  1. Slide 1: Corporate Presentation April 2022

    LSE: EDV TSX:EDV OTCQX: EDVMF Corporate Presentation April 2022

  2. Slide 2: Table of Contents

    TABLE OF CONTENTS 1 Endeavour Overview 2 Results and Outlook 3 Our High Quality Portfolio 4 Being a Trusted Partner 5 Competitive Advantage in West Africa 6 Appendix 2

  3. Slide 3: Disclaimer and Forward-Looking Statements

    DISCLAIMER AND FORWARD-LOOKING STATEMENTS Cash cost per ounce and all-in sustaining cash cost per ounce are non-GAAP performance activities; changes in national and local government legislation, regulation of mining measures with no standard meaning under IFRS. This presentation contains statements

  4. Slide 4: Endeavour Overview

    ENDEAVOUR OVERVIEW 1 4

  5. Slide 5: Endeavour Has Unmatched Competitive Advantage

    ENDEAVOUR HAS UNMATCHED COMPETITIVE ADVANTAGE IN THE WORLD’S SECOND-LARGEST GOLD PRODUCING REGION 1 Largest 6 Gold 1.3-1.4Moz West African producer mines AISC $880-930/oz 2022 Production Guidance 5

  6. Slide 6: Peer Benchmarking

    PEER senior gold producers BENCHMARKING CROSS SECTOR BENCHMARKING Endeavour is attractive relative to other 0% 10% 20% 1Moz 2Moz 3Moz 4Moz 5Moz 6Moz 7Moz Endeavour Newmont B2Gold Barrick Kinross Polyus AngloGold AngloGold Barrick Gold Fields Polymetal Agnico-Eagle FY 2021 Production Polyus Kinross Y

  7. Slide 7: Our Strategy

    Watch CEO OUR STRATEGY video Build a resilient business and be a trusted partner with the ability to reward shareholders MAINTAINING A BEING A REWARDING HIGH-QUALITY PORTFOLIO TRUSTED PARTNER SHAREHOLDERS Industry-leading operational excellence Employment and training Prudent balance sheet managemen

  8. Slide 8: Embedding the UN SDGs into Our ESG Strategy

    EMBEDDING THE UN SDGS INTO OUR ESG STRATEGY Strong contributions to our host countries SOCIAL IMPACT › Economic Development › Education › Health › Access to Water & Electricity PROTECTING THE ENVIRONMENT › Climate Change › Water Stewardship › Biodiversity › Plastic Waste RESPONSIBLE MINING › Human R

  9. Slide 9: Focused on Being a Resilient Business

    FOCUSED ON BEING A RESILIENT BUSINESS High quality portfolio which generates sufficient cash flow to re-invest in our business and reward our stakeholders PORTFOLIO OBJECTIVES PORTFOLIO OPTIMIZATION PILLARS <$900/oz All-in sustaining cost 01 Operational Excellence +10 YEARS Production visibility fro

  10. Slide 10: Superior Operating Model

    1 SUPERIOR OPERATING MODEL OPERATIONAL EXCELLENCE Geographic focus provides a strong competitive advantage OPERATING MODEL MANAGEMENT TRACK RECORD › Largest producer in each of our operating countries enhances ability to extract synergies › Significant synergies from shared technical functions › Han

  11. Slide 11: Strong Operating Track Record

    1 STRONG OPERATING TRACK RECORD OPERATIONAL EXCELLENCE Ninth consecutive year of beating or achieving guidance 0.20 GROUP LTM INDUSTRY LTIFR1 LEADING 1.08 Industry Average2 1,536koz GROUP 2021 BEAT FY PRODUCTION TOP END 1,365-1,495koz Guidance $885/oz GROUP 2021 $850/oz $900/oz WITHIN AISC FY GUIDAN

  12. Slide 12: Project Pipeline

    2 PROJECT PIPELINE PROJECT DEVELOPMENT Strong competition for capital on a returns basis across the portfolio Long-term upside Near-term growth Immediate cash flow FROM GREENFIELD EXPLORATION FROM PROJECTS FROM PRODUCTION +110 EXPLORATION PROPERTIES 6 PROJECTS 6 MINES TARGET CRITERIA TARGET CRITERIA

