Parabellum Resources Ltd. · ASX:PBL

Parabellum Resources — Investor Presentation (November 2022)

39 slides from Parabellum Resources's investor presentation, November 2022

  1. Slide 1: Developing one of the larger rare earth deposits in the world

    Developing one of the larger rare earth deposits in the world PRESENTATION | NOVEMBER 2022 ASX:PBL

  2. Slide 2: Disclaimer

    2 Disclaimer This investor presentation has been prepared by Parabellum Resources Limited (ACN 645 149 211) (Company or RELIANCE ON PRESENTATION Parabellum). The issue of this presentation is intended only for the person or entity to which it has been The information contained in this presentation h

  3. Slide 3: Rare Earth Elements: What are they used for?

    SCANDIUM - Aerospace components YTTRIUM - Spark plugs, cancer treatments, etc. LANTHANUM - Camera lenses, battery electrodes, etc. CERIUM - Oxidising agent, glass/ceramic colouring, etc. PRASEODYMIUM - Magnets, lasers, wind turbines. NEODYMIUM - Magnets, lasers, electric motors, etc. PROMETHIUM - Nu

  4. Slide 4: A 3MW direct drive wind turbine consumes close to two tonnes of rare-earth permanent magnets

    A 3MW direct drive wind turbine consumes close to two tonnes of rare-earth permanent magnets Source: www.lynasrareearths.com 4

  5. Slide 5: In 2021, the world installed 260,000 kW of renewable energy

    In 2021, the world installed 260,000 kW of renewable energy In 2021, China alone installed 140,000 kW of renewable energy generation A 3MW wind turbine consumes close to two tonnes of REE magnets Renewable energy growth in 2021 was >9% CAGR Source: IEA Dec 2021 and Urasian Times June 2022 5

  6. Slide 6: Location: Khotgor, Mongolia

    Location Khotgor, Mongolia 6

  7. Slide 7: Resource rich

    7 Resource rich Mongolia facts POPULATION 3.3 million (1.5 million in Ulaanbaatar) AREA Khotgor, Mongolia 1.5 million sq. Kilometres (3x size of France) UNEMPLOYMENT 4.3% GDP (PPP) MINING PRODUCTION INFLATION (CPI) • $39.7 billion • Copper ~3% ($3.5B from mining and resources) Oyu Tolgoi and Erdenet

  8. Slide 8: Resource Rich Geological Setting

    Resource Rich 8 Geological Setting Significant Geological Upside • Located in the Tsogt-Ovoo sum of Southgobi Province, 500km south of Ulaanbaatar, accessed via paved road • Local geology dominated by metamorphic rocks such as black grey sandstone, siltstone, schist and limestone intruded by early P

  9. Slide 9: Upside: Large Land Package

    9 Upside Large Land Package LICENSE Mining License MV-015631 granted in 2010 and valid for 30 years Until 2040 AREA License area of 2km x 10km 20km2 EXPLORATION Potential for gold/copper porphyry Focus on granite domes

  10. Slide 10: Project history

    10 Project history QGX drilled 58 NQ 30 year Mining holes/16,000 metres License Temerise enter into for a JORC resource granted to Khotgor agreement with Exploration by by H&S of 350Mt Resources, a local Khotgor to acquire Soviet Union (M+I+I) @ 0.96% REO Mongolian company 80% of project 1950/60’s 2

  11. Slide 11: Resource Classification Section looking north

    11 300 metres >1.5% Resource Classification Section looking north through 4885950 N Source: H&S Consultants PL, 2013 PBL Press release 04/08/2022

  12. Slide 12: 2013 Resource Summary (TBA)

    2013 Resource 12 Summary (TBA) Prime location Classification Ore Grade SG TREO LREO HREO and excellent geological @ 1% cut-off (min tonnes) (%) (000 tonnes) (000 tonnes) (000 tonnes) prospectivity given orebody’s in the vicinity Measured 22.5 1.6 2.67 361 345 17 Easy access Indicated 29.6 1.43 2.66

