P2 Gold Inc. · TSXV:PGLD
P2 Gold — Corporate Update (November 2020)
7 slides from P2 Gold's corporate update, Nov 30, 2020
Slide 1: Todd Creek 2020 Exploration Program Drill Results
TSX-V: PGLD Todd Creek 2020 Exploration Program Drill Results November 30, 2020
Slide 2: Cautionary Statement
Cautionary Statement Forward-LookingInformation This presentation contains "forward-looking information” within the meaning of applicable securities laws that is intended to be covered by the safe harbours created by those laws. “Forward-looking information” includes statements that use forward-look
Slide 3: About P2 Gold Inc. (TSX-V: PGLD)
About P2 Gold Inc. (TSX-V: PGLD) ▪ P2 launched in 2020 to advance precious metal opportunities in Pacific Northwest ▪ Experienced management team ▪ Five Grassroots projects • Exploration programs completed on BC properties – with drill programs on two • Exploration programs underway/planned for Oreg
Slide 4: Todd Creek: Yellow Bowl 2020 Exploration Program Drill Results
Todd Creek: Yellow Bowl 2020 Exploration Program Drill Results(1) • Drilling targeted structurally hosted copper/gold mineralization within large, intense QSP alteration zone 3.3 m @ 3.03 % Cu, 0.2 gpt Au, • Structural mineralization 7.1 gpt Ag associated with weak to moderate airborne EM anomalies
Slide 5: Yellow Bowl Hole Cross Section A-A'
Todd Creek: Yellow Bowl 2020 Exploration Program Drill Hole Cross Section A-A’(1) A 8.8 m @ 0.51 % Cu, 10.6 gpt Ag A’ A’ Incl. 1.2 m @ 1.48% Cu, 30.6 Ag Surface sample locations A PLAN VIEW OF YELLOW BOWL TARGET 3.3 m @ 3.03 % Cu, 0.2 gpt Au, 7.1 gpt Ag DRILL HOLES TC-001 AND TC-002 LOOKING NORTHWES
Slide 6: Todd Creek: VMS Zone 2020 Exploration Program Drill Results
Todd Creek: VMS Zone 2020 Exploration Program Drill Results(1) • Drilling targeted structurally hosted copper/gold mineralization 5.6 m @ 0.45 % Cu incl. 1.0 m@ 1.0 % Cu • Drilling showed that the mineralization has good continuity to depth • TC-003 intersected the mineralization within relatively u
Slide 7: VMS Zone Hole Cross Section A-A'
Todd Creek: VMS Zone 2020 Exploration Program Drill Hole Cross Section A-A’(1) A’ A Surface sample locations A’ Rock Type 5.6 m @ 0.45 % Cu Andesite Basalt A incl. 1.0 m@ 1.0 % Cu Dacite Rhyolite PLAN VIEW OF VMS WEST TARGET DRILL HOLE TC-003 Cu (ppm) LOOKING NORTHWEST • Future plans: test the vein