Unimit Engineering Public Co., Ltd. · SET:UEC

Unimit Engineering Public — Investor Presentation (February 2016)

74 slides from Unimit Engineering Public's investor presentation, Feb 13, 2016

  1. Slide 1: Unimit Engineering Public Company Limited

    ' enne"nrn Un.lrn.i.\ ~n9,lneeri_nQ P-u.bl.i.~ C2Qmpa11~ ~rn_lteq- l·"~l IS(fb 90Q1 :-2(!t(l§!J tSCfb 14Q9.ltt:-2QQ4, QHSAS 16QQ1:200~. y, ua, .~ ,artd IR SJ.~MP J -.... J>-1 ,. • r·. ......__..,,,~,_.._.. 13 February 2016 1

  2. Slide 2: Agenda

    01 Company information Company information 02 Business segment Business segment 03 Organization, Manpower Organization, Manpower and Capacity and Capacity 04 Equipment and Equipment and Certificates Certificates 05 Location Location 06 Client Client &&end enduser user listlist 13 February 2016 2

  3. Slide 3: Company information

    01 Company information  Established: April 21, 1982  Capital: THB 143 Million Registered  STOCK TICKER: “UEC” (MAI* Market) since Nov 2005  Bangkok Office: Phrapradaeng, Samutprakran  Factory I & II: Banbung, Chonburi  Factory III: Nikom Pattana, Rayong  Web site: www.unimit.com * Market for

  4. Slide 4: Company history and milestones

    Factory I complete Factory II was built on • Listed on MAI • Forbes Asia Top 200 • ISO 14001:2004 built in Banbung, 40 acres to house all stock market. “Best under a Billion” • ISO 3834-2:2005 Chonburi. productions. • Registered companies in Asia • OHSAS Capital increased • ISO 9001-2000 18001:2007

  5. Slide 5: Revenue by year (Million THB)

    2,000 1,830 1,800 1,600 1,642 1,616 1,400 1,370 Million THB 1,200 1,240 1,350 1,000 990 1,078 1,100 800 600 400 200 - 2008 2009 2010 2011 2012 2013 2014 2015 Year 2016 13 February 2016 5

  6. Slide 6: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & end user list 13 February 2016 6

  7. Slide 7: Business segment

    02 Business segment 1. Pressure Vessel 2. Machinery Parts 3. Chemical Tanks 4. Structure Steel/Piping 5. Mechanical installation Equipment installation Storage tanks 9% 10% Machinery parts Steel structure 8% 1% Pressure vessel 72% 13 February 2016 7

  8. Slide 8: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Stack and Diverters SILO Pipe Racks

  9. Slide 9: Pressure vessel: tanks

    16.4 ton Self support 4.3 to 10 ton Above ground installation Under ground installation 25.4 ton Wagon Tank 93 ton Bullet tank 13 February 2016 9

  10. Slide 10: Storage tank project scope

    6,000 M3 Site location: Scope of work and supply is design • Material procurement • Khon Kaen Terminal • Shop fabrication • Surat thani Terminal • Songkhla [4,000 m3] • site erection, Testing and commissioning 13 February 2016 10

  11. Slide 11: Liquid argon vertical tank

    Liquid Argl')n 31'J"fHl'l.U ~ l .. • 13 February 2016 Vertica l Tank LIN I L©X - 350,000 11 Litres

  12. Slide 12: TPX Linear Alkyl Benzene project

    ID 5,300 mm., 46,700 TL-TL mm., 311,55 ton End user / EPC: Thai Paraxylene Company Limited / Hyundai Engineering Company Limited Project name: TPX Linear Alkylk Benzene [Year 2013-2014] 13 February 2016 12

  13. Slide 13: Emission Improvement and PSA-3 project

    ID 3900/5700/2500 mm., 30,000 TL-TL mm., 122.55 ton End user / EPC: Thai Oil Public Company / Foster wheeler Project name: Emission Improvement and PSA-3 (Year 2011-2012) 13 February 2016 13

  14. Slide 14: Byproduct Valued Added project

    ID 5,000 mm., 60,100 TL-TL mm., 252.0 ton End user / EPC: PTT Global Chemical Public Company Limited / Chiyoda (Thailand) Ltd. and Toyo-Thai Corporation PLC. Project name: Byproduct Valued Added (BV Project) [Year 2011] 13 February 2016 14

