    Disclaimer This presentation and any materials provided to the reader (“the Materials”) have been prepared by AXP Energy Limited (“AXP” or “Company”) and contain general information about FPL’s activities. By accepting the Materials you agree to be bound by the terms and conditions below. The Materi

  3. Slide 3: Quarterly Summary

    Quarterly Summary QUARTERLY NET REVENUE BY HYDROCARBON § Quarterly Net Revenue $4,386,654 (prior Quarter $1,730,518) § Net customer receipts $3,733,924 (prior Quarter $1,880,643) § 24,584 BBL sold (prior Quarter 12,894 BBL) § Inventory at 23,215 BBL at Quarter end § Gas sales of 694 Mcf and NGL sale

  4. Slide 4: Quarterly Summary: Monthly Net Revenue

    Quarterly Summary MONTHLY NET REVENUE [$ ‘000] TOP LINE (REVENUE) 1600 1400 § Gas & NGL sales were pressured due to external factors – 1200 1000 more upside as stability returns 800 § Oil revenue tripled through the quarter – growth in monthly 600 400 production is a key focus 200 IMPROVING THE COST

  5. Slide 5: Quarterly Production Summary

    Quarterly Production Summary DAILY PRODUCTION WITH WEEKLY AVERAGES BY HYDROCARBON (BOEPD) 2,500 2,300 2,000 Rogersville plant intermittent Offtake Enbridge lateral Enbridge lateral shutdowns (gas) outage (gas) downtime (gas) Ongoing refinery downtime (gas) shutdowns (oil) 1,500 1,000 500 0 W/E W/E W

  6. Slide 6: Current Well Status

    Current Well Status MHP TREY CO KY JV TOTAL PRODUCING 893 75 19 22 1,009 TO BE CONNECTED 145 3 5 22 175 UNDER REVIEW 75 30 1 5 111 P&A 140 11 3 11 165 TOTAL 1,253 119 28 60 1,460 § 175 wells temporarily offline and to be reconnected in coming quarters § A further 111 wells are being reviewed and wil

  7. Slide 7: Production Enhancement Program (Internally Funded)

    Production Enhancement Program (Internally Funded) 2021 PRODUCTION ENHANCEMENTS JUL (F) AUG (F) SEP (F) OCT (F) NOV (F) DEC (F) 1 KAYJAY PIPELINE UPGRADE - 31 WELL TIE-IN 6 WELLS 6 WELLS 6 WELLS 8 WELLS PHASE 3 WORKOVER PROGRAM (129 WELLS) 7 WELLS 15 WELLS 15 WELLS 15 WELLS 15 WELLS § The initial pr

  8. Slide 8: KayJay Pipeline Project

    KayJay Pipeline Project One of several small, self funded projects that the company is undertaking § 31 wells – Offline since 2016 Delta Sales Point § Tying raw gas into existing sales channel (Delta) at -U$0.28 differential § 22,000’ pipeline being laid § Over 50% complete – expected completion Sep

  9. Slide 9: Driving Top Line Growth & Improving Margins

    Driving Top Line Growth & Improving Margins CHALLENGE / INITIATIVE ISSUE & APPROACH STATUS Ergon refinery operating at 50% capacity for 60 days to date during the quarter. We REFINERY SHUT-INS have established a backup sales point and procured our own transport vehicles to Reducing mitigate this ris

  10. Slide 10: Our Business Model

    Our Business Model ACQUIRE ENHANCE PRODUCE LOW COST, LOW LOW COST, COST RIGOROUS FIELD OPPORTUNISTIC EE & WELL OPPORTUNISTIC WORKOVERS E DEVELOPMENT ACQUISITIONS ACQISITIONS ENHANCEMENT PLANNING • Neglected assets • Extreme cost discipline • Optimized & efficient and CAPEX gating production • Buildi

  11. Slide 11: AXP Energy Limited

    AXP ENERGY LIMITED www.axpenergy.com USA HEADQUARTERS AUSTRALIAN OFFICE SIMON JOHNSON Suite 120 Suite 302, Level 3 Non-Executive Chairman 120 Prosperous Place 17 Castlereagh +61 (0)417 478 818 Lexington, Kentucky 40509 Sydney NSW 2000 USA AUSTRALIA SAM JARVIS Non-Executive Director +1 (859) 263 3948

  12. Slide 12: Thank You

    ~ £ ZA \ ~ < = —

AXP Energy — Q2 2021 Earnings Presentation on 6ix