  13. Slide 13: Strong Construction Track Record

    CEO INTRODUCTION 2 STRONG CONSTRUCTION TRACK RECORD PROJECT DEVELOPMENT Five recent builds integrated within our business AGBAOU, CÔTE D’IVOIRE, BOUNGOU, BURKINA FASO WAHGNION, BURKINA FASO BUILT IN 2014 BUILT IN 2018 BUILT IN 2019 TRACK RECORD safely with zero LTIs HOUNDÉ, BURKINA FASO ITY CIL, CÔT

  14. Slide 14: Key Projects

    4 2 44 KEY PROJECTS PROJECT DEVELOPMENT Sabodala-Massawa expansion underway; progressing DFS on greenfield projects BROWNFIELD PROJECT: GREENFIELD PROJECT: GREENFIELD PROJECT: SABODALA-MASSAWA EXPANSION LAFIGUÉ ON FETEKRO PROPERTY KALANA DFS INSIGHTS: PFS INSIGHTS: PFS INSIGHTS: ▪ Construction to co

  15. Slide 15: Strong Exploration Track Record

    3 STRONG EXPLORATION TRACK RECORD UNLOCKING EXPLORATION VALUE Achieved 5-year discovery target of 10-15Moz Total Indicated discoveries and targets Indicated resources discovered Exploration spend 11.5Moz 3.0Moz Discovered 11.5Moz discovered from 2.2Moz mid-2016 to 2021 2.1Moz 2022 Exploration Budget

  16. Slide 16: Largest Exploration Presence in West Africa

    3 LARGEST EXPLORATION PRESENCE IN WEST AFRICA UNLOCKING EXPLORATION VALUE Endeavour has a strategic foothold in two of West Africa’s most prospective belts THE LARGEST FOOTHOLD ON THE HOUNDÉ BELT Mana 10% KOFI LIPTAKO Hounde 9% LIGUIDI SIGUIRI NABANGA BANTOU FULL CONTROL OF 125KM BARRICK JV STRETCH

  17. Slide 17: Proven Ranking and Screening Methodology

    Watch 3 PROVEN RANKING AND SCREENING METHODOLOGY video UNLOCKING EXPLORATION VALUE Based on techniques used in the oil and gas sector Exhaustive Screened through multi- All screening based 150 criteria data analysis to targets on geological data targets set targets amenable to 110 and first selectio

  18. Slide 18: Strong Exploration Track Record

    3 STRONG EXPLORATION TRACK RECORD UNLOCKING EXPLORATION VALUE Targeting discovery of more than 2x production depletion over 2021-2025 period 5-year resource discovery target Risked mean Indicated resource discovery target (2021 - 2025) M&I resource as at 31 December, 2020 15-20Moz $/oz Target discov

  19. Slide 19: Focused on Long Life and Low AISC Assets

    4 FOCUSED ON LONG LIFE AND LOW AISC ASSETS ACTIVE PORTFOLIO MANAGEMENT Divested non-core assets and integrated five mines Endeavour’s Portfolio Key achievements across 4 pillars Core Mine1 Non-core Mine1 Divested / Ceased Mine Project2 AISC, $/oz 1,300 Realized synergies Built Houndé Built Ity Met g

  20. Slide 20: Production Outlook

    PRODUCTION OUTLOOK Ability to grow high-quality production while maintaining AISC <$900/oz PRODUCTION AND ALL-IN SUSTAINING COSTS For discontinued operations For continuing operations1 +1.6Moz 1.5Moz +1.5Moz <$900/oz 1.4-1.5Moz $885/oz <$900/oz 1.3-1.4Moz <$900/oz $880-930/oz 2013A 2014A 2015A 2016A

  21. Slide 21: Strong Cash Generation

    STRONG CASH GENERATION Provides ability to fund capital allocation priorities Operating Cash Flow and CAPEX Operating Cash Flow Capital Expenditures1 Realized Gold Price INVESTMENT PHASE CASH FLOW PHASE +$ 426m Operating CF FY-2021 vs. FY-2020 $1,175m $749m +57% $223m $251m $302m $233m $237m $440m $

  22. Slide 22: Evolution of Capital Allocation Priorities

    EVOLUTION OF CAPITAL ALLOCATION PRIORITIES Resilient business capable of funding growth and rewarding stakeholders DEBT REDUCTION CAPACITY TO FUND INVESTMENT PHASE ORGANIC GROWTH AND Key Focus PHASE $278m REWARD SHAREHOLDERS 2016 – 2019 (total) 2020 2021 Buybacks $138m Shareholder returns declared f

