Atalaya Mining Copper Sa · LSE:ATYM

Atalaya Mining Copper Sa — Atalaya Mining — RBC Global Mining & Materials Conference 2026

40 slides from Atalaya Mining Copper Sa's conference presentation, June 2026

  1. Slide 1: European copper producer with operations in Spain

    European copper producer with operations in Spain RBC Global Mining & Materials Conference June 2026

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document (“Presentation”) has been prepared by Atalaya Mining (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers give

  3. Slide 3: Disclaimer: Technical Disclosure

    Disclaimer: Technical Disclosure Technical Disclosure – Proyecto Riotinto Mineral Resources and Ore Reserves for the Cerro Colorado and San Dionisio deposits (stockwork material) are effective 30 June 2025 and were prepared by SRK Consulting (UK) Limited. The Reporting Standard adopted for reporting

  4. Slide 4: Introduction

    ATALAYA MINING > Introduction

  5. Slide 5: Atalaya Snapshot

    Atalaya Snapshot European copper producer with operations in Spain Ticker . Operations Asset locations ATYM Riotinto District TOURO LSE Main Market 15 Mtpa processing plant FTSE 250 Index Cerro Colorado mine SPAIN constituent San Dionisio deposit MADRID San Antonio deposit OSSA MORENA Proyecto Masa

  6. Slide 6: Operating Performance

    Operating Performance Stable copper producer following the delivery of multiple expansions Throughput (Mt) Copper Production (kt) (1) 1. Low end 6

  7. Slide 7: Q1 2026 Financial Results

    Q1 2026 Financial Results

  8. Slide 8: Review of Q1 2026

    Review of Q1 2026 Good financial performance to begin 2026 despite lower production ‒ Copper production of 9.9 kt, which was impacted by unfavourable weather ‒ Cash Costs of US$2.52/lb and AISC of US$3.20/lb, which are consistent with FY2026 cost guidance Operating despite lower copper production ‒

  9. Slide 9: Q1 2026 Production Results

    Q1 2026 Production Results Well positioned for future growth despite recent weather events Copper production Ore Throughput (Mt) 9,939 tonnes Cu 14,291 tonnes Cu | Q1 2025 Throughput & recoveries 4.1 Mt ore processed 0.30% Cu grade Copper Recovery 4.2 Mt | Q1 2025 0.42% | Q1 2025 81.54% Cu recovery

  10. Slide 10: Q1 2026 Financial Results

    Q1 2026 Financial Results Good financial performance to begin 2026 despite lower production Income statement highlights Revenues (€m) Revenue: €117.3m Op. costs: €(69.2)m €130.7m | Q1 2025 €(78.2)m | Q1 2025 EBITDA: €48.0m Profits: €28.3m €52.5m | Q1 2025 €30.5m | Q1 2025 Cash flow statement highlig

  11. Slide 11: Cash Costs & AISC Breakdown

    Cash Costs & AISC Breakdown Q1 2026 costs are consistent with full year guidance despite lower production US$/lb Copper Payable Q1 2026 Q1 2025 FY2025 FY2024 ▪ Cash Costs and AISC were impacted Mining 1.31 0.85 1.01 1.07 by lower production, but Processing 1.10 0.80 0.85 0.90 remain consistent Other

  12. Slide 12: AISC Benchmarking

    AISC Benchmarking ATYM cost positioning is competitive vs. notable copper producer peers Reported AISC (US$/lb) Atalaya 29Metals Capstone First Quantum Constancia Copper Mountain Candelaria Caserones Neves-Corvo Lumwana Zaldívar (Hudbay) (now Hudbay) (Lundin) (Lundin) (now Boliden) (Barrick) (Antofa

  13. Slide 13: 2026 Guidance

    2026 Guidance Minor impact from Q1 2026 production; potential for Middle East cost impact Operational Guidance ▪ Production Ore mined Mt 15.5 – 16.0 ‒ Heavy rainfall in late January / early February 2026 impacted Q1 2026 copper production Waste mined (1) Mt 38 – 44 ‒ Portion of production shortfall

