO FACILITY Access & transport SNIP + Connected via Highway 37 for all -weather access Skeena KSM Seabridge BRUCEJACK

  7. Slide 7: Exceptional Economics Drive Cashflow & Fast Payback

    Exceptional Economics Payback (Years) Drive Cashflow & 1.2 < 8 months < 7 months Fast Payback $14,000 NPV(5%) $CAD IRR 138% 140% Annual Financial Metrics (Years 1 -5) at $12,000 10 7% Spot Prices ($ CAD ) 120% $10,000 100% $8,000 $ 2.8 Billion $ 2.6 Billion 80% (2) Annual EBITDA (2) $6,000 Annual re

  8. Slide 8: Front Loaded Production Profile Driven by Grade

    Front Loaded Production Profile 800 Opportunities to backfill Driven by Grade 700 6.2 gpt 6.0 gpt production profile with satellite deposits in the area 5.5 gpt 600 5.1 gpt 4.6 gpt 4.2 gpt 4.0 gpt 450,000oz 5.5 gpt gold 500 Elevated annual gold Elevated gold 2.4 gpt 2.6 gpt equivalent production equ

  9. Slide 9: Project Execution Schedule

    Project H1 - 25 H2 - 25 H1 - 26 H2 - 26 H1 - 27 H2 -27 Execution PERMANENT Initial Tie ins Permanent Power Complete Schedule POWER TAILINGS DAM & WATER MANAGEMENT Pre -stripping Commences Initial Fleet Mobilized Ore Mining Commences MINING PROCESS PLANT 92 % Complete (detailed) Engineering Long Lead

  10. Slide 10: Project is Substantially De-risked; 49% Complete on Construction

    Project is Substantially De -risked; 49% Complete on Construction Project Capital Incurred (Dec 31, 2025) US$305 million Remaining Project Capital Requirement US$354 million Remaining Scopes: Process Plant Construction Mechanical installation of all mill components, piping, and electrical/instrument

  11. Slide 11: 2026 Capital Cost Changes vs 2023 DFS

    2026 Capital Cost Changes vs 2023 DFS Process Plant & Ore Handling ﹢S ome design modifications made in final engineering to improve operability of the process plant Tailings & Water Management ﹢Tighter water discharge standards necessitated increases in water management facilities ﹢Tahltan values we

  12. Slide 12: Construction is Rapidly Advancing

    Construction is Rapidly Advancing Construction Progress ( Feb 28, 2026) 49% Committed Capital ( Feb 28, 2026) 66% Detailed engineering (Feb 28, 2026) 92% Procurement (Feb 28, 2026) 88% Bulk earthworks & mining Waste & water management Completed Items • Earthworks is performed in -house. • The pilot

  13. Slide 13: Summary of Refinancing Strategy

    Summary of “ At Skeena, we continue to redefine what's possible in the mining Industry by turning bold ideas into transformative outcomes. As the Refinancing Strategy first prerevenue -generating company to issue a public high bond, we’ve demonstrated the market’s confidence in the -yield Skeena has

  14. Slide 14: World Class Gold Grade & Scale

    World Class Gold Top global open -pit gold mines by grade ( gpt ) (3) Grade & Scale Kekura (Highland Gold) Eskay Creek (Y1-5) Salares Norte (Gold Fields) 5.4 5.5 7.0 Meliadine (Agnico Eagle) 5.3 Kyzyl (Solidcore) 5.1 Eskay Creek 3.6 Veduga (Solidcore) 3.4 PROVEN & PROBABLE GOLD RESERVES Loulo (Barri

  15. Slide 15: Eskay Creek is Canada's Largest Silver Mine

    Eskay Creek is Top global primary silver production (2) Canada’s Largest Saucito (Fresnillo) Cannington (South32) San Julian (Fresnillo) 11.8 12.7 14.5 Silver Mine Pirquitas (SSR Mining) Uchucchacua (Buenaventura) Juanicipio (Fresnillo's 56% stake) 10.5 10.5 10.4 Fresnillo (Fresnillo) 10.2 Eskay Cre

