Unimit Engineering Public Co., Ltd. · SET:UEC
Unimit Engineering Public — Investor Presentation (February 2016)
74 slides from Unimit Engineering Public's investor presentation, Feb 13, 2016
Slide 1: Unimit Engineering Public Company Limited
' enne"nrn Un.lrn.i.\ ~n9,lneeri_nQ P-u.bl.i.~ C2Qmpa11~ ~rn_lteq- l·"~l IS(fb 90Q1 :-2(!t(l§!J tSCfb 14Q9.ltt:-2QQ4, QHSAS 16QQ1:200~. y, ua, .~ ,artd IR SJ.~MP J -.... J>-1 ,. • r·. ......__..,,,~,_.._.. 13 February 2016 1
Slide 2: Agenda
01 Company information Company information 02 Business segment Business segment 03 Organization, Manpower Organization, Manpower and Capacity and Capacity 04 Equipment and Equipment and Certificates Certificates 05 Location Location 06 Client Client &&end enduser user listlist 13 February 2016 2
Slide 3: Company information
01 Company information Established: April 21, 1982 Capital: THB 143 Million Registered STOCK TICKER: “UEC” (MAI* Market) since Nov 2005 Bangkok Office: Phrapradaeng, Samutprakran Factory I & II: Banbung, Chonburi Factory III: Nikom Pattana, Rayong Web site: www.unimit.com * Market for
Slide 4: Company history and milestones
Factory I complete Factory II was built on • Listed on MAI • Forbes Asia Top 200 • ISO 14001:2004 built in Banbung, 40 acres to house all stock market. “Best under a Billion” • ISO 3834-2:2005 Chonburi. productions. • Registered companies in Asia • OHSAS Capital increased • ISO 9001-2000 18001:2007
Slide 5: Revenue by year (Million THB)
2,000 1,830 1,800 1,600 1,642 1,616 1,400 1,370 Million THB 1,200 1,240 1,350 1,000 990 1,078 1,100 800 600 400 200 - 2008 2009 2010 2011 2012 2013 2014 2015 Year 2016 13 February 2016 5
Slide 6: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & end user list 13 February 2016 6
Slide 7: Business segment
02 Business segment 1. Pressure Vessel 2. Machinery Parts 3. Chemical Tanks 4. Structure Steel/Piping 5. Mechanical installation Equipment installation Storage tanks 9% 10% Machinery parts Steel structure 8% 1% Pressure vessel 72% 13 February 2016 7
Slide 8: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Stack and Diverters SILO Pipe Racks
Slide 9: Pressure vessel: tanks
16.4 ton Self support 4.3 to 10 ton Above ground installation Under ground installation 25.4 ton Wagon Tank 93 ton Bullet tank 13 February 2016 9
Slide 10: Storage tank project scope
6,000 M3 Site location: Scope of work and supply is design • Material procurement • Khon Kaen Terminal • Shop fabrication • Surat thani Terminal • Songkhla [4,000 m3] • site erection, Testing and commissioning 13 February 2016 10
Slide 11: Liquid argon vertical tank
Liquid Argl')n 31'J"fHl'l.U ~ l .. • 13 February 2016 Vertica l Tank LIN I L©X - 350,000 11 Litres
Slide 12: TPX Linear Alkyl Benzene project
ID 5,300 mm., 46,700 TL-TL mm., 311,55 ton End user / EPC: Thai Paraxylene Company Limited / Hyundai Engineering Company Limited Project name: TPX Linear Alkylk Benzene [Year 2013-2014] 13 February 2016 12
Slide 13: Emission Improvement and PSA-3 project
ID 3900/5700/2500 mm., 30,000 TL-TL mm., 122.55 ton End user / EPC: Thai Oil Public Company / Foster wheeler Project name: Emission Improvement and PSA-3 (Year 2011-2012) 13 February 2016 13
