  1. Slide 1: Developing one of the larger rare earth deposits in the world

    For personal use only Developing one of the larger rare earth deposits in the world PRESENTATION | OCTOBER 2022 ASX:PBL

  2. Slide 2: Disclaimer

    2 Disclaimer For personal use only This investor presentation has been prepared by Parabellum Resources Limited (ACN 645 149 211) (Company or RELIANCE ON PRESENTATION Parabellum). The issue of this presentation is intended only for the person or entity to which it has been The information contained

  3. Slide 3: Rare Earth Elements: What are they used for?

    SCANDIUM - Aerospace components YTTRIUM - Spark plugs, cancer treatments, etc. For personal use only LANTHANUM - Camera lenses, battery electrodes, etc. CERIUM - Oxidising agent, glass/ceramic colouring, etc. PRASEODYMIUM - Magnets, lasers, wind turbines. NEODYMIUM - Magnets, lasers, electric motors

  4. Slide 4: A 3MW direct drive wind turbine consumes close to two tonnes of rare-earth magnets

    A 3MW direct drive wind For personal use only turbine consumes close to two tonnes of rare-earth permanent magnets Source: www.lynasrareearths.com 4

  5. Slide 5: Renewable energy installations and REE magnet demand

    In 2021, the world installed 260,000 kW of For personal use only renewable energy In 2021, China alone installed 140,000 kW of renewable energy generation A 3MW wind turbine consumes close to two tonnes of REE magnets Renewable energy growth in 2021 was >9% CAGR Source: IEA Dec 2021 and Urasian Time

  6. Slide 6: Location: Khotgor, Mongolia

    For personal use only Location Khotgor, Mongolia 6

  7. Slide 7: Resource rich Mongolia facts

    7 Resource rich For personal use only Mongolia facts POPULATION 3.3 million (1.5 million in Ulaanbaatar) AREA Khotgor, Mongolia 1.5 million sq. Kilometres (3x size of France) UNEMPLOYMENT 4.3% GDP (PPP) MINING PRODUCTION INFLATION (CPI) • $39.7 billion • Copper ~3% ($3.5B from mining and resources)

  8. Slide 8: Geological Setting

    Resource Rich 8 Geological Setting For personal use only Significant Geological Upside • Located in the Tsogt-Ovoo sum of Southgobi Province, 500km south of Ulaanbaatar, accessed via paved road • Local geology dominated by metamorphic rocks such as black grey sandstone, siltstone, schist and limesto

  9. Slide 9: Large Land Package

    9 Upside For personal use only Large Land Package LICENSE Mining License MV-015631 granted in 2010 and valid for 30 years Until 2040 AREA License area of 2m x 10km 20km2 EXPLORATION Potential for gold/copper porphyry Focus on granite domes

  10. Slide 10: Project history

    10 Project history For personal use only QGX drilled 58 NQ 30 year Mining holes/16,000 metres License Temerise enter into for a JORC resource granted to Khotgor agreement with Exploration by by H&S of 350Mt Resources, a local Khotgor to acquire Soviet Union (M+I+I) @ 0.96% REO Mongolian company 80%

  11. Slide 11: Resource Classification Section looking north

    11 300 metres >1.5% For personal use only Resource Classification Section looking north through 4885950 N Source: H&S Consultants PL, 2013 PBL Press release 04/08/2022

  12. Slide 12: 2013 Resource Summary

    2013 Resource 12 Summary (TBA) For personal use only Prime location Classification Ore Grade SG TREO LREO HREO and excellent geological @ 1% cut-off (min tonnes) (%) (000 tonnes) (000 tonnes) (000 tonnes) prospectivity given orebody’s in the vicinity Measured 22.5 1.6 2.67 361 345 17 Easy access Ind

  13. Slide 13: Magnets and motors: NdPr focus

    13 Magnets and motors For personal use only Favourable mineral suite focussing on NdPr Product Focus Heavy Rare Earth Elements (HREE) La Ce Pr Nd Eu Gd Tb Dy Yb Lanthanum Cerium Praseodymium Neodymium Europium Gadolinium Terbium Dysprosium Ytterbum Khotgor 22.6% 51.3% 4.8% 15.2% 0.5% 0.9% 0.1% 0.4%

  14. Slide 14: Process

    14 Process For personal use only Initial low capital investment with staged project development to produce Powder final downstream products on site oxides Roasted Concentrate carbonate Open pit On site Stage 1 Stage 2 Stage 3 mine processing Value add to customer

  15. Slide 15: A Two-Year Strategy

    For personal use only A Two-Year Strategy 15

  16. Slide 16: International Consultants for JORC Scoping Study

    International Consultants 11 6 for JORC Scoping Study For personal use only • Project Management Australia and Mongolia: Temarise Ltd • Resources MRE: SRK Mongolia • Mine Design: SRK Australia • Metallurgy: ALS Perth • Engineering: Primero Engineering • Scoping Study: SRK Australia • EIS/EIA: Baylag

  17. Slide 17: Schedule: Two-year focus

    17 Schedule For personal use only Two-year focus April 2022 Commence to Feb 2023 Q2, 2023 FEED to Q3, 2024 engineering Complete JORC Scoping Study Complete Feasibility Study Q4, 2024 and EIS $2M Scoping Study EIA and metallurgy to by SRK PFS level The timetable is indicative and subject to change

  18. Slide 18: Infill drilling, bulk sample and metallurgical testwork

    Infill drilling, bulk sample and 11 8 metallurgical testwork For personal use only Core and trench analysis by SGS and ALS Two core rigs drilling from surface down to 200 metres with team from Temarise and SRK on site Orebody outcrops on surface and is free digging to 30 metres Current testwork in P

