BlackPearl Resources Inc

BlackPearl Resources — Shareholder Meeting (May 2017)

25 slides from BlackPearl Resources's shareholder meeting presentation, May 4, 2017

  1. Slide 1: Annual and Special Meeting of Shareholders, May 4, 2017

    Slide 1: Annual and Special Meeting of Shareholders, May 4, 2017

    ANNUAL AND SPECIAL MEETING OF SHAREHOLDERS MAY 4, 2017

  2. Slide 2: Advisory

    Slide 2: Advisory

    Advisory FORWARD-LOOKING STATEMENTS: This presentation contains certain forward-looking statements and forward-looking information (collectively referred to as "forward-looking statements") within the meaning of applicable Canadian securities laws. All statements other than statements of historical

  3. Slide 3: Company Overview

    Slide 3: Company Overview

    Company Overview THE BASICS Corporate Symbol: PXX, PXXS o Our focus is heavy oil and oil sands Exchanges: TSX, OMX o Exposure to long life low decline reserves Shares Outstanding (MM) (1) Basic 336 o Significant management ownership Fully Diluted 366 o Fiscally disciplined with a strong balance shee

  4. Slide 4: The Transition to Thermal

    Slide 4: The Transition to Thermal

    The Transition to Thermal o Our long term strategy has always been to transition the Company from a conventional heavy oil operator to a major thermal heavy oil producer o With the success of Phase 1 and the sanctioning of Phase 2 of our Onion Lake Thermal project and the success of our Blackrod SAG

  5. Slide 5: Why the shift to Thermal?

    Slide 5: Why the shift to Thermal?

    Why the shift to Thermal? o Long life, low decline assets o At 12,000 b/d our 2P reserve life at Onion Lake is 25 yrs o Top quartile economics o Cash break-even of ≈C$27/bbl o Low sustaining capital requirements and lower operating costs 2016 Operating Costs $20 $15 $10 $5 $0 Conventional OL Thermal

  6. Slide 6: 2016 Reserve and Contingent Resource - Summary

    Slide 6: 2016 Reserve and Contingent Resource - Summary

    2016 Reserve and Contingent Resource - Summary o 6% increase in 2P reserves year over year Volume BT PV10% (MMboe) ($ mm) o Reserves added at Onion Lake o 2P reserve value is equivalent to ≈$6/sh 2P Reserves (1) 312 2,055 o 2C risked contingent resource value is 2C Contingent Resources (1) 499 1,103

  7. Slide 7: Three Core Properties

    Slide 7: Three Core Properties

    Three Core Properties CORE PROPERTIES o All are in heavy oil and oil sands regions o All projects have been delineated and Blackrod Athabasca (SAGD) Peace piloted River o All projects employ proven technologies: Cold Lake primary (“CHOPS”), tertiary (polymer flood) and thermal recovery methods Moone

  8. Slide 8: Operations Review

    Slide 8: Operations Review

    jc es ic? e ees ee rs eo. OPERATIONS REVIEW pa eae BlackPear! Resources Inc.

  9. Slide 9: Onion Lake - Primary

    Slide 9: Onion Lake - Primary

    Onion Lake - Primary THE BASICS o Active in the region since 2006 o Over 300 wells drilled o Expect initial production of 40 – 60 b/d o Expect 40,000 – 80,000 bbls per well o Capex of ≈$0.45 mm per well CURRENT STATUS o Producing ≈2,000 b/d o ≈500 b/d shut-in due to low oil prices o 2P reserves of 5

  10. Slide 10: Onion Lake - Thermal

    Slide 10: Onion Lake - Thermal

    Onion Lake - Thermal PHASE 1 (6,000 b/d) o Producing ≈6,100 b/d o ISOR ≈2.5 PHASE 2 (an additional 6,000 b/d) o Sanctioned in February 2017 Thermal o 12 to 15 month construction period; followed by 9 to Development 12 month production ramp-up Area o Construction completion targeted for mid 2018 o Fi

  11. Slide 11: Onion Lake - Thermal

    Slide 11: Onion Lake - Thermal

    Onion Lake - Thermal Onion Lk Phase 1 Thermal Production Ramp-Up (bbl/d) 7000 6000 5000 4000 Facility turnaround & inspection 3000 2000 Initial steam injection 1000 0 11

  12. Slide 12: Onion Lake - Thermal

    Slide 12: Onion Lake - Thermal

    Onion Lake - Thermal THERMAL DEVELOPMENT AREA DELINEATED o 197 existing delineation wells in the thermal development area o ≈90% 3D seismic coverage THERMAL DEVELOPMENT PLAN IN PLACE o Phase 1 - 13 horizontal production wells o Phase 2 - 14 horizontal producer locations o 70 to 100 sustaining produc

  13. Slide 13: Onion Lake – Thermal Phase 2 Construction Schedule

    Slide 13: Onion Lake – Thermal Phase 2 Construction Schedule

    Onion Lake – Thermal Phase 2 Construction Schedule 2016 2017 2018 Oct Nov Dec Jan Feb Mar Apr May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May June CPF Module Fabrication Wellpad Module Fabrication AGP Engineering Wellpad Engineering CPF Clearing CPF Mechanical Construction Drilling AGP Constr