  15. Slide 15: TPX Expansion Phase II

    ID 4,200 mm., 60,950 TL-TL mm., 244.10 ton End user: Thai Paraxylene Company limited Project name: TPX Expansion Phase II (Year 2011-2012) 13 February 2016 15

  16. Slide 16: New Parallel C3 Train

    ID 4,400 mm., 90,740 TL-TL mm.., End user: Thai OLEFINS Public Company Limited Project name: New Parallel C3 Train 13 February 2016 16

  17. Slide 17: HP tanks and blow down tanks

    Blow down tanks HP tanks Maximum thickness (experience): 160 mm. 2,500 ID 11,000 mm TL-TL, 146.53 ton. Material: Carbon steel SA 526 Gr.70, SA299 Gr.B IP/LP tanks 13 February 2016 17

  18. Slide 18: Deaerators

    Tray-type or cascade-type Spray-type Process design by STORK THERMEQ Netherlands Process design by Sterling Deaerator Company and Kansas City Deaerator Company 13 February 2016 18

  19. Slide 19: Shell & tube heat exchanger

    Waste Gas Fixed tube Tube Pre- type bundle Heat Shell & Tube Heat exchanger with Expansion WGPH - Year: 2010 Bellow Customer: SIPCHEM, Saudi Arabia 13 February 2016 19

  20. Slide 20: Separators and drain tanks

    Instrument gas filter Closed drain tank Test separator OD 42” TL-TL 36’ ID 2’35/8’ TL-TL 9’-81/8” OD 3’-6” TL-Tl 11’ Material SA516 Gr.70 Material Carbon steel SA106Gr.B Material SA516 Gr.70N 13 February 2016 20

  21. Slide 21: Reactor

    Reactor Reactor 13 February 2016 21

  22. Slide 22: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Furnace Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Cryogenic tanks Pipe Racks Stack and SILO installations

  23. Slide 23: Furnace

    Furnace Furnace PROJECT: I-PRO CAPL MANUFACTURING PROJECT: NSGT CGL MANUFACTURING OWNER/EPC: TATA India/ SANKYU OWNER/EPC: Nippon Steel / SANKYU 13 February 2016 23

  24. Slide 24: Diverters

    Diverters Project: DEIR ALI II 701 MW., Damascus, Syria Project MEGALOPOLIS, Unit V 811 MW., Greece 13 February 2016 24

  25. Slide 25: Machinery Parts

    Machinery Parr-ts Boiler Fan Casing: 13 February 2016 25

  26. Slide 26: Boiler fan casing, rotors and static parts

    Buyer : Prony Australia Boiler Fan Casing, Rotors & Static Parts Buyer: Alcan Grove Australia 26 13 February 2016

  27. Slide 27: Wind tunnel

    Wind Tunnel PROJECT: BMW AVZ WIND TUNNEL FANS for HOWDEN GERMANY: Year 2006 13 February 2016 27

  28. Slide 28: Stack

    Stack PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser PROJECT: IRPC Fuel Gas Stack, Thailand; Purchaser Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 Zeeco, Inc. year 2013 13 February 2016 28

  29. Slide 29: Stack (continue)

    Stack (continue) PROJECT: IRPC Fuel Gas Stack, Thailand Purchaser Zeeco, Inc. year 2013 13 February 2016 29

  30. Slide 30: Incinerator

    Incinerator PROJECT: VCM 1 Equipment Replacement Owner: Thai Plastic and Chemical PLC.; year 2014 13 February 2016 30

  31. Slide 31: Incinerator

    Incinerator PROJECT: VCM 1 Equipment Replacement, Owner: Thai Plastic and Chemical PLC.; Year 2014 13 February 2016 31

  32. Slide 32: Attrition & Homogenization Drum

    Attrition & Homogenization Drum Owner: EURO Waste Engineering [2014] 13 February 2016 32

