  1. Slide 1: Acquisition of GDF Suez Assets in Central America

    Slide 1: Acquisition of GDF Suez Assets in Central America

    Acquisition of GDF Suez Assets in Central America August 2014

  2. Slide 2: Cautionary Note

    Slide 2: Cautionary Note

    Cautionary Note This presentation has been prepared by Celsia S.A. E.S.P. (the "Company" or "Celsia"). Information is its own or that of companies in which it has majority shares, and is not definitive nor has it been audited. The information contained in this document is thus subject to modificatio

  3. Slide 3: Celsia takes its first step in international expansion in Central America

    Slide 3: Celsia takes its first step in international expansion in Central America

    Celsia takes its first step in international expansion in Central America Strategic area defined for expansion GDF Suez Assets in Central America Second largest energy generator in terms of installed capacity, following AES. Assets with the greatest strategic relevance to this country. 4 2 3 1 San J

  4. Slide 4: USD 840 million enterprise value and impact on Celsia capacity and EBITDA

    Slide 4: USD 840 million enterprise value and impact on Celsia capacity and EBITDA

    The transaction includes: Dos Mares Hydroelectric Complex, Bahía Las Minas Thermoelectric Complex, Cativá and Guanacaste Wind Farm USD 840 million enterprise value (EV) + 20% 2014 Pro-Forma EBITDA + 30% installed capacity to reach 2,312 MW (+535 MW) + 32% average expected energy generation to reach

  5. Slide 5: One of the few opportunities in the region's electricity sector

    Slide 5: One of the few opportunities in the region's electricity sector

    Area with strong economic and sector foundations Panama One of the few opportunities  Number one country in per- in the region's electricity sector capita GDP in Central America  3.6 million inhabitants Potential for energy connection  Investment level  8,700 GWh-a energy demand  2,3 GW capacit

  6. Slide 6: Panama projected demand and generation capacity expansion plan

    Slide 6: Panama projected demand and generation capacity expansion plan

    Panama needs investment in additional generation capacity. Increase of 1,084MW (+46%) Projected demand (GWh)  Growth of demand 15.385 16.258 14.560 at the national 13.778 12.339 13.039 level, correlation 11.050 11.677 10.458 with GDP 9.328 9.888 evolution 2014e 2015e 2016e 2017e 2018e 2019e 2020e 2

  7. Slide 7: Reduction in capacity margin until 2019

    Slide 7: Reduction in capacity margin until 2019

    Reduction in capacity margin until 2019 107.2 88.0 92.3 87.5 Imports 76.8 59.5 and exports 36.2 37.5 32.5 31.2 25.9  Through 2019, Panama will require (24.7) (29.3) (27.6) (20.7) (38.5) (45.1) (45.2) an increasing (62.9) (66.4) (52.3) (84.8) amount of energy 2014e 2015e 2016e 2017e 2018e 2019e 2020

  8. Slide 8: Dos Mares Hydroelectric Complex (DMA), 118 MW

    Slide 8: Dos Mares Hydroelectric Complex (DMA), 118 MW

    Dos Mares Hydroelectric Complex (DMA), 118 MW Three run-of-river power plants - Prudencia, Lorena and Gualaca - that make use of the Estí river basin. Sub-stations, distribution lines and 19 kilometers of flow channels associated with these assets.

  9. Slide 9: Bahía Las Minas (BLM), 120 MW coal and 160 MW combined cycle diesel

    Slide 9: Bahía Las Minas (BLM), 120 MW coal and 160 MW combined cycle diesel

    Bahía Las Minas (BLM),120 MW coal and 160 MW combined cycle diesel The country's largest energy thermal generation complex Two independent power plants with seven energy generation units, for a total capacity of 280 MW Coal Power Plant: one boiler and three steam turbines, amounting to 120 MW Combin

  10. Slide 10: Cativá (IDB), 87 MW

    Slide 10: Cativá (IDB), 87 MW

    Cativá (IDB), 87 MW Fed by bunker fuel (Heavy Fuel Oil, HFO) Located in Bahía Las Minas (Colón). Has an installed capacity of 87 MW and uses 10 internal combustion motors

  11. Slide 11: Guanacaste Wind Farm (PEG), 49.5 MW, Costa Rica

    Slide 11: Guanacaste Wind Farm (PEG), 49.5 MW, Costa Rica

    Guanacaste Wind Farm (PEG), 49.5 MW, Costa Rica.  Celsia's first wind farm power plant. Historic dispatch (GWh) – 2010-2014  One of the largest wind farm plant in the 214 198 country 175 151 65%  Located in the Bagaces Canton. 49% 46% 40% 117  Fifty-five 900 kW Enercon E-44 turbines. 35%  The P

  12. Slide 12: Fit with the Organization's strategy

    Slide 12: Fit with the Organization's strategy

    Diversified and synergistic assets that are connected to the Organization's strategy Fit with the Organization's strategy  Internationalization with an asset mix that is strategic and diversified for Celsia  Diversification of income and risks  Area defined as strategic to international developme

  13. Slide 13: Thank You

    Slide 13: Thank You

    W CELSIA Thank You www.celsia.com Una empresa [ ) GRUPO ARGOS

Source: Internet Archive copy of celsia.com

More decks from Celsia SA ESP

All 68 Celsia SA ESP decks