  13. Slide 13: Magnets and motors

    13 Magnets and motors Favourable mineral suite focussing on NdPr Product Focus Heavy Rare Earth Elements (HREE) La Ce Pr Nd Eu Gd Tb Dy Yb Lanthanum Cerium Praseodymium Neodymium Europium Gadolinium Terbium Dysprosium Ytterbum Khotgor 22.6% 51.3% 4.8% 15.2% 0.5% 0.9% 0.1% 0.4% 2.1%

  14. Slide 14: Process

    14 Process Initial low capital investment with staged project development to produce Powder final downstream products on site oxides Roasted Concentrate carbonate Open pit On site Stage 1 Stage 2 Stage 3 mine processing Value add to customer

  15. Slide 15: A Two-Year Strategy

    A Two-Year Strategy PARABELLUM RESOURCES

  16. Slide 16: International Consultants for JORC Scoping Study

    International Consultants 1 16 for JORC Scoping Study • Project Management Australia and Mongolia: Temarise Ltd • Resources MRE: SRK Mongolia • Mine Design: SRK Australia • Metallurgy: ALS Perth • Engineering: Primero Engineering • Scoping Study: SRK Australia • EIS/EIA: Baylag Ecco

  17. Slide 17: Schedule

    17 Schedule Two-year focus April 2022 Commence to Feb 2023 Q2, 2023 FEED to Q3, 2024 engineering Complete JORC Scoping Study Complete Feasibility Study Q4, 2024 and EIS $2M Scoping Study EIA and metallurgy to by SRK PFS level The timetable is indicative and subject to change

  18. Slide 18: Infill drilling, bulk sample and metallurgical testwork

    Infill drilling, bulk sample and 1 18 metallurgical testwork Core and trench analysis by SGS and ALS Two core rigs drilling from surface down to 200 metres with team from Temarise and SRK on site Orebody outcrops on surface and is free digging to 30 metres Current testwork in Perth with ALS & Primer

  19. Slide 19: Staged flow sheet development

    Staged flow sheet 1 19 development

  20. Slide 20: Community and Markets

    Community and Markets PARABELLUM |7 RESOURCES 20

  21. Slide 21: Environment, Safety & Governance

    Environment, Safety & Governance: 21 Working with local communities ENVIRONMENTAL SOCIAL • Compliance with local and international • Workforce will comprise >95% Mongolia local standards personnel • Life of Mine rehabilitation strategy being • Support of local communities by creating local developed

  22. Slide 22: Rare earths demand growth

    22 Rare earths demand growth Global Demand and 2021 2028 Domestic Consumption of REE REE Usage REE Usage Source: Statistica April 2022

  23. Slide 23: Supply vs Demand

    2 23 Supply vs Demand Significant REE supply NdPr SxD Forecasts (April 2022) imbalance from 2025

  24. Slide 24: NdPr Price Growth

    3 24 NdPr Price Growth Source: Mkango, Canaccord August 2022

  25. Slide 25: Proposed Transaction & Corporate Overview

    Proposed Transaction & Corporate Overview 25

  26. Slide 26: Corporate & Transaction Structure

    26 Khotgor Minerals – Temarise Limited – Parabellum (PBL) Corporate & Transaction Structure KHOTGOR REE PROJECT TEMARISE LIMITED PARABELLUM RESOURCES LIMITED & EXISTING OWNERSHIP OPTION TO ACQUIRE 80% KHOTGOR TEMERISE LIMITED PROJECT BY ENTERING INTO AN 80/20 SUBSCRIPTION AGREEMENT Khotgor Minerals