  33. Slide 33: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S

  34. Slide 34: 13 February 2016

    13 February 2016 34

  35. Slide 35: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S

  36. Slide 36: Project: HDPE

    PROJECT: HDPE 4 Total weight 2,350 tons year 2007 13 February 2016 36

  37. Slide 37: Project: JRU Malaysia

    PROJECT: JRU- Malaysia Total 521 tons Year: 2011 Contractor: Aibel 13 February 2016 37

  38. Slide 38: Structure steel

    Stliucture steel Project: ABBOS-04-500-0 CHINGUETTI M12 Contractor: ABB limited Year : 2004 13 February 2016 38

  39. Slide 39: Pipe spools

    Pipe spools PROJECT: JRU -Malaysia PROJECT: JRU -Malaysia 13 February 2016 39

  40. Slide 40: Business segment

    02 Business segment Pressure Vessel Machinery Parts Chemical Tanks Structure Steel/Piping Mechanical installation LPG tanks Fan casing Oil tank Structures Tank installation Spherical tanks Wind tunnel Water tank Pipe Spools Equipment Pipe Racks installations Cryogenic tanks Stack and S

  41. Slide 41: Equipment Installation

    Cqu lpment InstaHatmon 13 February 2016 41

  42. Slide 42: Equipment Installation

    Equipment ~nstaUatlon 13 February 2016 42

  43. Slide 43: Mechanical Installation

    Mechanical Installation

  44. Slide 44: Service and Maintenance

    Serrv~ce and Ma~ntenanee 13 February 2016 44

  45. Slide 45: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Environment, health & safety management and compliance 13 February 2016 45

  46. Slide 46: Organization Manpower and Capacity

    03 Organization Manpower and Capacity 13 February 2016 46

  47. Slide 47: Manpower

    Update 20 February 2016 Management/Admin 137 2 Permanent = 711 Temporary = 111 Engineers/supervisors 71 - Total = 822 Construction 6 /3 Formen/Technicians 128 2 QA/QC 67 - Welder 88 17 Fabrication 214 87 - 50 100 150 200 250 300 350 13 February 2016 47

  48. Slide 48: Production capacity

    • Vessels/Equipment: 14,000 ton/year • Steel Structures/Machinery Parts: 12,000 ton/year • Piping Fabrication: 100,000 Diameter inches per year • Vessels/Spherical Tanks Erection: 1,000 ton/year • Equipment Installation: 1,000 ton/year • Steel Structure Erection: 1,000 ton/year • Piping: 100,000 dia

  49. Slide 49: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 13 February 2016 49

  50. Slide 50: Plasma and gas cutting

    Plasma Cutting: Thickness 0.5-38 mm. Work piece W 3 m. x L 15 m. Gas Cutting: Thickness 6-90 mm. 13 February 2016 50

  51. Slide 51: Pressing capacity

    Pressing Capacity Max. Force 900 Tons Max Load 1,500 Tons Column Span 6000 mm. (inside) Max 6 Meters Span 13 February 2016 51

  52. Slide 52: Plate bending

    Plate bending: Diameter of roller: 800 mm. (all 3 rollers) Capacity: 125 mm. (5”) x 3,675 mm Width. 13 February 2016 52

  53. Slide 53: Automatic submerged arc welding

    • Automatic Submerged Semi-Automatic Longitudinal Welding with Manipulator Self-Alignment Power Rolling Machine 13 February 2016 53

  54. Slide 54: Cold forming machines

    Cold forming machine: Max diameter: 6 m. Cold forming machine: Max diameter: 3.8 m. Max thickness: 40 mm. Max thickness: 22 mm. 13 February 2016 54

  55. Slide 55: Vertical boring machine

    Double Column Vertical Boring Machine Specification: 1 M Wide x 3 M Long x 300 mm Thickness capability 13 February 2016 55

  56. Slide 56: High pressure test pump

    High Pressure Test Pump - Output (max) 10,000 psi Vacuum pump w/ Booster E2M275 EH1200 - Rotary pump speed: 275 Flow (max) 668 sq. inch m3/hr. Booster pump speed: 1200m3/hr. 13 February 2016 56

  57. Slide 57: Heat treatment furnaces

    Capacity: 5.3 m.(W) x 5.3 m.(H) x 18.0 m.(L) 100 Tons Capacity: 4.5 m.(W) x 3.5 m.(H) x 6.5 m.(L) 50 – 60 Tons Up to 1,200 C degree (LPG-fired) Up to 1,200 C degree (LPG-fired) 13 February 2016 57