Slide 14: Byproduct Valued Added project
ID 5,000 mm., 60,100 TL-TL mm., 252.0 ton End user / EPC: PTT Global Chemical Public Company Limited / Chiyoda (Thailand) Ltd. and Toyo-Thai Corporation PLC. Project name: Byproduct Valued Added (BV Project) [Year 2011] 13 February 2016 14
Slide 15: TPX Expansion Phase II
ID 4,200 mm., 60,950 TL-TL mm., 244.10 ton End user: Thai Paraxylene Company limited Project name: TPX Expansion Phase II (Year 2011-2012) 13 February 2016 15
Slide 16: New Parallel C3 Train
ID 4,400 mm., 90,740 TL-TL mm.., End user: Thai OLEFINS Public Company Limited Project name: New Parallel C3 Train 13 February 2016 16
Slide 17: HP tanks and blow down tanks
Blow down tanks HP tanks Maximum thickness (experience): 160 mm. 2,500 ID 11,000 mm TL-TL, 146.53 ton. Material: Carbon steel SA 526 Gr.70, SA299 Gr.B IP/LP tanks 13 February 2016 17
Slide 18: Deaerators
Tray-type or cascade-type Spray-type Process design by STORK THERMEQ Netherlands Process design by Sterling Deaerator Company and Kansas City Deaerator Company 13 February 2016 18
Slide 19: Shell & tube heat exchanger
Waste Gas Fixed tube Tube Pre- type bundle Heat Shell & Tube Heat exchanger with Expansion WGPH - Year: 2010 Bellow Customer: SIPCHEM, Saudi Arabia 13 February 2016 19
Slide 20: Separators and drain tanks
Instrument gas filter Closed drain tank Test separator OD 42” TL-TL 36’ ID 2’35/8’ TL-TL 9’-81/8” OD 3’-6” TL-Tl 11’ Material SA516 Gr.70 Material Carbon steel SA106Gr.B Material SA516 Gr.70N 13 February 2016 20
Slide 21: Reactor
Reactor Reactor 13 February 2016 21
Slide 22: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Furnace Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Pipe Racks Stack and SILO installations
Slide 23: Furnace
Furnace Furnace PROJECT: I-PRO CAPL MANUFACTURING PROJECT: NSGT CGL MANUFACTURING OWNER/EPC: TATA India/ SANKYU OWNER/EPC: Nippon Steel / SANKYU 13 February 2016 23
Slide 24: Diverters
Diverters Project: DEIR ALI II 701 MW., Damascus, Syria Project MEGALOPOLIS, Unit V 811 MW., Greece 13 February 2016 24
Slide 25: Machinery Parts
Machinery Parr-ts Boiler Fan Casing: 13 February 2016 25
Slide 26: Boiler fan casing, rotors and static parts
Buyer : Prony Australia Boiler Fan Casing, Rotors & Static Parts Buyer: Alcan Grove Australia 26 13 February 2016
Slide 27: Wind tunnel
Wind Tunnel PROJECT: BMW AVZ WIND TUNNEL FANS for HOWDEN GERMANY: Year 2006 13 February 2016 27
Slide 28: Stack
Stack PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 13 February 2016 28
Slide 29: Stack (continue)
Stack (continue) PROJECT: IRPC Fuel Gas Stack, Thailand Purchaser Zeeco, Inc. year 2013 13 February 2016 29
Slide 30: Incinerator
Incinerator PROJECT: VCM 1 Equipment Replacement Owner: Thai Plastic and Chemical PLC.; year 2014 13 February 2016 30
Slide 31: Incinerator
Incinerator PROJECT: VCM 1 Equipment Replacement, Owner: Thai Plastic and Chemical PLC.; Year 2014 13 February 2016 31
Slide 32: Attrition & Homogenization Drum
Attrition & Homogenization Drum Owner: EURO Waste Engineering [2014] 13 February 2016 32
