Atalaya Mining Copper Sa · LSE:ATYM

Atalaya Mining Copper Sa — Atalaya Mining — Canaccord Genuity Annual Global Metals & Mining Conference 2025

69 slides from Atalaya Mining Copper Sa's conference presentation, May 2025

  1. Slide 1: European copper producer with operations in Spain

    European copper producer with operations in Spain Canaccord Genuity Annual Global Metals & Mining Conference May 2025

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document (“Presentation”) has been prepared by Atalaya Mining (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers give

  3. Slide 3: Disclaimer: Technical Disclosure

    Disclaimer: Technical Disclosure Technical Disclosure – Proyecto Riotinto Unless otherwise noted, all scientific and technical information relating to Proyecto Riotinto is based on and derived from a Competent Persons Report (CPR) entitled “An Independent Competent Persons Report on the Mineral Asse

  4. Slide 4: Atalaya Overview

    ATALAYA MINING > Atalaya Overview

  5. Slide 5: Atalaya Snapshot

    Atalaya Snapshot European copper producer with operations in Spain Ticker . Operations Asset locations ATYM Riotinto District TOURO LSE Main Market 15 Mtpa processing plant FTSE 250 Index Cerro Colorado mine SPAIN constituent San Dionisio deposit MADRID San Antonio deposit OSSA MORENA Proyecto Masa

  6. Slide 6: Operating Performance

    Operating Performance Stable copper producer following the delivery of multiple expansions Throughput (Mt) Copper Production (kt) 6

  7. Slide 7: Illustrative Production Potential

    Illustrative Production Potential Growth driven by higher grades at Riotinto and potential Touro development Copper Equivalent Production (kt)(1)(2) 1. Recovered metal in concentrate. 2. Copper Equivalent production is calculated from results presented in the 2023 Riotinto PEA and based on $3.50/lb

  8. Slide 8: Our Journey

    ATALAYA MINING > Our Journey

  9. Slide 9: Iberian Pyrite Belt

    Iberian Pyrite Belt World class minerals district Riotinto Masa Valverde 9

  10. Slide 10: Riotinto District

    Riotinto District World class regional infrastructure 10

  11. Slide 11: Regional Infrastructure

    Regional Infrastructure Access to the critical inputs required for modern and sustainable operations $/t Copper Production Villages Fresh water reservoirs Current TSF Transmission line Planned future TSF NOT REQUIRED: Fresh water reservoir • Labour camps • Fly-in fly-out Villages • Desalination • Pi

  12. Slide 12: Atalaya Team Track Record

    Atalaya Team Track Record Strong experience in permitting, financing and constructing major projects Aguablanca (Ni, Cu) El Valle-Boinás (Au, Cu) Mutanda (Cu, Co) Tasiast (Au) 12

  13. Slide 13: Proyecto Riotinto: 2014 vs. Today

    Proyecto Riotinto: 2014 vs. Today Original Gyratory Crusher – 2014 New Jaw Crusher – Today 13

  14. Slide 14: Proyecto Riotinto: 2014 vs. Today

    Proyecto Riotinto: 2014 vs. Today Original Mills – 2014 New Mills – Today 14

  15. Slide 15: Proyecto Riotinto: 2014 vs. Today

    Proyecto Riotinto: 2014 vs. Today Original Flotation Circuit – 2014 New Flotation Circuit – Today 15

  16. Slide 16: Riotinto Today

    Riotinto Today Modern and large-scale operation well-positioned for future growth 16

  17. Slide 17: Riotinto Operating & Funding History

    Riotinto Operating & Funding History Re-start & expansions delivered with low capex intensity & limited equity dilution Expansion History and Throughput (Mt) Re-start – 5.0 Mtpa Expansion to 9.5 Mtpa Expansion to 15.0 Mtpa Executed: 2015 Executed: 2016 Executed: 2019 Capex: US$82m Incremental Capex:

  18. Slide 18: Cash Flow History

    Cash Flow History Strong operating cash flow has funded historical capex and the dividend policy Aggregate Cash Flows 2014 – 2024 (€m) 18

  19. Slide 19: Riotinto District

    ATALAYA MINING > Riotinto District

  20. Slide 20: Riotinto Site Layout

    Riotinto Site Layout Multiple deposits and modern 15 Mtpa processing plant Cerro Colorado San Antonio Open pit: 156.6 Mt Underground: 11.8 Mt Riotinto Processing Plant (M&I) 0.37% Cu (Inferred) 1.32% Cu, 1.79% Zn Capacity: >15 Mtpa San Dionisio Open pit: 56.1 Mt (M&I) 0.91% Cu, 1.14% Zn Underground:

  21. Slide 21: Riotinto Deposits

    Riotinto Deposits Adjacent deposits are expected to be mined concurrently Long Section San Dionisio Cerro Colorado San Antonio CuSW Mineralised material PolyMS CuSW PolyMS Open pit Mining method Underground Open pit Underground Legend Copper grade 0.00 – 0.139% 0.14 – 0.199% 0.20 – 0.499% 0.50 – 0.9

  22. Slide 22: San Dionisio

    San Dionisio Expected to contribute higher-grade material to supplement mill feed February 2025 Copper Resource Grade (M&I) 22

  23. Slide 23: Highway Relocation Plans

    Highway Relocation Plans Allows for Cerro Colorado and San Dionisio pit expansions ▪ Highlight ▪ Diagram of design? New path of Highway A-461 Existing San Dionisio highway Cerro Colorado 23

  24. Slide 24: Highway Relocation Progress

    Highway Relocation Progress February 2025 24

  25. Slide 25: Riotinto TSF

    Riotinto TSF Current authorisations allow for production beyond 2030 25

  26. Slide 26: Potential Future Processing Hub

    Potential Future Processing Hub ATYM’s 15 Mtpa mill could become a processing hub – similar to MATSA model Key Operations in the Iberian Pyrite Belt Magdalena Aguas Teñidas Cerro Colorado San Dionisio San Antonio Riotinto East MATSA (Sandfire) Sotiel 29 km Riotinto District Masa Valverde / Majadales

  27. Slide 27: Proyecto Masa Valverde (PMV)

    Proyecto Masa Valverde (PMV) Fully permitted satellite deposit 29 km 27

  28. Slide 28: Regulatory Approval

    Regulatory Approval Granting of key permits highlights that Andalucía is a world-class mining jurisdiction Overview AAU, Exploitation and Water Permits ▪ In March 2023, Atalaya was granted the Unified Environmental Authorisation (or in Spanish, Autorización Ambiental Unificada ("AAU")) by the Junta

  29. Slide 29: PMV: Access Ramp

    PMV: Access Ramp Ramp works to begin in coming months; initial focus on high grade copper zone Wireframes of Mineralised Zones Planned Ramp Access for MV and MJ 29

  30. Slide 30: E-LIX

    ATALAYA MINING

  31. Slide 31: E-LIX Phase I Plant

    E-LIX Phase I Plant Commissioning in progress; expected to unlock significant value Illustrative Recoveries 31

  32. Slide 32: E-LIX Phase I Plant

    E-LIX Phase I Plant Commissioning & ramp-up continue; novel leaching section is performing well Copper precipitate Zinc precipitate Copper cathode Zinc cathode Copper pregnant leach solution 32

  33. Slide 33: E-LIX: Initial Operating Strategy

    E-LIX: Initial Operating Strategy Recovery of zinc from existing saleable copper concentrate Conventional Flotation Only E-LIX Application #1 Ore type(1) CuSW CuSW 85% Cu 85% Cu Recovery 60% Zn Unchanged: 60% Zn No modifications are required at 100 kt existing 100 kt processing plant Illustrative Co

  34. Slide 34: E-LIX: Future Operating Strategy

    E-LIX: Future Operating Strategy Potential to apply E-LIX to complex ores throughout the IPB and beyond Conventional Flotation Only E-LIX Application #2 Ore type(1) PolyMS PolyMS Higher recoveries 80% Cu Facilitates Recovery 60% Cu 75% Zn by producing a conversion of bulk concentrate 85% Zn Resource

  35. Slide 35: Proyecto Touro

    ATALAYA MINING > Proyecto Touro

  36. Slide 36: Proyecto Touro

    Proyecto Touro Past producing mine and currently operating as an aggregate quarry 36

  37. Slide 37: Touro: Location

    Touro: Location World class infrastructure 37

  38. Slide 38: Touro: Water Treatment Plant

    Touro: Water Treatment Plant Addressing legacy water runoff issues 38

  39. Slide 39: Water Treatment Plant Impact

    Water Treatment Plant Impact Ongoing river restoration August 2021 – Lañas River May 2023 – Lañas River 39

  40. Slide 40: Strategic Industrial Project Status

    Strategic Industrial Project Status Proyecto Touro was awarded strategic project status on 24 June 2024 Overview Legislation Objectives ▪ In Galicia, a project can be awarded the status of ▪ To attract and promote new national and strategic industrial project (or proxectos international investment i

  41. Slide 41: Touro: Stakeholder Engagement

    Touro: Stakeholder Engagement Public consultation has completed; support for the project has been strong 41