  58. Slide 58: Blasting shop

    Abrasive material: Grit Shop dimension: L 25 m. x W 13 m. x H 7 m. 13 February 2016 58

  59. Slide 59: ISO Certificates

    ~so Certificates CERTIFICATE OF APPROVAL CERTIFICATE OF APPROVAL CERTIFICATE OF APPROVAL I his 1s to certify that the Occuoat1onal Health & Safety Ma'lagement System This 1s to cert ify that the Quality Management System of: This is to certify that the Environmental Management System of: of: Unimit

  60. Slide 60: ASME Certificates of Authorization

    ~ CERTIFICATE OF ~ CERTIFICATE OF l,_Y AUTHORIZATION l,_Y AUTHORIZATION u U2 The named company is a uthorized by the American Society of Mechanical Engineers The named company is authorized by the American Society of Mechanical Engineers (ASME) for the scope of activity shown below in accordance wit

  61. Slide 61: Certificate of Authorization

    THE NATIONAL BOARD ~ CERTIFICATE OF BOILE R & OF PRESSUR E VESSEL I N S PECTORS Certificate of Authorization v s AUTHORIZATION ~:-;) The named company is authorized by the American Society of Mechanical Enginee rs (ASME) fo r the scope of activity shown below in accordance with the applicable rules

  62. Slide 62: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 13 February 2016 62

  63. Slide 63: Location

    Locat~on BANGKOK ·- ·- Suvarnabhumi Airport BAN BUNG 7.i"C • T ..:;, I ""'' 0 ~&. UNIMIT ENGINEERING PUBLIC COMPANY LIMITED ~·· '}'o \l 9tJ J.~o--- ~ 11 ~ I ~ •f • C':.t•.,...U . [,~ I ,. 1 ~ft.......... Ml LAEM CHABANG ' I~ I• •"<) > i~~UNO ..,.,..... / PATTAYA "" Factory# 3 RAYO NG - - _ MAP TA PH

  64. Slide 64: Plant Layout Factory 1 and 2

    P~ant Layout f a1ctory 1 and 2 13 February 2016 64

  65. Slide 65: Factory 1 layout

    Width = 155 m. (Front View) Length = 428 m. Area = 71,200 sq.m. Canteen 13 February 2016 65

  66. Slide 66: Factory 2 layout

    Width = 270 m. Length = 645 m. Area = 123,216 sq.m. 13 February 2016 66

  67. Slide 67: Plant Layout Factory 3

    Plant Layout Factory 3

  68. Slide 68: Factory 3 layout

    Factory 3 Start Operate in Year 2009 Width = 83 m. Length = 48 m. Area = 38,400 sq.m. 13 February 2016 68

  69. Slide 69: Agenda

    01 Company overview 02 Business segment 03 Organization, Manpower and Capacity 04 Equipment and Certificates 05 Location 06 Client & End user list 13 February 2016 69

  70. Slide 70: ,,,n 1r1,,,, .... :: I "0 :\1 1• -:. . .,,,.fl . . .

    ,,,n 1r1,,,, .... :: I "0 :\1 1• -:. . .,,,.fl . . . .,. 13 February 2016 70

  71. Slide 71: Client list

    aibel • 1 1 <SlJvetcoaibel" ~ cfH91£JlP CllYDDA TOSHIBA ThyssenKrupp DAEWOO 13 February 2016 \!TJ\11<1-SHI\ IJD. 71

  72. Slide 72: Petrochemical industry users

    Userr) ( Petroche111ical Industry ) EB Bayer . . a •BASF ,---~ The Chemical Company 8 !tffBPRAXAIR • 13 February 2016 72

  73. Slide 73: Other industry users

    ( o1ther /11dr1stry ) Chevron u~LJn ui~1n~[ns1~uu 1iirtn (unirsu) The Bangchak Petroleum Public Company Limited .,.. TATA TATA STEEL PT TEP Mubadala Petroleum 13 February 2016 73

  74. Slide 74: 13 February 2016

    13 February 2016 74

Unimit Engineering Public Company — Investor Presentation (February 2016) on 6ix