Tambourah Metals Ltd · ASX:TMB
Tambourah Metals — Australian Gold Conference 2024
24 slides from Tambourah Metals's conference presentation, Aug 27, 2024
Slide 1: Australian Gold Conference 2024
For personal use only Australian Gold Conference 2024 Tambourah Metals Ltd Mines & Money Connect Melbourne ASX: TMB 1 August 2024 tambourahmetals.com.au
Slide 2: Forward Looking Statements and Disclaimer
Forward Looking Statements and Disclaimer The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue, securities or other financial products The information contained in this presentation is not investment or finan
Slide 3: Introduction
For personal use only Introduction
Slide 4: Corporate Overview
Corporate Overview Rita Brooks • 30+ years’ experience in minerals exploration industry Executive Chairperson • Founding Director of gold and nickel explorer Berkeley Resources Ltd BA(Ed) • Director of several private companies and extensive experience across mineral exploration throughout Australia
Slide 5: Pilbara Region of Western Australia
Pilbara Region of Western Australia Tambourah Metals Gold and Lithium Projects Tambourah Project Locations – Pilbara Region For personal use only Tambourah Gold Cheela Gold Shaw River Tin-Tantalum-Lithium Coondina Tin & Rare Earths Russian Jack Lithium Haystack Well Lithium-Tantalum 5
Slide 6: Current Market Overview
Current Market Overview GOLD PRICE (AUD) 4,000.0 For personal use only 3,500.0 3,000.0 2,500.0 2,000.0 1,500.0 1,000.0 500.0 0.0 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 2022 2024 6
Slide 7: Exploration Progress & Achievements
Exploration Progress & Achievements For personal use only • Tambourah Metals Ltd is developing advanced Gold and Critical Minerals projects in Western Australia. • Tambourah Metals has consolidated the entire historic Tambourah goldfield in the Pilbara. • The goldfield has over 20 historic goldmines
Slide 8: Tambourah Gold Project
Tambourah Gold Project Tambourah Metals Ltd drill results from Tambourah King confirmed significant results For personal use only of up to 28g/t Gold including: • 2m @ 18.0g/t Au from 55m (TBRC026) – • Incl 1m @ 20.2 g/t Au from 55 - 56m • 5m @ 6.1 g/t Au from 69m (TBRC026) – • Incl 1m @ 28 g/t Au f
Slide 9: Tambourah Gold Project
Tambourah Gold Project Tambourah is set to drilling August 27th. For personal use only • Tambourah drilling proved the gold prospects extend over 3km strike. • The next targeted drill program of ~1,200m has been approved and is partly funded by an EIS grant. • The main focus of the diamond drill pro
Slide 10: Tambourah Gold Project
Tambourah Gold Project Gold mineralisation at the Tambourah Project occurs in steeply dipping pyritic quartz reefs and For personal use only veins and recently recognised granite-hosted vein systems. Gold was mined around the turn of the 20th century from the Tambourah and Western Shaw mining centre
Slide 11: Tambourah Gold Project: Tambourah King
Tambourah Gold Project Tambourah King For personal use only • Extensive shallow workings along line of lode, demonstrated high-grade lodes associated with wide halo of low-grade mineralisation. • No drilling below 100m vertical, most drilling <60m below surface. • Incomplete drill testing along stri
Slide 12: Tambourah 2023 Drilling Results
Tambourah 2023 Drilling Results Tambourah Metals Ltd received positive initial drill results from the World’s Fair gold prospect, For personal use only confirming gold analyses up to 8.4 g/t Gold including: •3m @ 3.3g/t Au from 23m (TBRC032) – •Incl 1m @ 8.4g/t Au from 23m •1m @ 4.9g/t Au from 2m (T
Slide 13: Tambourah Gold Project: World's Fair
Tambourah Gold Project World’s Fair • EIS funding for diamond drilling World’s Fair intrusion, For personal use only providing critical structural information on contact relationships, vein density and vein orientation. • Local, shallow high-grade gold reported from margins of granitoid intrusion ov
Slide 14: Cheela Project Location
Cheela For personal use only Project Location 14
Slide 15: Cheela Drill Program
Cheela Drill Program Cheela is located 70km northwest of Paraburdoo and adjacent to the For personal use only Paraburdoo-Nanutarra Road. Cheela prospect targeted historic gold intersections including: • 16m at 4.75g/t Au from 88m, including 8m at 8.59g/t Au Recent assays results show a potential ext
Slide 16: Cheela Drill Program
Cheela Drill Program For personal use only The drilling program will target historic high grade drill intersections reported by Newcrest Mining and Northern Star (see above), including • 10m at 3.85g/t Au from 88m, including 8m at 8.59g/t Au from 88m2 (ARB1222, Newcrest) and • 11m at 4.17/t Au from
Slide 17: Bryah Cu-Au project
Bryah Cu-Au project • Located 150km from north of Meekathara For personal use only • E52/4320, within the Bryah Basin and 60km southwest of the DeGrussa-Monty high grade copper-gold mine. The Bryah Basin is a major province for for VHMS copper-gold and Proterozoic gold mineralisation. • Tambourah te
Slide 18: Beatty Park Au prospect
Beatty Park Au prospect • Located on upper contact Narracoota Fm. Hole ID East_MGA North_MGA RL Dip Azimuth From To Length Grade Final Primary target for gold mineralisation in the (nom) (mag) Au g/t Depth For personal use only (m) Bryah Basin. BPR16 632643 7157169 554 -60 98 44 49 5 22.92 50 BPR17
Slide 19: Pilbara - Tin - Tantalum - Lithium Projects
Pilbara - Tin – Tantalum – Lithium Projects Recent Assay Results include: For personal use only • Assay results from Tambourah North, Shaw River and Haystack Well sampling have reported highly anomalous Li, Cs, Rb, Sn and Ta. • At Haystack Well individual assays reported up to 1% Li2O. • Samples fro
Slide 20: Julimar Nth
Julimar Nth Aircore drilling program carried out by earn-in partner For personal use only Sociedad Quimica y Minera de Chile S.A. (SQM) at Mogumber, part of the Julimar Nth project located 100km north of Perth, Western Australia The drilling program comprising 220 aircore holes for a Drilling locati
Slide 21: Julimar Nth
Julimar Nth The next phase of exploration at Mogumber and continues For personal use only to advance exploration at the Julimar Nth project with data from the recently completed regional aeromagnetic survey currently being processed. • First-pass recce AC drilling. • Contiguous Ta-Nb anomaly in EOH
Slide 22: Proposed Work Programs 2024
Proposed Work Programs 2024 For personal use only Projects August/September – CY2024 Q4 – CY2024 Q1 – CY2025 • Prepare & Process drill plans at Tambourah - Au • Diamond & RC Drilling at Au Targets • Assay results Tambourah King • Extending Drilling & Soil Sampling Cheela Gold - Au • RC Drilling at C
Slide 23: Summary
Summary Gold & Critical Minerals For personal use only Exploration for Gold is advancing rapidly. Further drilling is proposed at Cheela Gold project. Diamond drilling at Tambourah Gold prospects. EIS grant for diamond drilling at Tambourah Goldfield. Data compilation at Bryah Basin Au-Cu
Slide 24: Contact Us
For personal use only CONTACT US For more information please contact: Rita Brooks | Exec Chairperson Rita.Brooks@tambourahmetals.com.au M: +61 411 276 657 ASX:TMB Admin | Head Office admin@tambourahmetals.com.au +61 8 9481 8669 tambourahmetals.com.au linkedin.com/company/tambourahmetals