BlackPearl Resources — Peters & Co. Energy Conference 2014
25 slides from BlackPearl Resources's conference presentation, September 2014

Slide 1: Peters & Co. Energy Conference September 9–11, 2014
PETERS & CO. ENERGY CONFERENCE SEPTEMBER 9 – 11, 2014

Slide 2: Disclaimer
Disclaimer FORWARD-LOOKING STATEMENTS: This presentation contains certain forward-looking statements and forward-looking information (collectively referred to as "forward-looking statements") within the meaning of applicable Canadian securities laws. All statements other than statements of historica

Slide 3: Company Overview
Yo Black Company Overview

Slide 4: Corporate Profile
Corporate Profile Common shares • Market Cap • $0.75 billion • Shares Outstanding • Basic • 336 million • Fully Diluted • 355 million • Average Trading Volume (3 months) • 655,000 Properties • 3 Core Areas • All Heavy oil and oil sands Athabasca Blackrod Peace • Potential to increase production 10x

Slide 5: Key Considerations
Key Considerations - Currently producing ≈9,000 b/d Existing Production - Production from all three core areas - Generates $80 - $100 mm in annual cash flow - Management owns 9.4% of the Company (10.7% Committed Management Team on a fully diluted basis) - 20+ years experience as a technical team in

Slide 6: Development Stages
Development Stages First five years (2009 – 2014) Production (bbl/d) • Grew conventional production from 5,000 to 10,000 b/d 10,000 • Developed a base of cashflow to tackle larger projects 8,000 • Laid the foundation for the next stage of growth – thermal 6,000 • Undertook pilots on both our thermal

Slide 7: Operations Overview
Yo Black Operations Overview

Slide 8: BlackPearl's Operating Philosophy
BlackPearl’s Operating Philosophy Common characteristics of BlackPearl’s core assets Proven development and exploitation model Identify Onion Lake Mooney Blackrod Land capture and delineate reserve / resource Validate Test, optimize and pilot Exploitable Significant High working with proven resource

Slide 9: Onion Lake – Conventional Development
Onion Lake – Conventional Development Key Metrics Onion Lake Area Map Production Oil quality Regulatory stage Current (1) Potential (2) 2P reserves (3) 2C resources (3) (°API) (boe/d) (boe/d) (mmboe) (mmboe) 11 Approved 3,915 5,000 10.5 1.5 • Well-delineated • over 300 wells drilled to date • Signif

Slide 10: Onion Lake – Thermal EOR Development
Onion Lake – Thermal EOR Development Key Metrics Regional analogue map Production Oil quality Regulatory stage Current Potential (1) 2P reserves (2) 2C resources (2) (°API) (boe/d) (boe/d) (mmboe) (mmboe) 11 Approved 0 12,000 80 28 BlackPearl Onion Lake • Net pay in the Lower Cummings Formation on a

Slide 11: Onion Lake – Thermal EOR Development (cont'd)
Onion Lake – Thermal EOR Development (cont’d) Comparison 1 – Lashburn Comparison 2 – Tangleflags • Producing since the late 1980s, with SOR of 3.0 – 4.0 • Currently producing 9,800 boe/d, with SOR of ~ 2.3 • Projected eventual recovery of 70% of the OOIP Lashburn (Pikes Peak South) Overview (1) Tang

Slide 12: Onion Lake – Thermal EOR Development (cont'd)
Onion Lake – Thermal EOR Development (cont’d) Development Plan Phased Thermal Development at Onion Lake • Phase 1 of commercial development is under construction • Modified SAGD process – utilize existing infrastructure • 6,000 b/d design • 12 HZ producers, 19 new vertical injectors, up to 16 existi

Slide 13: Mooney – Alkali Surfactant Polymer (ASP) Flood
Mooney – Alkali Surfactant Polymer (ASP) Flood Overview Key Metrics • Key to unlocking upside value has been the Production Oil quality Regulatory stage Current Potential (2) 2P reserves (5) 2C resources (5) implementation of an ASP(1) (polymer) flood (°API) (boe/d) (boe/d) (mmboe) (mmboe) 16 Approv

Slide 14: Mooney – Expansion of ASP Flood
Mooney – Expansion of ASP Flood Mooney Detailed Area Map Phase 3 Phase 2 Phase 1 Phase 2 Company Lands Company Wells 1 mile Future Future Area Wells Development Development Expansion Plans • Phase 2 • Drilled two wells in Q1 2014 to complete ASP flood pattern • Plan to expand ASP flood to these land

