Slide 1: Wizard Lake Oil Development in Canada
Wizard Lake Oil Development in Canada Growth through exploration success Investor Presentation April 2019 Slide 1

Slide 2: WBE: ASX's Expanding Oil and Gas Producer
WBE : ASX’S EXPANDING OIL AND GAS PRODUCER Vision: To build a mid-tier oil & gas producer through drilling and acquisition. Alberta, Canada Existing production base • 270 boepd (net to WBE) Wizard Lake Oil Discovery - Jan 2019 Western Australia • Rex 1 discovery well produced 300-400bopd oil* 100% W

Slide 3: Whitebark – The Numbers
WHITEBARK – THE NUMBERS Assets Generating Value Value Opportunity 37,000 270 boe/d Current production 2019 Exit Rate Target: ~800 boe/d ~A$6m >$4m* Net Cash (no debt) Net acres 27% liquids 60% liquids Enterprise Value (EV) 2,355,000 boe** 3 Rex-1: Drilled Rex-2 ~ Mid19 EV/2P Canada Average: Current

Slide 4: Disciplined Strategy Execution
DISCIPLINED STRATEGY EXECUTION Well-defined growth strategy Focus: Wizard Lake Development Alberta, Canada Phase 1: Completed* Reserves and Opportunistic Production • Rex-1 successfully drilled. Purchases Growth • Flowing 300-400 bopd prior to end of cleanup testing. Good Quality Assets at Drilling

Slide 5: Phase 1: Rex-1 Well Successful
PHASE 1: REX–1 WELL SUCCESSFUL* On schedule, exceeded flow expectations, confirms internal mapping of prospect • WBE working interest 30%. • Spud on 24/11/19. Drilled in 10 days – on schedule. • Encountered continuous good quality reservoir: • Depth 1414m TVD; • Horizontal length ~1237m; • 10-18% po

Slide 6: Whitebark's Wizard Lake Development
WHITEBARK’S WIZARD LAKE DEVELOPMENT • Wizard Lake oil field is adjacent to major service providers at Leduc and Edmonton = low drilling and completion costs. • Edmonton is the oil pricing hub for Canadian sweet crude and has a refining capacity of over 300,000 bopd. • Existing infrastructure reduces

Slide 7: Phase 2: Funded and Underway
PHASE 2: FUNDED AND UNDERWAY* Production Facilities and Pipeline: Rex-1 in production in Q2 2019 • Production Facilities will include multi‐well pad, associated processing equipment and a pipeline to Rex-1 located 1.6km to SE. • All necessary landholder and licenses have been approved, enabling two

Slide 8: Phase 2: 2019 Minimum Two Well Drilling Program
PHASE 2: 2019 MINIMUM TWO WELL DRILLING PROGRAM* Rex-2 and Rex-3 offer step change to WBE’s production profile • Rex-2 planned to commence drilling ~mid CY19: • Targeting 300-400bopd; • On existing surface location; • Target depth 1,500 metres, target lateral length 2000 metres; • 40-50 stage frac;

Slide 9: Further Development Potential
FURTHER DEVELOPMENT POTENTIAL Likelihood of 12 to 17 gross well locations* with similar characteristics to initial Rex well • Based on McDaniel & Associates proven well spacing WBE • Whitebark has commenced preliminary planning for expects 12 to 17 gross development wells in the Wizard full field de

Slide 10: Investment Summary – Participate in a Growth Story
INVESTMENT SUMMARY – PARTICIPATE IN A GROWTH STORY Activity – Firm Funded Program • Rex-1 successfully drilled, tested 300-400 bopd. • Rex-1 on production and tied to new facilities Q2 2019. • Rex-2 spud mid 2019. • Rex-3 spud Q4 2019. Outcome • Target 800-1200 boe per day. Current Enterprise Value:

Slide 11: Disclaimer
DISCLAIMER No representation or warranty, expressed or implied, is made by Whitebark Energy Ltd that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, Whitebark Energy, their officers, employees and advisers

Slide 12: Reserve Statement and Glossary of Terms
RESERVE STATEMENT AND GLOSSARY OF TERMS Conventional Oil Natural Gas Natural Gas Barrels of Oil Reserve class (mbbl) (mmcf) liquids (mbbl) Equivilant (mboe1) Proved 1P June 2018 reserves report2 77.0 2517.0 76.6 573.1 4.6 1852.5 35.0 348.4 112.5 396.0 22.4 200.9 Total Proved 1P 2018 reserves report2

Slide 13: Thank you
Thank you David Messina Managing Director E: david.messina@whitebarkenergy.com Slide 13
Source: company website
More decks from H3 Energy Limited
Shareholder Meeting (November 2026)7 slides · Nov 18, 2026
Investor Presentation (April 2026)36 slides · Apr 30, 2026
Investor Presentation (March 2026)14 slides · Mar 4, 2026
Whitebark Energy — NH2A Conference October 202520 slides · Oct 22, 2025
Merger or Acquisition (December 2024)16 slides · Dec 23, 2024
Merger or Acquisition (December 2024)15 slides · Dec 23, 2024