  23. Slide 23: Balance Sheet Strength

    BALANCE SHEET STRENGTH Strong cash generation supports balance sheet strength and shareholder returns Net Debt reduction (Net Debt)/ Net Cash Net Debt / Adj. EBITDA (LTM) $76m INVESTMENT DEBT REDUCTION SHAREHOLDER RETURNS PHASE PHASE WITH ABILITY TO FUND GROWTH Net cash position $75m $76m ($77m) ($7

  24. Slide 24: Attractive Shareholder Returns Programme

    ATTRACTIVE SHAREHOLDER RETURNS PROGRAMME Returning significant value to shareholders FY-2021 shareholder returns declared Shareholder returns in context of FY-2021 results PRODUCTION REVENUE $180/oz Minimum returned for every ounce 10% of revenue Dividend of gold produced distributed Buyback $138m $

  25. Slide 25: Attractive Shareholder Returns

    ATTRACTIVE SHAREHOLDER RETURNS Minimum progressive dividend provides visibility during growth phase SHAREHOLDER RETURNS POLICY Cumulative Shareholder Returns Programme › Endeavour implemented a shareholder returns Minimum dividend Supplemental shareholder returns programme that is composed of a mini

  26. Slide 26: Attractive Shareholder Returns

    ATTRACTIVE SHAREHOLDER RETURNS Most aggressive share buyback program amongst peers Indicative yield for shareholder returns1 FY-2021 Share Buyback FY-2021 Dividend 8% $138m 7% in share buybacks 6% for FY-2021 5% 4% 3% 2% 1% 0% 4.5% Indicative yield of Yamana Gold3,4 Newmont3 Endeavour2 Kinross3 Poly

  27. Slide 27: Return on Capital Employed

    RETURN ON CAPITAL EMPLOYED Significant improvement following build of our Ity and Houndé mines Return on Capital Employed (ROCE)1 ROCE IMPROVEMENT 20% EXPECTED WITH 18% OPTIMISATION OF ACQUIRED ASSETS 10% 6% 6% +20% ROCE target with strong capital allocation discipline 2017 2018 2019 2020 2021 (1) E

  28. Slide 28: Return on Capital Employed

    RETURN ON CAPITAL EMPLOYED Expected to improve ROCE with optimisation of acquired assets Return on Capital Employed High ROCE for legacy assets following Expected to increase ROCE on acquired by asset build and exploration success assets with exploration and optimisation ITY MANA BOUNGOU Mana Houndé

  29. Slide 29: LSE Premium Listing Completed in June 2021

    LSE PREMIUM LISTING COMPLETED IN JUNE 2021 The largest pure gold producer listed on the premium segment of the LSE INSIGHTS Production for London Stock Exchange listed gold producers1 › Liquidity continues to increase in the Gold Silver in gold equivalent UK with 24% of our free float shares now hel

  30. Slide 30: Ability to Reward Shareholders Across Cycles

    Watch ABILITY TO REWARD SHAREHOLDERS ACROSS CYCLES video Underpinned by a resilient business, disciplined capital allocation and a strong competitive advantage in West Africa RESILIENT BUSINESS + DISCIPLINED CAPITAL ALLOCATION High Quality Being a Prudent Balance Sheet Organic Shareholder Returns Po

  31. Slide 31: Upcoming Catalysts

    UPCOMING CATALYSTS Q2 Sabodala-Massawa Launch of Phase 2 construction 2022 Q2 Lafigué Completion of Definitive Feasibility Study for Lafigué project at Fetekro 2022 Q3 Shareholder Returns Payment of H1-2022 dividend 2022 Q3 Mana Wona Underground first stope production 2022 31

  32. Slide 32: Results and Outlook

    RESULTS AND OUTLOOK 2 32

  33. Slide 33: 2021 Recap

    2021 RECAP STRONG OPERATIONAL HEALTHY ATTRACTIVE ROBUST PERFORMANCE FINANCIAL POSITION SHAREHOLDER RETURNS ORGANIC GROWTH › Group LTIFR safety record of › Generated $1.2bn in › Shareholder returns of $278m › Discovered 3Moz of Indicated 0.20, well below industry operating cash flow including $140m o

  34. Slide 34: 2022 Guidance

    2022 GUIDANCE INSIGHTS Consolidated Production Guidance 2022 FULL-YEAR GUIDANCE (All amounts in koz, on a 100% basis) › Total production guidance for 2022 of 1,315 – 1,400koz at an AISC of $880 - Ity 255 — 270 $930/oz Houndé 260 — 275 › Updated guidance for continuing Mana 170 — 190 operations is in