  27. Slide 27: Corporate overview

    27 Corporate overview Share price performance Shareholder composition1 $0.500 2,500,000 Volume A$ PBL Share Price $0.450 $0.400 2,000,000 $0.350 Retail $0.300 1,500,000 36% $0.250 $0.200 1,000,000 56% FO / HNW / Institutional $0.150 $0.100 500,000 8% $0.050 $- - Directors / Management ~$24.6 $18.7 5

  28. Slide 28: Use of funds – 12-month outlook

    28 Use of funds – 12-month outlook The Company’s proposed use of funds over the next 12 months are outlined in the following table: Projects Development Expenditure (AUD) Exploration Expenditure (AUD) Khotgor – Scoping study $2,600,000 Khotgor – Infill/Metallurgical drill program $1,300,000 $1,250,0

  29. Slide 29: Board of Directors

    29 Board of Directors MARK HOHNEN PETER RUSE Non-Executive Chairman Non-Executive Director Mark Hohnen has significant experience in the mineral Peter Ruse is a finance professional with over 15 years’ experience in Equity Funds Management and Private/ Institutional resource sector since the late 19

  30. Slide 30: Management

    30 Management PETER SECKER Ms BATTUYA GANKHUYAG MARK ARUNDELL Proposed Executive & Technical consultant Country Manager – Mongolia Chief Geologist/Project Manager, NSW Peter Secker is a Mining Engineer with over 40 Ms Battuya Gankhuyag has over 15 years of Mark Arundell is a highly experienced and s

  31. Slide 31: A Rare Investment Proposition to create Shareholder Value

    31 A Rare Investment Proposition to create Shareholder Value One of the world’s largest rare earth deposits Focus on NdPr mineral suite NdPr market size will grow over next 5 years as renewable energy demand increases at 9% CAGR RRE basket price has increased significantly in last decade Located nex

  32. Slide 32: Parabellum Resources contact details

    52 Ord Street, West Perth, WA 6005 parabellumresources.com.au info@parabellumresources.com.au @ParabellumRes ASX:PBL 32

  33. Slide 33: Australian Copper projects

    Australian Copper projects 33

  34. Slide 34: Australian Copper Projects Location & Overview

    34 Australian Copper Projects Location & Overview PBL’s Australian focus is on exploring for copper and gold deposits within the Lachlan Fold Belt in central NSW NSW is a Tier 1 mining and exploration jurisdiction with world class infrastructure Multiple copper and gold mines in the area (Northparke

  35. Slide 35: An exciting suite of copper-gold opportunities

    35 An exciting suite of copper-gold opportunities PBL’s four Australian copper assets have outstanding potential in an under- explored though highly prospective copper province Targeting massive sulphide (Besshi-type) copper mineralisation in rocks of the Girilambone Group in Western NSW, and copper

  36. Slide 36: Redlands & Whitbarrow Projects

    Redlands & 36 Whitbarrow Projects Redlands and Whitbarrow are located along strike from Aeris Resources’ Constellation deposit (I&I resource of 3.3mt at 1.4% Cu, 0.3g/t Au, 1.7 g/t Ag) 3 and Kurrajong discovery, and is contiguous with Aeris’ operating Tritton and Murrawombie mines. Also, Helix Resou

  37. Slide 37: Lunns Dam Project

    37 Lunns Dam Project Lunns Dam is along strike from Locksley Resources (ASX:LKY) Tottenham Project Airborne EM completed over the Lunns Dam Project area has delineated two high ranking anomalies - L1 and L4. Follow up ground EM has been designed and is scheduled to be completed in August with drill

  38. Slide 38: Obley Project

    38 Obley Project Multiple historic workings at Obley including Beehive, Coppermine Gully and Naroo Pits All copper-gold skarn prospects associated with distinct magnetic high within Cuga Burga Volcanics at contact zone of Yeoval Granite Follow up soil sampling of the three coherent Copper mineralisa

  39. Slide 39: Thank you

    Thank you PARABELLUM |7 RESOURCES

Parabellum Resources — Investor Presentation (November 2022) on 6ix