  19. Slide 19: Staged flow sheet development

    Staged flow sheet 11 9 development For personal use only

  20. Slide 20: Community and Markets

    For personal use only Community and Markets 20

  21. Slide 21: Environment, Safety & Governance: Working with local communities

    Environment, Safety & Governance: 21 Working with local communities For personal use only ENVIRONMENTAL SOCIAL • Compliance with local and international • Workforce will comprise >95% Mongolia local standards personnel • Life of Mine rehabilitation strategy being • Support of local communities by cr

  22. Slide 22: Rare earths demand growth

    22 Rare earths demand growth For personal use only Global Demand and 2021 2028 Domestic Consumption of REE REE Usage REE Usage Source: Statistica April 2022

  23. Slide 23: Supply vs Demand

    22 3 Supply vs Demand For personal use only Significant REE supply NdPr SxD Forecasts (April 2022) imbalance from 2025

  24. Slide 24: NdPr Price Growth

    23 4 NdPr Price Growth For personal use only Source: Mkango, Canaccord August 2022

  25. Slide 25: Proposed Transaction & Corporate Overview

    For personal use only Proposed Transaction & Corporate Overview 25

  26. Slide 26: Corporate & Transaction Structure

    26 Khotgor Minerals – Temarise Limited – Parabellum (PBL) Corporate & Transaction Structure For personal use only KHOTGOR REE PROJECT TEMARISE LIMITED PARABELLUM RESOURCES LIMITED & EXISTING OWNERSHIP OPTION TO ACQUIRE 80% KHOTGOR TEMERISE LIMITED PROJECT BY ENTERING INTO AN 80/20 SUBSCRIPTION AGREE

  27. Slide 27: Corporate overview

    27 Corporate overview For personal use only Share price performance Shareholder composition1 $0.45 2,500,000 Volume PBL A$ Share Price $0.40 $0.35 2,000,000 $0.30 Retail 1,500,000 $0.25 36% $0.20 $0.15 1,000,000 56% FO / HNW / Institutional $0.10 500,000 $0.05 8% $- - Directors / Management ~$22 $16

  28. Slide 28: Use of funds – 12-month outlook

    28 Use of funds – 12-month outlook For personal use only The Company’s proposed use of funds over the next 12 months are outlined in the following table: Projects Development Expenditure (AUD) Exploration Expenditure (AUD) Khotgor – Scoping study $2,600,000 Khotgor – Infill/Metallurgical drill progr

  29. Slide 29: Board of Directors

    29 Board of Directors For personal use only MARK HOHNEN PETER RUSE Non-Executive Chairman Non-Executive Director Mark Hohnen has significant experience in the mineral Peter Ruse is a finance professional with over 15 years’ experience in Equity Funds Management and Private/ Institutional resource se

  30. Slide 30: Management

    30 Management For personal use only PETER SECKER Ms BATTUYA GANKHUYAG MARK ARUNDELL Proposed Executive & Technical consultant Country Manager – Mongolia Chief Geologist/Project Manager, NSW Peter Secker is a Mining Engineer with over 40 Ms Battuya Gankhuyag has over 15 years of Mark Arundell is a hi

  31. Slide 31: A Rare Investment Proposition to create Shareholder Value

    31 A Rare Investment Proposition to create Shareholder Value For personal use only One of the world’s largest rare earth deposits Focus on NdPr mineral suite NdPr market size will grow over next 5 years as renewable energy demand increases at 9% CAGR RRE basket price has increased significantly in l

  32. Slide 32: For personal use only

    For personal use only 52 Ord Street, West Perth, WA 6005 parabellumresources.com.au info@parabellumresources.com.au @ParabellumRes ASX:PBL 32

  33. Slide 33: Australian Copper projects

    For personal use only Australian Copper projects 33

  34. Slide 34: Australian Copper Projects: Location & Overview

    34 Australian Copper Projects Location & Overview For personal use only PBL’s Australian focus is on exploring for copper and gold deposits within the Lachlan Fold Belt in central NSW NSW is a Tier 1 mining and exploration jurisdiction with world class infrastructure Multiple copper and gold mines i

  35. Slide 35: An exciting suite of copper-gold opportunities

    35 An exciting suite of copper-gold opportunities For personal use only PBL’s four Australian copper assets have outstanding potential in an under- explored though highly prospective copper province Targeting massive sulphide (Besshi-type) copper mineralisation in rocks of the Girilambone Group in W

  36. Slide 36: Redlands & Whitbarrow Projects

    Redlands & 36 Whitbarrow Projects For personal use only Redlands and Whitbarrow are located along strike from Aeris Resources’ Constellation deposit (I&I resource of 3.3mt at 1.4% Cu, 0.3g/t Au, 1.7 g/t Ag) 3 and Kurrajong discovery, and is contiguous with Aeris’ operating Tritton and Murrawombie mi

  37. Slide 37: Lunns Dam Project

    37 Lunns Dam Project For personal use only Lunns Dam is along strike from Locksley Resources (ASX:LKY) Tottenham Project Airborne EM completed over the Lunns Dam Project area has delineated two high ranking anomalies - L1 and L4. Follow up ground EM has been designed and is scheduled to be completed

  38. Slide 38: Obley Project

    38 Obley Project For personal use only Multiple historic workings at Obley including Beehive, Coppermine Gully and Naroo Pits All copper-gold skarn prospects associated with distinct magnetic high within Cuga Burga Volcanics at contact zone of Yeoval Granite Follow up soil sampling of the three cohe

  39. Slide 39: Thank you