Slide 1: Asset Development Strategy
Asset Development Strategy March 2012 Andrej Karpinski Executive Chairman www.korab.com.au ASX:: KOR ASX
Slide 2: Value Proposition
Value Proposition Investment • Lugansk – 1 million ounce gold resource, with exploration upside • Winchester – 17 million tonnes magnesite, development phase • Geolsec – phosphate, development phase • Melrose and others – early to advanced stage exploration for copper, gold, and base metals • Market
Slide 3: Korab Overview
Korab Overview Market Cap: $11.8 million $0.35 $0.30 ASX : KOR $0.25 Shares on issue: 88 million $0.20 Options on issue: Nil $0.15 Last price: $0.135 $0.10 $0.05 Top 20 shareholding: 52% $0.00 Directors shareholding: 31% Board & Management Andrej Karpinski • Background in resources financing, commod
Slide 4: Project Portfolio
PROJECT PORTFOLIO 3 www.korab.com.au ASX:: KOR ASX
Slide 5: Current Portfolio
Current Portfolio Lugansk – Gold • Bobrikovo gold and silver mine and deposit in Ukraine • JORC compliant resource of 1,012,000 ounces of gold (see Appendix, slide 17) • Mining and stockpiling of the oxide ore has been in progress since March 2010 • Recently increased project area Geolsec – Phosphat
Slide 6: Current Portfolio
Current Portfolio Winchester – Magnesium • Located 70 km from Darwin port, all infrastructure on site • Low operating cost potential • Large JORC compliant resource base sufficient for 50 year mine life (see slide 10) • 1st Stage - initial focus on MgO based building products at a rate of 75,000 tpa
Slide 7: Lugansk (gold)
Lugansk (gold) Bobrikovo project status and characteristics • Korab has a 68 per cent interest in Lugansk Gold Ltd, which owns the Bobrikovo gold and silver deposit in eastern Ukraine • Bobrikovo has a JORC compliant resource of 20m tonnes at an average grade of 1.55g/tonne, for 1,012,000 ounces of
Slide 8: Lugansk (gold)
Lugansk (gold) Open pit operations at Bobrikovo 7 www.korab.com.au ASX:: KOR ASX
Slide 9: Geolsec (phosphate)
Geolsec (phosphate) Project status • The Geolsec phosphate project is located within Korab’s Rum Jungle mining leases, 70 kilometres by road from Darwin’s port with good access to required infrastructure • Korab is working on authorisations to conduct quarrying • The phosphate deposit extends from t
Slide 10: Geolsec (phosphate)
Geolsec (phosphate) Project development • Korab is aiming to develop the Geolsec deposit as a simple quarrying operation that utilises modern techniques to reduce environmental impacts • Korab anticipates capital expenditure and start-up costs will be approximately $200,000–$300,000 Simple quarrying
Slide 11: Winchester (magnesium)
Winchester (magnesium) Winchester deposit • The Winchester magnesium project is located within Korab’s Rum Jungle exploration leases • Large resource base sufficient for 50 year mine life: • Indicated Resource of 12.2Mt at 43.1% Magnesium Oxide • Inferred Resource of 4.4Mt at 43.6% Magnesium Oxide T
Slide 12: Winchester (magnesium)
Winchester (magnesium) Project status • Project has been through feasibility study process, including: • Mine planning and design • Preparation of environmental impact statement • Design of process flow chart and design of the processing and crushing plant • Test mining, construction of the pilot pr
Slide 13: Melrose (gold)
Melrose (gold) Project status • Korab holds a 96 per cent interest in Melrose Gold Mines Ltd • Melrose controls several gold projects in the eastern Goldfields, Gascoyne and Pilbara region of Western Australia, and within the Pine Creek Orogen in the Northern Territory • The Melrose gold project in
Slide 14: Corporate Strategy
CORPORATE STRATEGY 13 www.korab.com.au ASX:: KOR ASX
Slide 15: Asset Development Strategy
Asset Development Strategy Corporate strategy to build a resource house that will locate and acquire undervalued commodities projects • Develop to production or successful value creation for Korab shareholders • Successful track record of acquisitions including: • Winchester magnesium project • Melr
Slide 16: Conclusion
Conclusion Asset Developer • Corporate model to locate, acquire, advance and crystallise value from resources projects • Develop to production or successful value creation for Korab shareholders Track Record • Successful track record of identifying and adding value to resources projects, including;
Slide 17: Appendices
APPENDICES 16 www.korab.com.au ASX:: KOR ASX
Slide 18: JORC Resource Table
JORC Resource Table Bobrikovo Project The Bobrikovo deposit resource estimate is as follows: Bobrikovo Resource (above 0.5g/t) Classification Tonnes Au g/t Ounces Measured 1,660,326 2.05 109,614 Indicated 4,110,366 2.77 365,271 Inferred 14,475,234 1.15 537,337 Total 20,245,926 1.55 1,012,222 Melrose
Slide 19: Contacts
Contacts Shane Murphy & Adrian Watson, FTI Consulting Andrej K. Karpinski Phone: +618 9386 1233 Executive Chairman +61 420 945 291 Perth office: +618 9474 6166 +61 419 040 807 E-mail: akk@korab.com.au Email: shane.murphy@fticonsulting.com adrian.watson@fticonsulting.com Korab Resources Ltd, Korab Ho