  16. Slide 16: Bulk Earthworks & Mining

    Bulk Earthworks & Mining Majority of mining is performed with in -house expertise Mining the North Pit MRSA Water Collection Pond 16

  17. Slide 17: Haul Road & Komatsu Fleet

    Haul Road & Komatsu Fleet 17

  18. Slide 18: Process Plant Progress

    Process Plant Progress September 2025 December 2025 18

  19. Slide 19: Process Plant - Interiors

    Process Plant - Interiors April 2026 – Ball Mill mechanical installation April 2026 – Rougher flotation cells 19

  20. Slide 20: Waste & Water Management

    Waste & Water Management February 2026 20

  21. Slide 21: Volcano Creek Substation

    Volcano Creek Substation Concrete pedestals for ringbus complete Backfill complete 21

  22. Slide 22: New Employee Camp Location

    New Employee Camp Location February 2026 22

  23. Slide 23: Significant Re-rate Ahead as Eskay Creek Achieves Production

    Significant Re -rate Lundin Gold (1) Ahead as Eskay Creek Artemis Gold (1) 2026E production: 508k oz Au 2026E FCF: C$ 1.6 billion 2026E production: 286k oz Au Achieves Production 2026E OCF: C $ 63 7 million Market cap of C$9B P/NAV = 0.7x Market cap of C $ 25B P/NAV = 2.2 x (2,3) Skeena Gold & Silve

  24. Slide 24: Strong Shareholder Support

    Strong Shareholder Support Research Coverage Shareholders Agentis Michael Gray Helikon Investments Ltd. 13.0% Insiders BMO Andrew Mikitchook Deutsche Balaton AG 9.0% Retail/Public 2% CIBC Luke Bertozzi 25% TD Wayne Lam KGH Ltd. 5.3% Canaccord Jeremy Hoy Van Eck 4.0% Desjardins Allison Carson Raymond

  25. Slide 25: Connect with Investor Relations

    Connect with Investor Relations For more insights info@skeenagold.com Follow us on social: TSX: SKE | NYSE: SKE www.skeenagoldsilver.com

  26. Slide 26: A BC Leadership Team

    A BC Leadership Team Walter Coles Randy Reichert Andrew Nalaine Morin Justin Deep development expertise Executive Chairman Chief Executive Officer SVP, Environment & with the correct management MacRitchie Himmelright Chief Financial Officer Social Affairs SVP, External Affairs team in place Kanako G

  27. Slide 27: Mineral Reserves & Mineral Resource Estimates

    Mineral Reserves & Mineral Resource Estimates Eskay Creek Resources & Reserves – Pit -constrained (as of December 31, 2023) Tonnes Au Ag AuEq Au oz Ag oz AuEq Oz (Mt) (gpt) (gpt) (gpt ) (Moz) (Moz) (Moz) Mineral Reserves Proven 28.0 3.0 80.9 4.1 2.7 72.7 3.7 Probable 11.9 1.8 40.1 2.3 0.7 15.3 0.9 T

  28. Slide 28: Mineral Resource Estimate

    Mineral Resource Estimate Eskay Creek Resources – Underground (as of December 31, 2023) Tonnes Au Ag AuEq Au oz Ag oz AuEq Oz (000) (gpt) (gpt) (gpt ) (Koz) (Koz) (Koz) Mineral Resources Measured 834 5.3 142.6 7.3 142 3,830 196 Indicated 988 4.1 55.7 4.9 131 1,768 156 Total Measured + Indicated Reso

  29. Slide 29: Non-IFRS Measures

    Non -IFRS Measures Non -IFRS Measures This presentation refers to various non -IFRS measures, such as “AISC", “total cash costs per ounce sold”, “average realized pric e per ounce sold” and “free cash flow”. These measures do not have a standardized meaning prescribed by IFRS as an indicator of perf