Slide 15: Blackrod – SAGD Oil Sands Project
Blackrod – SAGD Oil Sands Project Key Metrics Blackrod Area Map Stage of Oil Reg. Current Potential 2P 2C Qualty Approval Prod. (1) Prod. Reserves (2) Resources (2) [ °API ] [bbl/d] [bbl/d] [mmbbl] [mmbbl] 9 Filed 306 80,000 182 566 • Located in the Athabasca Oil Sands region • Lower Grand Rapids Fo

Slide 16: Blackrod – SAGD Pilot Progress
Blackrod – SAGD Pilot Progress BlackRod Second Pilot SAGD Well Pair First Pilot Well Pair • Produced >240,000 barrels of oil to date 600.0 14 • Reached production rates of 400 bbl/day, iSOR ~3 • Confirmed the SAGD process works in this reservoir 12 500.0 • Tested alternative production techniques to

Slide 17: Blackrod – Commercial Development
Blackrod – Commercial Development Overview Phased Development at Blackrod • 80,000 bbl/d commercial development application filed in Q2 2012 1 mile • Application approval expected in 2014 • Project to be built in phases, with the first phase planned for 20,000 bbl/d; two additional phases of 30,000

Slide 18: Financial Summary
Yo Black Financial Summary

Slide 19: Conservative Financial Policies
Conservative Financial Policies • Ensure material development projects are fully funded at the outset • Maintain prudent mix of debt and equity • Target Debt to EBITDA of 1.0x – 1.5x over the longer term • While BlackPearl has historically been unhedged, we have begun to hedge a portion of our oil p

Slide 20: Balance Sheet Strength
Balance Sheet Strength Funding Sources Funding our Projects ($ millions) 06/30/14 Onion Lake Thermal • Phase 1 of the project is under construction Unutilized Credit Facilities 150 and is fully funded through a combination of Working Capital 22 equity, bank lines and cash flow • Phase 2 of 6,000 bbl

Slide 21: 2014 Guidance
2014 Guidance 2014 Estimates(1) 2014 Capital Spending John Lake Blackrod Average Production (boe/d) 9,000-9,500 Other 3% 2% Onion Lake 4% Funds flow from operations ($ millions) 80-85 Primary 7% Capital expenditures ($ millions) 280-300 Year-end debt ($ millions) 130-140 Mooney Year-end working capi

Slide 22: Managing Heavy Oil Differentials
Managing Heavy Oil Differentials Risk Management(1) • Volatility in Heavy Oil Prices • WTI/WCS differentials range from 14% - 40% in 2013 • Differentials 20 – 25% in 2014 (YTD) • Expansion of rail transportation, together with refining and Unhedged Hedged pipeline expansions has reduced volatility i

Slide 23: Attractive Valuation
Attractive Valuation $14.00 $12.00 • Shares are currently trading at 1P valuation, no value assigned to our probable reserves $10.00 Contingent and contingent resources Resource $8.00 • Current share price attributes no value to Per Share $6.00 our Blackrod SAGD project and less than 25% of our Onio

Slide 24: Junior Oil Sands – How are we Different
Junior Oil Sands – How are we Different BlackPearl is a Canadian heavy oil / oil sands producer with a combination of investment attributes that make it a unique opportunity: 1. Experienced management team that has successfully built, Peace Athabasca Blackrod operated and sold significant heavy oil

Slide 25: Key Milestones – Next 12 to 18 Months
Key Milestones – Next 12 to 18 Months 2P Reserves (mmbbl) • Regulatory approval for first 20,000 bbl/day phase at Blackrod 300 250 • Development financing decisions for our 200 Blackrod thermal project 150 100 • Expansion of the ASP flood at Mooney 50 0 • First oil from Phase 1 of the Onion Lake 200
Source: Internet Archive copy of blackpearlresources.ca
More decks from BlackPearl Resources Inc
Investor Presentation (April 2018)24 slides · April 2018
Investor Presentation (September 2017)22 slides · September 2017
Shareholder Meeting (May 2017)25 slides · May 4, 2017
Corporate Update (March 2016)22 slides · March 2016
Investor Presentation (September 2015)23 slides · September 2015
Investor Presentation (February 2015)26 slides · February 2015