Lincoln Minerals Limited · ASX:LML

Lincoln Minerals — Noosa Mining Conference 2025

29 slides from Lincoln Minerals's conference presentation, Jul 23, 2025

  1. Slide 1: Unlocking Value - Developing Strategic Critical Mineral Projects

    Unlocking Value - Developing Strategic Critical Mineral Projects in South Australia’s Gawler Craton Noosa Mining Conference: Investor Presentation July 2025

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer Disclaimer and Competent Person Statement The information contained in this document (“Presentation”) has been prepared Lincoln Minerals Limited (“Company”). The future performance and actual results or developments may differ materially from those in the forward-look

  3. Slide 3: Diversified Critical Minerals Portfolio: Four Key Commodities - Three Advanced Projects

    Diversified Critical Minerals Portfolio: Four Key Commodities - Three Advanced Projects • Located in South Australia’s Gawler Craton: Potential for large-scale copper and Copper/Zinc Exploration base metal mineralisation. Discovery Hole1 29.5m @ 0.8% Cu, • Multiple sulphide-bearing zones, 7km of str

  4. Slide 4: South Australia's Gawler Craton – A Tier-1 Critical Minerals Jurisdiction

    South Australia’s Gawler Craton – A Tier-1 Critical Minerals Jurisdiction • Gawler Craton highly ranked for global mining investment and strong trade agreements. • Stable political environment, proximity to Asia, the Middle East, and North Africa. Copper • South Australia hosts about 10%5 of the wor

  5. Slide 5: Unlocking value with infrastructure in place

    Unlocking value with infrastructure in place 5 Favourable Jurisdiction and Infrastructure • All projects located within 5–35km of grid power and towns. • Port, power, water and road access in place supporting faster and cheaper project development. • Multiple port options available, including Port L

  6. Slide 6: Copper back on the rise

    Copper back on the rise 6 • Essential metal for EVs, renewables, grids & data centres • Structural supply gap: demand rising, ore grades declining, new mines delayed • Demand increasing, IEA forecasts refined copper demand to grow from 27Mt (2024) to 33Mt by 2035 • Supply shortfall: IEA forecast up

  7. Slide 7: Minbrie Copper-Base Metals Project – Confirming Scale Across Untested Zones

    Minbrie Copper-Base Metals Project – Confirming Scale Across Untested Zones 7 Investor Presentation | July 2025 | lincolnminerals.com.au

  8. Slide 8: Minbrie Discovery – Previously Overlooked

    Minbrie Discovery – Previously Overlooked Reinterpreting legacy data – Minbrie breakthrough February 2025 BUDD1921: A fortuitous discovery reignites Minbrie 29.5m @ 0.8% copper (Cu), 7.5% lead (Pb), 1.9% zinc (Zn), 9.0 g/t silver (Ag) from 131.1m including: • 12m @ 1.3% Cu, 12.4% Pb, 2.0% Zn, and 13

  9. Slide 9: Drilling Planned in Northern Section

    Drilling Planned in Northern Section Two target areas selected for initial testing Immediate targets focused around the “discovery hole” BUDD192 • Testing up dip and down dip and along strike between Magnetite BIF Footwall & Mylonite Shear Zone • Testing for an oxide and/or a supergene zone • Drill

  10. Slide 10: Strategic Drill Program – Trap Zone Targeting

    Strategic Drill Program – Trap Zone Targeting Three priority trap zones identified*: • Trap Zone 1: Between magnetite BIF footwall & Mylonite Shear Zone, within reactive Katunga Dolomite Lithologies. Around BUDD1921: 29.5m @ 0.8% Cu, 7.5% Pb, 1.9% Zn, 9.0 g/t Ag from 131.1m Trap Zone 2 • Trap Zone 2

  11. Slide 11: From Simple Cross Sections to a Complex 3D Model

    From Simple Cross Sections to a Complex 3D Model Original interpretation1 before re-logging and re-assay New modelling2 revealing the complexity of the target zone which is program (February 2025). de-risking upcoming drilling (June 2025) 1 LML ASX announcement dated 12 February 2025, titled “Minera

  12. Slide 12: Drilling Area - Targeting Trap Zone 1 & 2

    Drilling Area - Targeting Trap Zone 1 & 2 BUDD1921 is 29.5m @ 0.8% copper (Cu), 7.5% lead (Pb), 1.9% zinc (Zn), 9.0 g/t silver (Ag) from 131.1m BURCD030 shows a correlation with BUDD192, terminating just metres from expected mineralisation, pXRF showing copper bornite vein at 274m (up to pXRF 3.03%

  13. Slide 13: Drilling Area - Targeting Trap Zone 3

    Drilling Area - Targeting Trap Zone 3 High Priority Area Along Major Cross-Cutting Structure • Drill holes still being designed around footwall mineralised intercept BURCD020A1: Key Insights • Identified dilation zone linked to regional Intersection of Kalinjala Shear Zone - Mylonite Shear Zone, and

