Slide 1: Targeting 100% On-Site Processing by Q2 2021
TARGETING 100% ON-SITE PROCESSING BY Q2 2021 FEBRUARY 2021 consolidatedzinc.com.au |
Slide 2: Important Information
IMPORTANT INFORMATION FORWARD-LOOKING STATEMENTS AND INFORMATION There is a low level of geological confidence associated with Inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of indicated This report contains forward looking stateme
Slide 3: Investment Highlights
INVESTMENT HIGHLIGHTS Wholly owned Plant upgrade from Zinc Concentrate Focussed on Driving Successfully transitioned to Plomosas 100tpd to 200tpd offtake agreement reducing material shareholder owner operating Processing Plant possible for with Penoles stockpiles on value through mining - refurbishm
Slide 4: Corporate Overview
CORPORATE OVERVIEW CAPITAL STRUCTURE (PRO-FORMA POST FEBRUARY 2021 PLACEMENT) Share price (Placement Price) A$0.04 100% CONSOLIDATED ZINC LTD Market Capitalisation A$12.1M Shares on Issue 301.4m Quoted Options on Issue 68.1m Unquoted Options/Performance Rights 7.8m MINERA LATIN 100% Cash, Accounts R
Slide 5: Plomosas Mine, Mexico
PLOMOSAS MINE, MEXICO consolidatedzinc.com.au |
Slide 6: Plomosas Mine Operations
PLOMOSAS MINE OPERATIONS • Owner operator mining commenced in 2020 resulting in mine operating costs halving year on year $120/t v $55/t. • Current stockpiles exceed 3,000t. • Plan to reduce stockpiles by end Q2 CY2021. • Pumping rates increased to allow access to high grade zones. • Mine infrastruc
Slide 7: Plomosas Mine Layout
PLOMOSAS MINE LAYOUT Extensive underground access to 400 400m metres below surface (mbs) - in good condition for mining and exploration drilling Haulage via decline capacity up to 350t/d Stoping progressing on Level 5, Level 7, Level 9 in the main orebody Las Espada and Tres Amigos 9 Stopes opened f
Slide 8: Plomosas Plant Refurbishment
PLOMOSAS PLANT REFURBISHMENT • Wholly owned Plomosas processing plant refurbishment • On track to commence commissioning during February 2021 • Refurbished to 100tpd, ball mill capacity 200tpd, upgrade for minimal capex targeted in late 2021 • Major works completed: • Crushing circuit refit complete
Slide 9: Plomosas Plant – Designed for Improved Performance
PLOMOSAS PLANT – DESIGNED FOR IMPROVED PERFORMANCE • Plant recoveries at Aldama have improved to 75% on Zinc and 50% Lead • Plomosas plant designed for Plomosas ore – improvements expected • Constant quality mine water should improve plant performance • Larger mill rated at 300tpd at grind size of <
Slide 10: Plomosas Offtake Agreements
PLOMOSAS OFFTAKE AGREEMENTS • Plomosas zinc concentrates are high quality and free of any deleterious elements • Zinc Concentrate Offtake Agreement executed with Met-Mex smelter, owned by Penoles a major Latin American resources company and one of the world’s leading refiners of zinc and the largest
Slide 11: Exploration - Base Metal and Gold
EXPLORATION - BASE METAL AND GOLD Base Metal Exploration Gold exploration sites • Targets generated along strike and down dip • Recent surface mapping has resulted in a rethink of the orientation of the base metals Gold Exploration • Field work and drilling recently completed • Primary targets Enriq
Slide 12: Mine Sequence Base Metal Exploration Targets
MINE SEQUENCE BASE METAL EXPLORATION TARGETS STRATIGRAPHY OF MINE MINERALISED SEQUENCE MINE SEQUENCE WITHIN TENEMENTS SHOWING PROSPECTIVE (BLUE SHOWS IDENTIFIED CARBONATE UNITS) STRATIGRAPHY, STRUCTURES AND TARGETS. consolidatedzinc.com.au |
Slide 13: Social Responsibility
SOCIAL RESPONSIBILITY CZL HAS UNDERTAKEN ACTIVITIES IN: Providing water to long-term residents in the Chihuahua Desert Assisting with waste management for local community Falomir Maintaining the access road Sustainable projects with Falomir mayor Supporting local ranchers CZL IS WORKING WITH LOCAL G
Slide 14: JORC (2012) Mineral Resource as Depleted December 2019
JORC (2012) MINERAL RESOURCE AS DEPLETED DECEMBER 2019 Indicated Mineral Resource Prospect Tonnes %Zn %Pb g/t Ag Zn tonnes Pb tonnes Ag oz Level 7 107,000 19.7 9.5 557.7 17,000 8,000 157,000 Tres Amigos 42,000 7.7 2.3 12.0 3,000 1,000 16,000 Tres Amigos North 38,000 7.8 3.6 13.1 3,000 1,000 16,000 S