Yari Minerals Limited · ASX:YAR
Yari Minerals — Yari Resources — Investor Presentation (November 2026)
16 slides from Yari Minerals's investor presentation, Nov 18, 2026
Slide 1: November 2026 Investor Presentation (ASX announcement)
ASX ANNOUNCEMENT | 18 November 2026 November 2026 Investor Presentation Yari Resources Limited (ASX: YAR) has released an updated investor presentation, highlighting the Company’s district-scale al use only consolidation strategy in Queensland’s Bowen Basin and its 505Mt combined coal resource posit
Slide 2: Unlocking District-Scale Value in the Bowen Basin
Unlocking District-Scale al use only Value in the Bowen Basin 505Mt of Bowen Basin coal at ~0.6c per resource tonne A Bowen Basin coal consolidation and development strategy Investor Presentation | November 2026 ASX: YAR
Slide 3: Investment Snapshot: Why YAR, Why Now
Investment Snapshot: Why YAR, Why Now 505Mt 198Mt 6.4x ~0.6c/t ~40km Resource growth JORC coal resource Indicated resource Road to rail loadout since Rolleston South EV per resource tonne Rolleston South + Arcadia from zero in January 2026 Gladstone export corridor acquisition, May 2025 al use only
Slide 4: Why Bowen Basin? Why Now?
Why Bowen Basin? Why Now? World Premier Coal District Queensland produced over 228Mt of saleable coal across 59 active mines in 2025, of which approximately 83% was produced in the Bowen Basin. The right address for a long-life coal asset. Sustained Global Demand al use only Global coal demand is at
Slide 5: Consolidation in a Proven Coal District
Consolidation in a Proven Coal District Consolidating a proven district Scale makes a multi-deposit Bowen Basin operation attractive to majors, partners and offtakers. Glencore Rolleston Foundation built 1,060Mt1 al use only 01 504.9Mt across Rolleston South and Arcadia, including 197.7Mt Indicated.
Slide 6: Resource Grown 6.4x to 504.9Mt in Months
Resource Grown 6.4x to 504.9Mt in 17 Months From single 79Mt project to a two-project, 505Mt district position Indicated Inferred 6.4x Resource growth since acquisition 78.9Mt (May 2025) to 504.9Mt 504.9Mt al use only 197.7Mt Indicated Resource from zero in January 2026 307.2 222.9Mt 190.1Mt 282.0Mt
Slide 7: Rolleston South: Shallow, Low-Ash Coal Beside Glencore
Rolleston South: Shallow, Low-Ash Coal Beside Glencore 222.9Mt ~40km JORC Coal Resource Sealed road to Blackwater al use only 33.7Mt 0.35% Indicated Resource Total sulphur · 7–8% ash product • 100% owned: EPC 2318 and 2327; six shallow Bandanna Formation seams (X, A–E), 1–6m thick • Export-quality p
Slide 8: Arcadia Acquired: Expanding the Rolleston District Position
Arcadia Acquired Expanding the Rolleston District Position 504.9Mt Combined District Position JORC 2012 — acquisition completed al use only Yari completed the acquisition of 100% of Northern Comet Resources Company, holder of the Arcadia Coal Project, on 20 October 2026. Arcadia adds 282.0Mt (164.0M
Slide 9: Coal Quality Supports Multiple Product Pathways
Coal Quality Supports Multiple Product Pathways Independent Experts results point to low-ash coal with semi-soft coking, PCI and high-energy thermal potential Arcadia Rolleston South NEWC Parameter ASX, 7 Sep 2026 ASX, 3 Mar 2026 benchmark al use only Ash ~10% 7–8% ≤14% in-situ average product at ~8
Slide 10: Route to Market: Established Corridor to Gladstone
Route to Market: Established Corridor to Gladstone Mine Road / conveyor Rail loadout Blackwater rail Gladstone port Asian markets Rolleston South RS ~40km road Neighbour loop or Electrified rail Established coal Seaborne buyers Arcadia Arcadia road/conveyor new shared loadout ~400km to port export t
Slide 11: Peers trade at 48–72c per tonne; YAR at ~0.6c
Peers trade at 48–72c per tonne; YAR at ~0.6c EV per JORC resource tonne, attributable, A cents What closes the gap 1. Convert Inferred to Indicated tonnes Jameson 72.0c 2. Product testwork confirms export-grade coal al use only 3. Scoping study Cokal 71.0c 4. MDL / mining lease pathway 5. Offtake L
Slide 12: Board and Technical Team
Board and Technical Team BOARD Eduardo Robaina Courtney Taylor Albert Thamm Non-Executive Chair Managing Director Technical Director al use only Managing Director and engineering consultant Coal geologist with senior technical and Geologist with 35+ years in exploration, project with 20+ years’ exec
Slide 13: Growing Engagement Across the Rolleston District
Growing Engagement Across the Rolleston District Local Activity Glencore's recent MDL application near Yari's tenure signals growing industry interest in the district. al use only JV Discussions Early-stage discussions under way with strategic partners on a potential joint venture to develop the Rol
Slide 14: Important Notices and Disclaimer
Important Notices and Disclaimer Forward-Looking Statements: This presentation contains forward-looking statements based on assumptions and judgments of management regarding future events and results. Such statements involve known and unknown risks, uncertainties, and other factors which may cause a
Slide 15: Appendix | Capital Structure and Valuation
Appendix 1 | Capital Structure and Valuation 1.476B A$2.2M ~A$4.4M 0.59¢/t Market cap at A$0.003 (26 Oct Shares on issue Placement proceeds Implied EV per resource tonne 2026 close) al use only Item Current Basis Investor relevance Ordinary shares 1,475,644,105 October 2026 ASX securities disclosure
Slide 16: Appendix | JORC2012 Coal Resources
Appendix 2 | JORC2012 Coal Resources Project Interest Indicated (Mt) Inferred (Mt) Total (Mt) Source announcement Rolleston South 100% 33.7 189.2 222.9 ASX, 2 February 2026 al use only Arcadia 100%1 164.0 118.0 282.0 ASX, 3 and 7 August 2026 Total 197.7 307.2 504.9 Notes: Reported in accordance with
Yari Resources — Investor Presentation (November 2026) on 6ix