  14. Slide 14: Next Steps

    Next Steps Drill Ready early Q4 CY2025 1. Finalise drill hole designs around (BURCD020A) to define scale and continuity of mineralisation. 2. Submitting permitting documentation, with no issues foreseen for approvals. Anticipated to be approved within 2 months 3. Select and engage driller. 4. Drill

  15. Slide 15: Multiple Catalysts Across Commodity Classes

    Multiple Catalysts Across Commodity Classes Copper-Base Metals • Prioritised drill targeting from Northern corridor Minbrie Project • Testing Target Zones using RC with a Diamond Drill tail Graphite • Further updates on strategic discussions and commercialisation plans. Kookaburra Graphite Project U

  16. Slide 16: For Further Information

    For Further Information: Jonathon Trewartha Chief Executive Officer Lincoln Minerals Limited jonathon.trewartha@lincolnminerals.com.au 1300 137 116 Kristin Rowe Investor and Media Relations NWR Communications kristin@nwrcommunications.com.au +61 404 88 98 96 Community/Investor Enquiries Community@li

  17. Slide 17: Appendix

    Lincoln Minerals Appendix “aa ASX:LML

  18. Slide 18: Corporate Overview

    Corporate Overview Capital Structure LML A$0.0071 2,102M $14.71M Nil ASX Code Shares on Issue Market Capitalisation Debt Share Price Ryan Smith Mr Smith combines 18 years working in the corporate sector managing financial risk with 16 years’ experience as a Member of the Victorian Parliament, servin

  19. Slide 19: Appendix - Mineral Resources Summary

    ASX:LML Appendix 1 - Mineral Resources Summary 19 Green Iron Project – Mineral Resources Summary Kookaburra Graphite Project Total Mineral Resources3 JORC Year Tonnes Mass Recovery Fe Head SiO2 Head Fe Con SiO2 Con Deposit Name Classification Cut-off Contained Status (Mt) (%) (%) (%) (%) (%) Measure

  20. Slide 20: Kookaburra Graphite Project Strategic Pathway to Partnership and Value Creation

    Kookaburra Graphite Project Strategic Pathway to Partnership and Value Creation

  21. Slide 21: Kookaburra Graphite Project – First Mover Advantage

    Kookaburra Graphite Project – First Mover Advantage Competitive Advantages: • Ultra-high-grade graphite at surface within an existing Mining Lease • Located near key infrastructure on South Australia’s Eyre Peninsula • Low start-up capital $29M1 • Compelling starter pit supports near-term developmen

  22. Slide 22: Kookaburra Graphite Project – Compelling economics

    Kookaburra Graphite Project – Compelling economics Compelling project economics Key Financial and Production1 Metrics • Pre-tax NPV10 of A$114m or (US$77m); Strong Financial metrics • Pre-tax IRR of 41%; • Start-up capital requirement of A$29m (US$19m); • Average Cash EBITDA1 of ~A$23m (US$15m); Low

  23. Slide 23: Kookaburra Graphite Project – Positioned for Upside in a Rising Graphite Market

    Kookaburra Graphite Project – Positioned for Upside in a Rising Graphite Market • Pre-tax1 NPV10 of A$114m. • Pre-tax1 IRR of 41%; • Start-up capital1 requirement of A$29m • Average Cash EBITDA1 of ~A$23m Lincoln offers strong exposure to 517 • Average Cash EBITDA1 margin of 42%. anticipated graphit

  24. Slide 24: Uranium Targets Multiple Drill-Ready Targets in Emerging Uranium Province

    Uranium Targets Multiple Drill-Ready Targets in Emerging Uranium Province

  25. Slide 25: Uranium – Strategic Position in Leading Province

    Uranium – Strategic Position in Leading Province Lincoln has multiple highly prospective uranium targets across its existing tenement portfolio all located in South Australia’s emerging uranium province. Known uranium mineralisation exists on each project area, including historical drilling and rece

  26. Slide 26: Uranium – Value Upside

    Uranium – Value Upside Key Catalysts: Eridani • Soil sampling program following up on initial ground reconnaissance • Follow-up AEM survey to define structures over the region Jungle Dam • Drilling campaign CCC Yallunda • Re-assay intervals of interest from historic Centrex and other cores, as they

  27. Slide 27: High Purity Iron & DRI Project Advancing Strategic Partnerships

    High Purity Iron & DRI Project Advancing Strategic Partnerships

  28. Slide 28: Direct Reduction Iron is a Growing Market

    Direct Reduction Iron is a Growing Market ⎪ Demand for Direct Reduction Iron Rising: Surge in Electric Arc Furnace builds driving need for high-grade DRI material GLOBAL CRUDE STEEL AND DRI PRODUCTION Central/North Europe (K Tonnes) West/South Europe 35 800 Canada 700 30 600 China Crude Steel Produc

  29. Slide 29: High Purity Iron and DRI Project – Advanced and Strategically Positioned in South Australia

    High Purity Iron and DRI Project – Advanced and Strategically Positioned in South Australia Location • 100% Lincoln-owned Australian assets • Lower capital requirements with major infrastructure nearby; less than 5km from power, 15km from mains water1, and within 60km of one active port and two appr

Lincoln Minerals — Noosa Mining Conference 2025 on 6ix