Korab Resources Limited · ASX:KOR

Korab Resources — Investor Presentation (June 2017)

34 slides from Korab Resources's investor presentation, Jun 22, 2017

  1. Slide 1: Korab Resources Ltd Corporate Presentation

    KORAB RESOURCES LTD CORPORATE PRESENTATION Andrej K. Karpinski Chairman June 2017

  2. Slide 2: Korab Resources Summary

    Korab Resources Summary Established in 1998 Address Listed in 2005 20 Prowse Street, West Perth WA, 6005 Capital Structure Tel: +61 (0) 89474 6166 288 Mln shares and 4 Mln 10c options Last Price: 2.3 cents www.korab.com.au Market Capitalisation: $6.6 Mln Directors Market Codes: Andrej K. Karpinski –

  3. Slide 3: Winchester magnesium carbonate deposit

    Winchester magnesium carbonate deposit Company status Tenure AusMag is a private company registered and based in Western Australia with Korab Resources Ltd holding 100% of issued shares. AusMag owns 100% of the Winchester deposit and the Mineral Lease ML30587 where it is located AusMag is focused on

  4. Slide 4: Magnesium carbonate

    Magnesium carbonate Magnesium carbonate markets Magnesium carbonate users Raw magnesite ore Calcined magnesia Dead burned magnesia Fused magnesia 3

  5. Slide 5: Magnesium metal

    Magnesium metal Magnesium alloys Magnesium alloys used in a car Magnesium alloys are extensively used in production of motor vehicles and aerospace applications Because of their stiffness, strength and light weight, magnesium alloys are the preferred material used by car makers to reduce the weight

  6. Slide 6: Magnesium-ion batteries

    Magnesium-ion batteries Magnesium-ion vs Lithium-ion Examples Magnesium ions carry a double positive charge –vs- single positive charge carried by lithium ions Magnesium-ion battery's capacity is 8 to 12 times higher than a lithium-ion battery. Magnesium-ion battery's charge/discharge efficiency is

  7. Slide 7: Magnesium-diboride superconductors

    Magnesium-diboride superconductors Superconductors uses MRI Scanner Magnesium-diboride (MgB2) superconductors can operate at “high” temperature of 40K and have already been commercialised Current sectors using MgB2 superconductors MRI imaging equipment Low-mass high-power electric motors for naval p

  8. Slide 8: Magnesium-diboride superconductors

    Magnesium-diboride superconductors Naval propulsion electric motor Tests of naval propulsion motor Northrop Grumman MgB2 superconductive naval electric motor MgB2 superconductive naval propulsion electric motor undergoing has the same power as copper motor but is 70% lighter “wet’ testing under load

  9. Slide 9: Location

    Location 10 kilometres WINCHESTER OPEN PIT <> ee

  10. Slide 10: Simplified mine layout

    Simplified mine layout <= 70km to Darwin werushers/screens A Fines A Batchelor Rd “il Waste dump ‘~~ Open pit

  11. Slide 11: Darwin Port

    Darwin Port 10

  12. Slide 12: Mineralisation (north view)

    Mineralisation (north view) 11

  13. Slide 13: Mineralisation (south view)

    Mineralisation (south view) 12

  14. Slide 14: Test mining (drill & blast)

    Test mining (drill & blast) 13

  15. Slide 15: Test mining (setting charges)

    Test mining (setting charges) 14

  16. Slide 16: Test mining (loading)

    Test mining (loading) 15

  17. Slide 17: Winchester project summary

    Winchester project summary Located 85km from Darwin port Year-round access by sealed road Simple quarry operation supplying crushed raw magnesite rock (MgCO3) in bulk, no processing, just crush and screen Annual capacity can be easily increased if demand justifies Deposit is a near surface, ore body

  18. Slide 18: Winchester project status

    Winchester project status Various tests and studies successfully completed Metallurgical testing, and production of magnesium metal Calcination testing Hydrological studies Environmental studies Commercialisation is progressing Granted mining lease (to 2040 with rights to extend) Offtakes and sales