  14. Slide 14: Onion Lake - Thermal

    Slide 14: Onion Lake - Thermal

    Onion Lake - Thermal ECONOMICS ESTIMATED OPERATING INCOME(1)(2) ($mm/yr) o Royalties of ≈11% (pre-payout) $200 o Operating (including energy) and $150 transportation costs of ≈$10 – 15/bbl $100 o Total capital of $8 – 10/bbl, including sustaining capital of $4 – 5/bbl $50 $0 o Break-even wellhead pr

  15. Slide 15: Blackrod SAGD - Overview

    Slide 15: Blackrod SAGD - Overview

    Blackrod SAGD - Overview THE BASICS Pilot Well Pair o Located in the Athabasca oil sands 700 14 o 100% owned and operated 600 12 o Grand Rapids reservoir 500 10 CURRENT STATUS 400 8 o Successful pilot operated since 2012 bw/bo b/d o Pilot well averaged 550 b/d over last 24 300 6 months with an avera

  16. Slide 16: Blackrod – Commercial Development

    Slide 16: Blackrod – Commercial Development

    Blackrod – Commercial Development COMMERCIAL o Received regulatory and environmental approval for 80,000 b/d commercial 1 mile development o Project to be built in phases, with the first phase planned for 20,000 b/d o Phase 1 capital cost estimate of Working Interest Lands ≈$800mm ($37,500 – $42,500

  17. Slide 17: Mooney - ASP Flood

    Slide 17: Mooney - ASP Flood

    Mooney - ASP Flood THE BASICS Phases 3 & 4 Phase 2 o Bluesky reservoir Phase 1 Phase 2 o Drilled over 90 horizontal wells o Phase 1 of the ASP flood initiated in 2011; production increased from 300 to >2,000 boe/d o Recoveries expected to go from 5% to 25-30% o 40+ year project life 1 mile CURRENT S

  18. Slide 18: Comparative SOR Performance

    Slide 18: Comparative SOR Performance

    Comparative SOR Performance Last 12 Months Trailing SOR (March 2016 - February 2017) *instantaneous SOR presented for newer projects still in ramp-up phase 7.0 1st quartile 2nd quartile 3rd quartile 4th quartile 6.0 5.0 4.0 3.0 5.8 6.0 6.1 5.4 5.0 5.1 4.7 4.8 4.4 4.5 4.2 2.0 4.0 3.7 3.1 3.1 3.3 2.8

  19. Slide 19: Financial Review

    Slide 19: Financial Review

    FINANCIAL REVIEW @ BlackPear! Resources Inc. >

  20. Slide 20: 2016 Financial Highlights

    Slide 20: 2016 Financial Highlights

    2016 Financial Highlights Operating Costs - $/boe $30.00 o 21% increase in production $20.00 o Exceeded 2016 guidance 21% 38% $25.24 o Onion Lake thermal production $10.00 $19.94 $12.44 exceeded design capacity $0.00 2014 2015 2016 o Improved operating efficiencies G & A Costs - $/boe o Responsive t

  21. Slide 21: 2017 Outlook

    Slide 21: 2017 Outlook

    2017 Outlook o Our primary focus in 2017 is thermal 2016 2017E(1) expansion at Onion Lake Average production (boe/d) 10,077 10 – 11,000 o Best economics of all our projects Capital expenditures ($MM) 11 190 o Development to be funded from cash Funds flow ($MM) 45 55 - 60 flow, bank and subordinated

  22. Slide 22: 2017 Development Plan

    Slide 22: 2017 Development Plan

    2017 Development Plan CAPITAL SPENDING ($ mm) THE PLAN 5.0 3.5 3.52.0 o 2017 capital spending will be Onion Thermal dominated by the expansion of the John Lake Onion Lake thermal project o Includes phase 2 expansion of Onion Primary $185 mm and phase 1 sustaining capital of $35 mm to be spent over M

  23. Slide 23: Strong Financial Position

    Slide 23: Strong Financial Position

    Strong Financial Position 18 Month Requirements ($ mm) o Strong balance sheet Non Discretionary Discretionary o Debt free at year-end 2016 Capital Other Expenditure Onion Lake Expansion $180 $40 o Bank credit facilities of $117.5mm Onion Lake Thermal Maintenance $30 o Plan to supplement bank debt Fu

  24. Slide 24: Hedging Program

    Slide 24: Hedging Program

    Hedging Program Volumes Hedged Using Swaps and Collars (1)(3) o We use oil hedging to mitigate price 6000 volatility to support capital program and 5000 ≈42% hedged ≈45% hedged debt repayment 4000 C$40.00 WCS Floor Collar o $37 mm realized on hedging in 2015; (b/d) C$52.38 3000 C$51.10 WCS $11 mm re

  25. Slide 25: Key Takeaways

    Slide 25: Key Takeaways

    Key Takeaways o Transition to long life, low decline thermal production o Phase 2 thermal development at Onion Lake o Initiate commercial development at Blackrod o Estimated $6/share of reserve value and $3/share of risked contingent resource value (1) o All of our projects have been delineated, pil

Source: Internet Archive copy of blackpearlresources.ca

More decks from BlackPearl Resources Inc