Jameson Resources Limited · ASX:JAL

Jameson Resources — PDAC 2014

22 slides from Jameson Resources's conference presentation, Feb 25, 2014

  1. Slide 1: Investor Presentation PDAC Toronto, March 2014

    For personal use only INVESTOR PRESENTATION PDAC Toronto, March 2014

  2. Slide 2: Financial Snapshot

    Financial Snapshot For personal use only Share Capital Price Volume Chart Share Price (February 24th, 2014) A$0.23 Shares Outstanding 190m Market Capitalisation A$43m Trading Range (6 month) A$0.19 to A$0.28 Cash Reserves Cash (February 10th 2014) A$4.8m Options and Exchangeable Shares Options (A$0.

  3. Slide 3: Highly Experienced Management Team

    Highly Experienced Management Team For personal use only David Fawcett ‐ Chairman • Mining engineer with over 37 years coal experience in western Canada • Proven track record for initiating and advancing new coal mine development • CANADA Awarded the 2012 AMEBC Coal Award for Excellence in Mine Deve

  4. Slide 4: Few Coking Coal Basins have Export Potential

    Few Coking Coal Basins have Export Potential For personal use only MONGOLIA KYRGYZ REPUBLIC RUSSIA WESTERN CANADA • ASX Companies: AKM, GUF • ASX Companies: CLA • ASX Companies: TIG • ASX Companies: JAL , ATU (anthracite) • 11 Mtpa overland exports • No exports • 15 Mtpa seaborne exports • 28 Mtpa s

  5. Slide 5: Strategic Location

    Crown Mountain – Strategic Location For personal use only • The Elk Valley and Crowsnest coal fields offer compelling global opportunities for development of a coking coal project • Teck is the world’s second largest seaborne supplier of metallurgical coal, based on its mines in the Elk Valley and C

  6. Slide 6: Rail to Port

    Crown Mountain – Rail to Port For personal use only No capacity constraints on rail networks and ports currently undergoing expansion RAIL • Common user railway linking southeast BC to deep water ports in Vancouver: distance to port 1,192km • A new rail siding will be constructed adjacent to the rai

  7. Slide 7: Geology and Resources

    Crown Mountain – Geology and Resources For personal use only DOMAIN Measured Indicated Meas/Ind Inferred (Mt) (Mt) (Mt) (Mt) North Block 7.9 7.1 15.0 0.0 South Block 51.3 0.0 51.3 0.0 Southern Extension 0.0 0.0 0.0 23.7 TOTAL 59.2Mt 7.1Mt 66.3Mt 23.7Mt 7

  8. Slide 8: Preliminary Economic Assessment

    Crown Mountain – Preliminary Economic Assessment For personal use only PRELIMINARY ECONOMIC ASSESSMENT ‐ Key Attributes Recoverable Raw tonnes 76 Mt (84%) Strip Ratio (Raw Coal) 4.3:1 Production Capacity 1.3 to 1.9 Mtpa Potential Mine Life 24 years Expected product 90% high quality coking CAPEX ¹ $1

  9. Slide 9: Mine Advance

    Crown Mountain – Mine Advance • For personal use only Low cost surface mining methods with raw strip ratio of 4.3:1 BCM/tonne which is significantly lower than Teck • Surface mine development will use truck/excavator methods; mining conditions at Crown Mountain will be similar to those at the nearby

  10. Slide 10: Exploration Program 2013

    Crown Mountain – Exploration Program 2013 For personal use only • Exploration drilling program to better define coal quality and washability completed ahead of schedule and under budget • Program focused on North and South Blocks and included seven large diameter core holes (150mm) and six reverse c

  11. Slide 11: Laboratory Flow Sheet

    Crown Mountain – Laboratory Flow Sheet For personal use only Lab – Receives Apparent Density, SG, Incremental Core Ash, Moisture, Sulphur Sample of Coal and Partings Composite Core Sample & Air Dry SIZE FRACTION DROP SHATTER Dry Screen Analysis @ Dry and Wet Tumbler ANALYSIS TEST 50,25,13,6,2,1,1x0m

  12. Slide 12: Coal Quality

    Crown Mountain – Coal Quality • For personal use only Initial laboratory results from all large diameter core holes have been received • Washability recovery, which directly correlates to plant yield once adjustments are made for out‐of‐seam dilution and pit loss, continues to be higher than expecte

  13. Slide 13: Coking Coal Parameters and Competitor Specifications

    Coking Coal Parameters and Competitor Specifications For personal use only Coal Quality Parameter Crown Mountain1 General Specs ‐ Global South East BC Total Moisture % (arb) TBD2 Max 10 8‐9 Ash % (db) 8.74 Max 10 8.5 ‐ 9.6 Volatile Matter % (db) 20.85 17 ‐ 35 21 ‐ 27 Sulphur % (db) 0.58 < 1 (typ 0.6

  14. Slide 14: Environmental Studies

    Crown Mountain – Environmental Studies For personal use only • Environmental baseline studies are well advanced with the BC MOE required two year monthly water sampling and quality test work scheduled for completion in April 2014 • Hydrologic studies, including the installation of several down‐hole

  15. Slide 15: Timeline

    Crown Mountain – Timeline For personal use only 2013 2014 2015 ACTIVITY Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Resource Estimate  Preliminary Economic Assessment   Exploration – LDC & RC Drilling program  Coal Quality Testwork  Pre‐Feasibility Study  Project Description / Terms of Reference EA / Permittin

  16. Slide 16: Peace River Projects – Strategic Location

    Peace River Projects – Strategic Location For personal use only • 100% ownership of Dunlevy, Carbon East, Peace Reach and Graham River projects within the Peace River coal field • Projects along strike from operating coal mines and a number of resource projects under exploration and feasibility • Lo

  17. Slide 17: Dunlevy – Approvals and Work Program Update

    Dunlevy – Approvals and Work Program Update For personal use only • Two licenses comprising 2,626 Hectares have been granted. • All proposed drill sites fall within the approved tenure • Drilling expected to commence in March/April pending Notice of Work approval • Exploration program will establish

  18. Slide 18: Dunlevy – Priority Target Area

    Dunlevy – Priority Target Area For personal use only Approximate Location of Upper Seams; Lower Seam(s) Are Projected to be ~200 m Below Upper Seams 18

  19. Slide 19: Summary

    Summary For personal use only POSITIONED IN WORLD CLASS Jameson is a pure coking coal Company and owns coal projects within Canada’s prolific METALLURGICAL FIELDS Elk Valley and Peace River coking coal fields Quality projects located proximal to road network and an extensive rail system linking PROX

  20. Slide 20: Contact details

    For personal use only www.jamesonresources.com.au AUSTRALIAN OFFICE (Corporate) CANADIAN OFFICE Level 2, 79 Hay Street Suite 800, 1199 West Hastings Street Subiaco, WA 6008 Vancouver, BC V6E 3 T5 T: +61 (8) 9200 4473 T: +1 (604) 629‐8605 E: admin@jamesonresources.com.au

  21. Slide 21: Disclaimer

    Disclaimer For personal use only This document has been prepared as a summary only, and does not contain all information about the Jameson Resources Limited’s (the “Company”) assets and liabilities, financial position and performance, profits and losses, prospects and the rights and liabilities atta

  22. Slide 22: Competent Persons Statements

    Competent Persons Statements For personal use only PRELIMINARY ECONOMIC ASSESSMENT The information in this presentation that relates to the preliminary economic assessment is based on information compiled by Mr. Keith Wilson P. Eng., who is a Member of a Recognised Overseas Professional Organisation

Jameson Resources — PDAC 2014 on 6ix