  19. Slide 19: Operating costs (in Australian Dollars)

    Operating costs (in Australian Dollars) SUMMARY 200KT/Y 400KT/Y 800KT/Y WATER MANAGEMENT ($/YR.) 440,000 440,000 440,000 WASTE DUMPS ($/YR.) 180,000 180,000 180,000 QUARRY AND CRUSHING ($/YR.) 3,906,452 7,137,186 12,421,015 SUBTOTAL ($/YR.) 4,526,452 7,757,186 13,041,015 CONTINGENCY (30%) 1,357,935

  20. Slide 20: Financials

    Financials EBITDA vs sales volumes •Aggregate EBITDA of AU$395 mln over quarry life •Attractive long-run annual EBITDA of AU$31 mln/year (at 800kt/year sales) •Low projected operating cost in the lowest quartile of global magnesite projects Production target information contained in this report was

  21. Slide 21: Development costs

    Development costs CAPEX estimates from PFS study SUMMARY AU$ WATER MANAGEMENT 626,810 SITE INFRASTRUCTURE 1,079,310 WASTE DUMPS 108,925 QUARRY 1,293,290 SUBTOTAL 3,108,335 CONTINGENCY (30%) 932,501 TOTAL ESTIMATE 4,040,836 Capital expenditure is exceptionally low due to very simple quarry operation

  22. Slide 22: Base case plan

    Base case plan 21

  23. Slide 23: Scale-up development plan

    Scale-up development plan 22

  24. Slide 24: Other details

    Other details •Exceptionally low capex of ~AU$4 million (~US$3Mln) EBITDA Sensitivity to MgCO3 prices •Mine can be developed in stages and easily expanded •No need for additional funding once mine is in operation, capacity expansion can be fully funded from cashflow •Mine can operate at a profit wit

  25. Slide 25: Winchester magnesium carbonate resource

    Winchester magnesium carbonate resource JORC compliant mineral resource estimate was generated from RC and diamond core drilling within a Magnesium carbonate at Winchester Winchester deposit and geology 6%-7% section of the mineralised trend JORC resource formed the basis for the design of the open

  26. Slide 26: Geological map

    Geological map 25

  27. Slide 27: Batchelor project exploration

    Batchelor project exploration Major geophysical anomalies (IP and EM) present at the location of a large cobalt soil geochemical anomaly covering over 488,000 m2 Historical rock chips at this location returned up to 0.495% cobalt and 5.8g/t gold Historical drilling at this target returned up to 0.14

  28. Slide 28: Batchelor project exploration - cobalt

    Batchelor project exploration - cobalt Highlights (above 700ppm Co) from Reverse Circulation drilling include following multiple zones of cobalt, copper and gold (where available) mineralisation: HOLE_ID FROM_M TO_M CO_PPM CU_PPM AU_PPM BRC2 41 42 725 120 n/a BRC2 43 44 1,090 152 n/a BRC2 44 45 895

  29. Slide 29: Batchelor project exploration - cobalt

    Batchelor project exploration - cobalt Highlights (above 500ppm Co) from surface sampling include following high grade cobalt samples: TYPE CO_PPM CU_PPM NI_PPM rockchip 4,950 rockchip 4,033 rockchip 2,660 1,610 700 rockchip 2,102 rockchip 2,000 945 460 rockchip 1,910 260 1,020 rockchip 1,510 1,050

  30. Slide 30: Batchelor project exploration - cobalt

    Batchelor project exploration - cobalt Highlights (above 500 ppm Co) from shallow RAB drilling include following zones of cobalt mineralisation: HOLE_ID FROM_M TO_M CO_PPM CU_PPM NI_PPM MGR230 1 3 2,400 1,140 570 MGR230 3 5 2,700 1,540 735 MGR230 5 7 1,500 1,080 630 MGR230 7 9 1,420 800 455 MGR766 9

  31. Slide 31: Batchelor project exploration - cobalt

    Batchelor project exploration - cobalt 30

  32. Slide 32: Batchelor project exploration - cobalt

    Batchelor project exploration - cobalt 31

  33. Slide 33: Batchelor project exploration - cobalt

    Batchelor project exploration - cobalt 32

  34. Slide 34: Important Information

    Important Information This presentation has been prepared by Korab Resources Limited (“Korab” or the “Company”). It should not be considered as an offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect to those s

Korab Resources — Investor Presentation (June 2017) on 6ix