  14. Slide 14: Strategic Focus

    ATALAYA MINING > Strategic Focus

  15. Slide 15: San Dionisio Deposit

    San Dionisio Deposit Stripping underway and expected to deliver higher-grade feed to the plant May 2026 Copper Resource Grade (M&I)(1) Waste stripping at San Dionisio is expected to be 19 – 23 Mt in 2026E Note: CuSW = copper stockwork; PolyMS = polymetallic massive sulphide 1. Per 2025 Annual Report

  16. Slide 16: Proyecto Masa Valverde

    Proyecto Masa Valverde Planned access ramp to allow for initial exploitation of copper zone(1) 3D View Looking Southwest Access ramp development expected to be completed over 2 – 3 years at a cost of ~€30 – 40m(2) 1. Access ramp development is subject to final Board approval 2. Atalaya management es

  17. Slide 17: Atalaya's Polymetallic Resources

    Atalaya’s Polymetallic Resources Significant resource base of higher-grade material near existing infrastructure Atalaya Resources in the Riotinto District(1)(2)(3)(4) Resources that could be exploited through the development of a polymetallic circuit 1. Cerro Colorado and San Dionisio O/P CuSW per

  18. Slide 18: Riotinto Polymetallic Circuit

    Riotinto Polymetallic Circuit Expected to enhance operational flexibility and treat higher-grade material Riotinto Processing Plant: Modifications and Future Flowsheet Development of a polymetallic circuit would involve relatively simple modifications to the existing processing plant at Riotinto Exi

  19. Slide 19: Resource Definition and Growth

    Resource Definition and Growth Focus is on increasing resource confidence and making new discoveries Key Projects ▪ Polymetallic deposit located ~1 km east of the Cerro Colorado pit ▪ Current inferred resource San Antonio ‒ 11.8 Mt at 1.32% Cu, 1.79% Zn, 0.99% Pb ▪ Near-term focus: ‒ Further infill

  20. Slide 20: Mining Policy in Galicia

    Mining Policy in Galicia Increasing focus on the responsible development of critical minerals resources 20

  21. Slide 21: Touro: Early Works

    Touro: Early Works Engineering works to enable rapid project execution once final permits received Conceptual Touro Processing Plant Design 21

  22. Slide 22: Touro: Path to Multi-Asset Future

    Touro: Path to Multi-Asset Future Competitive capital intensity & favourable characteristics to support economics Touro(1) Riotinto(2) Copper Production ktpa ~30 50+ Initial Capex US$m ~$250 – 300 Capex Intensity US$/t produced <$10,000 Strip Ratio w:o <2.0 ~2.1 Copper Grade ~0.42% 0.37% Copper Reco

  23. Slide 23: Atalaya's Growth Objectives

    Atalaya’s Growth Objectives Portfolio of growth projects provide a pathway up to 100 ktpa CuEq production Annual Copper Equivalent Production (kt)(1)(2)(3) Masa Valverde polymetallic Riotinto East San Dionisio Copper Ossa Morena (4) Masa Valverde Copper Riotinto polymetallic MPS earn-in Copper | Zin

  24. Slide 24: Appendix

    ATALAYA MINING > Appendix

  25. Slide 25: Why Invest in Atalaya?

    Why Invest in Atalaya? ▪ MAP Established European copper producer with attractive scale ▪ ASSETS ‒ Leading copper “pure play” listed in London and FTSE 250 constituent ‒ 2026 production guidance of 50 – 54 kt Cu (1) Significant growth potential ‒ Portfolio of low-risk projects providing a pathway up

  26. Slide 26: Key Information

    Key Information Capitalisation Share Price Performance (GBp) Ticker - LSE: Main Market ATYM Share price (04-Jun-26) GBp 841.5 Basic shares m 153.8 Fully-diluted shares m 160.5 Market capitalisation (basic) £m 1,294 Market capitalisation (basic) US$m $1,736 Cash (at 31-Mar) €m 280 Debt (at 31-Mar) €m