  42. Slide 42: Touro: Positive Attributes

    Touro: Positive Attributes Low capital intensity and good ore characteristics to drive strong economics Touro(1) Riotinto Copper Production ktpa ~30 50+ Initial Capex US$m $250 – 300 Capex Intensity US$/t produced <$10,000 Strip Ratio w:o ~2.0 ~2.2 Copper Grade ~0.42% 0.37% Copper Recovery ~90% ~85%

  43. Slide 43: 2025 Outlook

    ATALAYA MINING > 2025 Outlook

  44. Slide 44: Q1 2025 Production Results

    Q1 2025 Production Results Strong start to 2025 with best quarter of production since Q2 2021 Copper production Ore Throughput (Mt) 14,291 tonnes Cu 10,666 tonnes Cu | Q1 2024 Throughput & recoveries 4.2 Mt ore processed 0.42% Cu grade Copper Recovery 3.7 Mt | Q1 2024 0.34% | Q1 2024 80.98% Cu recov

  45. Slide 45: 2025 Guidance

    2025 Guidance Lower cash cost and further investments in higher grade deposits Operational Guidance ▪ Production Ore mined Mt 15 – 16 ‒ Start to 2025 has been encouraging Waste mined (1) Mt 37 – 43 ‒ Guidance is weighted slightly Ore processed Mt 15.5 – 15.8 towards H1 2025 Copper grade 0.38 – 0.42%

  46. Slide 46: Key Activities for 2025

    Key Activities for 2025 San Dionisio: Environmental authorisation approved; stripping activities continue Masa Valverde: Start development of access ramp Touro: Advance permitting process under Galicia’s strategic industrial project legislation E-LIX: Finalise commissioning and ramp-up 50MW solar pl

  47. Slide 47: Conclusion

    ATALAYA MINING > Conclusion

  48. Slide 48: Conclusion

    Conclusion ▪ MAP 48 – 52 kt copper production $721m Enterprise Value ▪ ASSETS 2025 guidance Equivalent to ~$14,000/t copper production >100 ktpa CuEq potential from existing projects €38m net cash No streams or royalties Low risk growth drivers: ‒ Higher grades ‒ Satellite deposits €78m dividends de

  49. Slide 49: 2024 Annual Results

    ATALAYA MINING > 2024 Annual Results

  50. Slide 50: Review of FY2024

    Review of FY2024 Transition year lays the foundation for key project catalysts in 2025 ‒ Copper production of 12.1 kt in Q4 2024 and 46.2 kt in FY2024, due to lower grades and recoveries ‒ Cash Cost of $2.79/lb in Q4 2024 and $2.92/lb in FY2024, with good control of absolute costs Operating ‒ AISC o

  51. Slide 51: FY2024 Highlights

    FY2024 Highlights Several key accomplishments and many important catalysts ahead Works in progress… ▪ San Dionisio final permits ▪ Masa Valverde access ramp construction ▪ Touro environmental approval ▪ E-LIX ramp-up ▪ Solar plant full capacity ▪ Exploration, including new Swedish earn-in 51

  52. Slide 52: Sustainability Highlights

    Sustainability Highlights Improving performance highlights Atalaya’s commitment to sustainability ▪ Atalaya continues to make progress towards achieving greater sustainability across its business activities ‒ We look forward to further improvements in the years ahead ▪ For further information, pleas

  53. Slide 53: Q4 2024 Production Results

    Q4 2024 Production Results Positive finish to 2024, paving the way for an active 2025 across the portfolio Copper production Ore Throughput (Mt) 12,078 tonnes Cu 12,775 tonnes Cu | Q4 2023 Throughput & recoveries 3.8 Mt ore processed 0.41% Cu grade Copper Recovery 4.1 Mt | Q4 2023 0.36% | Q4 2023 78

  54. Slide 54: Q4 2024 Financial Results

    Q4 2024 Financial Results Revenue impacted by increase in concentrate inventories Income statement highlights Revenues (€m) Revenue: €77.9m Op. costs: €(65.2)m €85.6m | Q4 2023 €(71.7)m | Q4 2023 EBITDA: €12.7m Profits: €14.9m(1) €13.9m | Q4 2023 €5.2m | Q4 2023 Cash flow statement highlights EBITDA

  55. Slide 55: FY2024 Financial Results

    FY2024 Financial Results Cash flow generation supported balance sheet during period of investment Income statement highlights Revenue: €326.8m Op. costs: €(260.4)m €340.3m | FY2023 €(267.2)m | FY2023 EBITDA: €66.4m Profits: €32.6m(1) €73.1m | FY2023 €36.7m | FY2023 Cash flow statement highlights Ope