Slide 33: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S
Slide 34: 13 February 2016
13 February 2016 34
Slide 35: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S
Slide 36: Project: HDPE
PROJECT: HDPE 4 Total weight 2,350 tons year 2007 13 February 2016 36
Slide 37: Project: JRU Malaysia
PROJECT: JRU- Malaysia Total 521 tons Year: 2011 Contractor: Aibel 13 February 2016 37
Slide 38: Structure steel
Stliucture steel Project: ABBOS-04-500-0 CHINGUETTI M12 Contractor: ABB limited Year : 2004 13 February 2016 38
Slide 39: Pipe spools
Pipe spools PROJECT: JRU -Malaysia PROJECT: JRU -Malaysia 13 February 2016 39
Slide 40: Business segment
02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S
Slide 41: Equipment Installation
Cqu lpment InstaHatmon 13 February 2016 41
Slide 42: Equipment Installation
Equipment ~nstaUatlon 13 February 2016 42
Slide 43: Mechanical Installation
Mechanical Installation
Slide 44: Service and Maintenance
Serrv~ce and Ma~ntenanee 13 February 2016 44
Slide 45: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Environment, health & safety management and compliance 13 February 2016 45
Slide 46: Organization Manpower and Capacity
03 Organization Manpower and Capacity 13 February 2016 46
Slide 47: Manpower
Update 20 February 2016 Management/Admin 137 2 Permanent = 711 Temporary = 111 Engineers/supervisors 71 - Total = 822 Construction 6 /3 Formen/Technicians 128 2 QA/QC 67 - Welder 88 17 Fabrication 214 87 - 50 100 150 200 250 300 350 13 February 2016 47
Slide 48: Production capacity
• Vessels/Equipment: 14,000 ton/year • Steel Structures/Machinery Parts: 12,000 ton/year • Piping Fabrication: 100,000 Diameter inches per year • Vessels/Spherical Tanks Erection: 1,000 ton/year • Equipment Installation: 1,000 ton/year • Steel Structure Erection: 1,000 ton/year • Piping: 100,000 dia
Slide 49: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 13 February 2016 49
Slide 50: Plasma and gas cutting
Plasma Cutting: Thickness 0.5-38 mm. Work piece W 3 m. x L 15 m. Gas Cutting: Thickness 6-90 mm. 13 February 2016 50
Slide 51: Pressing capacity
Pressing Capacity Max. Force 900 Tons Max Load 1,500 Tons Column Span 6000 mm. (inside) Max 6 Meters Span 13 February 2016 51
Slide 52: Plate bending
Plate bending: Diameter of roller: 800 mm. (all 3 rollers) Capacity: 125 mm. (5”) x 3,675 mm Width. 13 February 2016 52
Slide 53: Automatic submerged arc welding
• Automatic Submerged Semi-Automatic Longitudinal Welding with Manipulator Self-Alignment Power Rolling Machine 13 February 2016 53
Slide 54: Cold forming machines
Cold forming machine: Max diameter: 6 m. Cold forming machine: Max diameter: 3.8 m. Max thickness: 40 mm. Max thickness: 22 mm. 13 February 2016 54
Slide 55: Vertical boring machine
Double Column Vertical Boring Machine Specification: 1 M Wide x 3 M Long x 300 mm Thickness capability 13 February 2016 55
Slide 56: High pressure test pump
High Pressure Test Pump - Output (max) 10,000 psi Vacuum pump w/ Booster E2M275 EH1200 - Rotary pump speed: 275 Flow (max) 668 sq. inch m3/hr. Booster pump speed: 1200m3/hr. 13 February 2016 56