  27. Slide 27: Electricity Prices in Spain

    Electricity Prices in Spain Stability has returned to market electricity prices Spot Market + Adjustment in Spanish System (€/MWh)(1)(2) 1. Source: OMI, Polo Español S.A. (OMIE), day-ahead operations program 2. Since 15-Jun-2022, includes daily adjustment mechanism related to legislated gas cap 27

  28. Slide 28: Riotinto Solar Plant

    Riotinto Solar Plant Reducing Atalaya’s carbon footprint and processing costs February 2025 Electricity Sources(1) 1. Upon completion of solar plant’s 2nd phase 28

  29. Slide 29: Proyecto Touro: Background

    Proyecto Touro: Background Past producing mine located in a region with high quality infrastructure 29

  30. Slide 30: Touro: Permitting Progress

    Touro: Permitting Progress Public support and “strategic” status following proactive engagement strategy ▪ In June 2024, the project was awarded the status of strategic industrial project (or proxectos industriais estratéxicos (“PIE”)) by the Xunta de Galicia ▪ In January 2025, the public consultati

  31. Slide 31: Iberian Pyrite Belt

    Iberian Pyrite Belt World class minerals district Riotinto Masa Valverde 31

  32. Slide 32: Riotinto District

    Riotinto District World class regional infrastructure 32

  33. Slide 33: Regional Infrastructure

    Regional Infrastructure Access to the critical inputs required for modern and sustainable operations $/t Copper Production Villages Fresh water reservoirs Current TSF Transmission line Planned future TSF NOT REQUIRED: Fresh water reservoir • Labour camps • Fly-in fly-out Villages • Desalination • Pi

  34. Slide 34: Proyecto Riotinto: 2014 vs. Today

    Proyecto Riotinto: 2014 vs. Today Original Mills – 2014 New Mills – Today 34

  35. Slide 35: Riotinto Operating & Funding History

    Riotinto Operating & Funding History Re-start & expansions delivered with low capex intensity & limited equity dilution Expansion History and Throughput (Mt) Re-start – 5.0 Mtpa Expansion to 9.5 Mtpa Expansion to 15.0 Mtpa Executed: 2015 Executed: 2016 Executed: 2019 Capex: US$82m Incremental Capex:

  36. Slide 36: Riotinto Deposits

    Riotinto Deposits Adjacent deposits are expected to be mined concurrently Long Section San Dionisio Cerro Colorado San Antonio CuSW Mineralised material PolyMS CuSW PolyMS Open pit Mining method Underground Open pit Underground Legend Copper grade 0.00 – 0.139% 0.14 – 0.199% 0.20 – 0.499% 0.50 – 0.9

  37. Slide 37: Reserves and Resources

    Reserves and Resources Attributable Grade Contained Metal Contained Metal Asset Ownership Tonnage Cu Zn Pb Au Ag Cu Zn Pb Au Ag CuEq Cu CuEq Notes Mt g/t g/t Mt Mt Mt Moz Moz Mt Mt Mt Cerro Colorado & San Dionisio O/P Cu 100% Reserves 132.0 0.40% - - - - 0.5 - - - - 0.5 0.5 0.5 Reserves at 0.16% Cu

  38. Slide 38: Senior Management

    Senior Management Decades of operations, project development and financial expertise Alberto César Fernando Fernando Lavandeira Sánchez Araúz de Robles Díaz Riopa Chief Executive Officer, Chief Financial Officer General Manager, General Manager, Director Proyecto Riotinto Proyecto Touro Over 40 year

  39. Slide 39: Board of Directors

    Board of Directors Mining, capital markets, sustainability and finance expertise Non-Executive Over 30 years’ experience investing in mining and oil and gas companies. From 2010-2020, was a Managing Director at J.P. Neil Chair of the Morgan Asset Management. Before that, from 1990-2009, was Head of

  40. Slide 40: Atalaya Mining Copper, S.A. Investor Relations

    Contacts: Atalaya Mining Copper, S.A. Alberto Lavandeira, CEO +34 959 59 28 50 info@atalayamining.com Investor Relations Michael Rechsteiner michael.rechsteiner@atalayamining.com

Atalaya Mining — RBC Global Mining & Materials Conference 2026 on 6ix