  56. Slide 56: Cash Costs & AISC Breakdown

    Cash Costs & AISC Breakdown Good control of absolute costs helped to offset impact of lower production $/lb Copper Payable Q4 2024 Q4 2023 FY2024 FY2023 ▪ Good control of absolute costs Mining 1.05 0.92 1.07 0.86 ‒ Prices of key Processing 0.88 0.84 0.90 0.89 consumables Other site operating costs 0

  57. Slide 57: AISC Benchmarking

    AISC Benchmarking ATYM cost positioning is competitive vs. notable copper producer peers Reported AISC (US$/lb) Atalaya 29Metals Capstone First Quantum Constancia Copper Mountain Candelaria Neves-Corvo Lumwana Zaldívar (Hudbay) (now Hudbay) (Lundin) (Lundin) (Barrick) (Antofagasta / Barrick) Source:

  58. Slide 58: Appendix

    ATALAYA MINING > Appendix

  59. Slide 59: Key Information

    Key Information Capitalisation Share Price Performance (GBp) Ticker - LSE: Main Market ATYM Share price (12-May-25) GBp 411.5 Basic shares m 140.8 Fully-diluted shares m 146.2 Market capitalisation (basic) £m 579 Market capitalisation (basic) US$m $763 Cash (at 31-Mar) €m 70 Debt (at 31-Mar) €m 32 E

  60. Slide 60: Earn-in Agreements in Sweden

    Earn-in Agreements in Sweden Opportunity to enter prospective mining districts with an experienced partner ▪ In November 2024, Atalaya announced agreements with Mineral Prospektering i Sverige AB ("MPS“) whereby Atalaya can earn initial 75% interests in the Skellefte Belt and Rockliden projects ‒ Su

  61. Slide 61: Electricity Prices in Spain

    Electricity Prices in Spain Stability has returned to market electricity prices Spot Market + Adjustment in Spanish System (€/MWh)(1)(2) 1. Source: OMI, Polo Español S.A. (OMIE), day-ahead operations program 2. Since 15-Jun-2022, includes daily adjustment mechanism related to legislated gas cap 61

  62. Slide 62: Dividend History

    Dividend History Policy seeks to balance capital returns, growth projects and financial strength Dividend Payments ▪ Inaugural dividend Dividend Announced US$ GBP EUR US$ GBP EUR declared in 2021 per sh per sh per sh m m m Inaugural 27-Oct-21 0.3950 0.294 0.345 54.6 40.6 47.3 ▪ Formal dividend polic

  63. Slide 63: Copper Market Balance

    Copper Market Balance Market is largely balanced despite rapid new supply from high grade DRC mines Copper Supply and Demand (Mt) Source: ICSG 63

  64. Slide 64: Copper Supply: Challenges

    Copper Supply: Challenges A new top 5 copper mine is required every single year to meet demand growth Annual Copper Requirement vs. Top 10 Copper Mines (kt) Source: ICSG 64

  65. Slide 65: Case Study: Grade Decline

    Case Study: Grade Decline BHP capex programme of $10 – 14 bn is required offset production decline BHP Chile Expected Copper Production Contemplated Capital Projects Escondida Copper Grade $10 – 14 bn is IRRs are required to offset calculated production at $4.50/lb decline copper Source: BHP 65

  66. Slide 66: Reserves and Resources

    Reserves and Resources Attributable Grade Contained Metal Contained Metal Asset Ownership Tonnage Cu Zn Pb Au Ag Cu Zn Pb Au Ag CuEq Cu CuEq Notes Mt g/t g/t Mt Mt Mt Moz Moz Mt Mt Mt Cerro Colorado 100% Reserves 132.0 0.37% - - - - 0.5 - - - - 0.5 0.5 0.5 M&I 156.6 0.37% 0.15% 0.03% - - 0.6 0.2 0.0

  67. Slide 67: Senior Management

    Senior Management Decades of operations, project development and financial expertise Alberto Lavandeira César Sánchez Enrique Delgado Chief Executive Officer, Director Chief Financial Officer Operations – General Manager, Proyecto Riotinto Over 40 years’ experience Former CFO of companies in Former

  68. Slide 68: Board of Directors

    Board of Directors Mining, capital markets, sustainability and finance expertise Non-Executive Over 30 years’ experience investing in mining and oil and gas companies. From 2010-2020, was a Managing Director at J.P. Neil Chair of the Morgan Asset Management. Before that, from 1990-2009, was Head of

  69. Slide 69: Atalaya Mining Copper, S.A. Investor Relations