Stellar Resources Limited · ASX:SRZ

Stellar Resources — Mines and Money Asia 2017

23 slides from Stellar Resources's conference presentation, Apr 6, 2017

  1. Slide 1: Heemskirk Tin Project

    For personal use only Heemskirk Tin Project Highest grade undeveloped ASX-listed tin project Mines and Money Asia 5th April 2017 ASX: SRZ www.stellarresources.com.au

  2. Slide 2: Five reasons to own Stellar

    Five reasons to own Stellar For personal use only  Tin price has bottomed – multi-year market deficit  High grade and locational advantages provide competitive costs in a low risk environment  Significant improvement in NPV/Capex as development strategy optimised  Strategy and timeline focus

  3. Slide 3: Corporate overview

    Corporate overview For personal use only Share price recovery yet to reflect solid achievements at Heemskirk Tin Company overview  100% owner of Heemskirk Tin Project, 150km south of Burnie, Tasmania  Stand-out high grade resource (1.13% Sn) with vision to be a major Australian tin producer  Meta

  4. Slide 4: Board of Directors

    Board of Directors For personal use only Experienced and multi-disciplinary Board with strong global connections Phil Harman Non-Executive Chairman Geophysicist  Over 30 years experience in BHP Billiton Thomas Whiting minerals exploration Non-Executive Director  Past and present Director of severa

  5. Slide 5: Tin price recovery underway

    Tin price recovery underway For personal use only LME tin price is up 50% from its mid-January 2016 low Supply rationalisation underpinning price  Supply restraint from largest producers China and Indonesia through 2016 and into 2017  Growth of new supply from Myanmar accommodated by China cutback

  6. Slide 6: Tin demand – next growth phase?

    Tin demand – next growth phase? For personal use only Tin demand – long-periods of strong growth  Tin demand characterised by long periods of above trend growth driven by new uses  Emergence of tin in lead acid batteries one example of a new use that could gain more traction  Current growth pause

  7. Slide 7: Rising tin market deficit?

    Rising tin market deficit? For personal use only In 2015/2016, supply did the heavy lifting – will 2017 be characterised by an increased market deficit driven by stronger demand growth? 7

  8. Slide 8: Best location for a new mine

    Best location for a new mine For personal use only West Coast Tasmania is a world-class tin jurisdiction  Significant mining district  Many historical and current operating mines across various commodities  Supportive local community and skilled workforce  Experienced workforce available with se

  9. Slide 9: Mining Lease Granted

    Mining Lease Granted For personal use only Mining Lease grant is a significant project milestone that increases tenure and adds security over the right to mine tin  ML 2023P/M granted to wholly owned subsidiary Columbus Metals Limited  Term is 12 years to 1st January 2029  Provides right to carry

  10. Slide 10: Heemskirk – a world class tin project

    Heemskirk – a world class tin project For personal use only  Heemskirk is well placed on the grade tonnage curve - potential to increase grade and tonnes  Existing underground producers San Rafael and Renison facing declining grade as are other producers  Competitors either lower grade or in high

  11. Slide 11: Attractive tin industry cost curve

    Attractive tin industry cost curve For personal use only  Industry cost curve provides attractive margin for low cost operations  Heemskirk is likely to be placed at the 45th percentile  No further costs to be removed Current LME tin price from the industry – cost curve at a cyclical low  Equili

  12. Slide 12: Development strategy optimised

    Development strategy optimised For personal use only Several studies completed - final feasibility remaining Study PFS (Prelim Feasibility) OPFS (Optimisation) Fast Start (Scoping) Increasing NPV/Capex Completion Jul-13 Nov-15 Sep-16 Development underground mine underground mine underground mine Str

  13. Slide 13: Timeline – fast start feasibility

    Timeline – fast start feasibility For personal use only Stellar is poised to embark on a DFS for the Heemskirk project based on a fast start approach  April 2017 - drilling commenced - significant news-flow to follow over the next 12 months  Drilling targeting high-grade structures and testing exp

  14. Slide 14: Renison provides exploration model

    Renison provides exploration model For personal use only Comparison with Renison shows that known deposits at Heemskirk are just the start – mineralisation at Renison over 1200m vertically from surface  Australia’s oldest and largest Sn mine is located 18km away to the NE of the Heemskirk Sn projec

  15. Slide 15: Five reasons to own Stellar

    Five reasons to own Stellar For personal use only  Tin price has bottomed – multi-year market deficit  High grade and locational advantages provide competitive costs in a low risk environment  Significant improvement in NPV/Capex as development strategy optimised  Strategy and timeline focus

  16. Slide 16: Disclaimer

    Disclaimer For personal use only Forward Looking Statement This presentation may include forward-looking statements. Forward-looking statements include, but are not limited to statements concerning Stellar Resources Limited’s planned activities and other statements that are not historical facts. Whe

  17. Slide 17: Appendix

    For personal use only Appendix Heemskirk History JORC 2012 Resource Process Plant Simplification PFS Mine Plan Drilling Program ASX: SRZ www.stellarresources.com.au

  18. Slide 18: Heemskirk – Discovery to Production

    Heemskirk – Discovery to Production For personal use only NW Tasmania – Australia’s largest and most Evolution of a world class tin project productive tin field  QH tin deposit discovered early 1960s by Gippsland Ltd  Aberfoyle jv with Gippsland in 1971 – discovered Montana and Severn deposits  T

  19. Slide 19: JORC 2012 confirms resource quality

    JORC 2012 confirms resource quality For personal use only Mineral Resource estimate more robust following JORC 2012 upgrade  6.35mt @ 1.13% Sn or 72,000t of contained Sn  97% of contained Sn is in the form of cassiterite – the most readily recoverable Sn mineral  64% of Indicated Resource in Lowe

  20. Slide 20: Process plant simplified

    Process plant simplified For personal use only Metallurgical optimisation led to smaller primary grind and elimination of heavy media separation and silica float circuits saving capex  Removed heavy media separation  Coarser grind size  Increased to 250µ from 160µ  Improved recovery from gravity

  21. Slide 21: Heemskirk PFS mine plan

    Heemskirk PFS mine plan For personal use only Surface Queen Hill Long Hole Stoping Montana Long Hole Stoping Severn Drift & Fill Severn Long Hole Stoping Open at depth 500m 21

  22. Slide 22: 9,000m drilling program – April start

    9,000m drilling program – April start For personal use only Cassiterite SnO2 22

  23. Slide 23: Stellar Resources Limited

    Stellar Resources Limited Level 17, 530 Collins Street For personal use only Melbourne VIC 3000 Phone +61 3 9618 2540 Fax +61 3 9649 7200 www.stellarresources.com.au 23

Stellar Resources — Mines and Money Asia 2017 on 6ix