Slide 57: Heat treatment furnaces
Capacity: 5.3 m.(W) x 5.3 m.(H) x 18.0 m.(L) 100 Tons Capacity: 4.5 m.(W) x 3.5 m.(H) x 6.5 m.(L) 50 – 60 Tons Up to 1,200 C degree (LPG-fired) Up to 1,200 C degree (LPG-fired) 13 February 2016 57
Slide 58: Blasting shop
Abrasive material: Grit Shop dimension: L 25 m. x W 13 m. x H 7 m. 13 February 2016 58
Slide 59: ISO Certificates
~so Certificates CERTIFICATE OF APPROVAL CERTIFICATE OF APPROVAL CERTIFICATE OF APPROVAL I his 1s to certify that the Occuoat1onal Health & Safety Ma'lagement System This 1s to cert ify that the Quality Management System of: This is to certify that the Environmental Management System of: of: Unimit
Slide 60: ASME Certificates of Authorization
~ CERTIFICATE OF ~ CERTIFICATE OF l,_Y AUTHORIZATION l,_Y AUTHORIZATION u U2 The named company is a uthorized by the American Society of Mechanical Engineers The named company is authorized by the American Society of Mechanical Engineers (ASME) for the scope of activity shown below in accordance wit
Slide 61: Certificate of Authorization
THE NATIONAL BOARD ~ CERTIFICATE OF BOILE R & OF PRESSUR E VESSEL I N S PECTORS Certificate of Authorization v s AUTHORIZATION ~:-;) The named company is authorized by the American Society of Mechanical Enginee rs (ASME) fo r the scope of activity shown below in accordance with the applicable rules
Slide 62: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 13 February 2016 62
Slide 63: Location
Locat~on BANGKOK ·- ·- Suvarnabhumi Airport BAN BUNG 7.i"C • T ..:;, I ""'' 0 ~&. UNIMIT ENGINEERING PUBLIC COMPANY LIMITED ~·· '}'o \l 9tJ J.~o--- ~ 11 ~ I ~ •f • C':.t•.,...U . [,~ I ,. 1 ~ft.......... Ml LAEM CHABANG ' I~ I• •"<) > i~~UNO ..,.,..... / PATTAYA "" Factory# 3 RAYO NG - - _ MAP TA PH
Slide 64: Plant Layout Factory 1 and 2
P~ant Layout f a1ctory 1 and 2 13 February 2016 64
Slide 65: Factory 1 layout
Width = 155 m. (Front View) Length = 428 m. Area = 71,200 sq.m. Canteen 13 February 2016 65
Slide 66: Factory 2 layout
Width = 270 m. Length = 645 m. Area = 123,216 sq.m. 13 February 2016 66
Slide 67: Plant Layout Factory 3
Plant Layout Factory 3
Slide 68: Factory 3 layout
Factory 3 Start Operate in Year 2009 Width = 83 m. Length = 48 m. Area = 38,400 sq.m. 13 February 2016 68
Slide 69: Agenda
01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 13 February 2016 69
Slide 70: ,,,n 1r1,,,, .... :: I "0 :\1 1• -:. . .,,,.fl . . .
,,,n 1r1,,,, .... :: I "0 :\1 1• -:. . .,,,.fl . . . .,. 13 February 2016 70
Slide 71: Client list
aibel • 1 1 <SlJvetcoaibel" ~ cfH91£JlP CllYDDA TOSHIBA ThyssenKrupp DAEWOO 13 February 2016 \!TJ\11<1-SHI\ IJD. 71
Slide 72: Petrochemical industry users
Userr) ( Petroche111ical Industry ) EB Bayer . . a •BASF ,---~ The Chemical Company 8 !tffBPRAXAIR • 13 February 2016 72
Slide 73: Other industry users
( o1ther /11dr1stry ) Chevron u~LJn ui~1n~[ns1~uu 1iirtn (unirsu) The Bangchak Petroleum Public Company Limited .,.. TATA TATA STEEL PT TEP Mubadala Petroleum 13 February 2016 73
Slide 74: 13 February 2016
13 February 2016 74
Unimit Engineering Public Company — Investor Presentation (February 2016) on 6ix