  35. Slide 35: 2022 Guidance (Continued)

    2022 GUIDANCE (Continued) INSIGHTS Sustaining and Non-Sustaining Capital Expenditure Guidance › Sustaining and non-sustaining capital spend is expected to decrease 2022 FULL-YEAR GUIDANCE by approximately $50 million in 2022 compared to 2021 SUSTAINING NON-SUSTAINING ‒ Sustaining capital for 2022 is

  36. Slide 36: Supply Chain and Cost Inflation Controls

    SUPPLY CHAIN AND COST INFLATION CONTROLS Renegotiating long-term contracts as a larger group has helped to mitigate inflationary pressures INSIGHTS KEY CONTRACT RENEWALS › Renegotiated contracts after acquisitions of Semafo and Teranga to leverage increased group tender volumes with first key contra

  37. Slide 37: Our High Quality Portfolio

    Watch video OUR HIGH QUALITY PORTFOLIO 3 37

  38. Slide 38: Diversified Portfolio of Six Mines

    DIVERSIFIED PORTFOLIO OF SIX MINES 2022 Guidance P&P RESERVES as at Dec 31, 2021 M&I RESOURCES as at Dec 31, 2021 NAME COUNTRY MINE PRODUCTION AISC CONTAINED GOLD GRADE CONTAINED GOLD GRADE (koz) (US$/oz) (Moz) (g/t) (Moz) (g/t) Houndé Burkina Faso 260-275 875-925 2.51 1.66 5.17 1.55 Ity Côte d’Ivoi

  39. Slide 39: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Senegal 360-375koz $675-725/oz 4.4Moz 6.9Moz As at As at 2022 Target 2022 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources Overview The Sabodala-Massawa complex has potential to become a

  40. Slide 40: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Senegal KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 • Debottlenecked the CIL plant back-end in 2021 Resources shown Tonnage Grade Content inclusive of Reserves (on a 100% basis) (Mt) (Au g/t) (Au koz) • BIO

  41. Slide 41: Sabodala-Massawa Mine

    COO video presentation Website Latest technical report SABODALA-MASSAWA MINE Acquired in early 2021 Q4-2021 vs Q3-2021 INSIGHTS › Production remained flat despite the increase in processed grade as gold in circuit increased while plant throughput and plant recovery remained consistent. › AISC decrea

  42. Slide 42: Sabodala-Massawa Mine

    SABODALA-MASSAWA MINE BIOX® plant construction lifts Sabodala-Massawa mine to top tier status Sabodala-Massawa mine plan 2022 Guidance mid-point BIOX® Production Expected Reserve additions CIL Production 450Koz 400Koz Targeting production +400koz per annum 373koz/yr Expected average annual 350Koz pr

  43. Slide 43: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION Low-capex intensive brownfield expansion adds 1.35Moz of production at low AISC BIOX® PROJECT INSIGHTS Phase 2 expansion schematic plan › Low $290m capex expansion expected to be self funded by the existing Sabodala-Massawa operation Crushing and Stockpile › Additional geo

  44. Slide 44: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION Scope changes in DFS compared to PFS AREA DESCRIPTION OF CHANGE EXPECTED RESULT Additional geometallurgical work has reclassified fresh and transitional ore Removes risk associated with blending transitional and fresh ore with from the Massawa Central Zone and Massawa Nort

  45. Slide 45: Confirms Status as a Top Tier Mine

    Expansion Project Highlights (excludes current CIL operation) SABODALA-MASSAWA FIRST FIVE YEARS LIFE OF MINE Senegal (2024-2028) (2024-2033) OPERATING SUMMARY Tonnes processed, Mt 5.7 10.8 Strip ratio, W:O 7.7 8.5 CONFIRMS Grade processed, Au g/t Gold contained processed, koz Average recovery rate,

  46. Slide 46: Sabodala-Massawa Expansion

    SABODALA-MASSAWA EXPANSION First gold pour expected in early 2024 INSIGHTS Expansion Project construction timeline › Up to 24-month construction period is projected with an WORKSTREAM H1-2022 H2-2022 H1-2023 H2-2023 H1-2024 initial capital cost of $290m expected Early Works Fi na l Inves tment Deci

  47. Slide 47: Sabodala-Massawa Mine

    DISCOVERY TARGET (2021-2025) SABODALA-MASSAWA MINE Senegal 2.3 - 2.7Moz $26/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 110Mt at 1.94g/t au containing 6.88Moz NEAR-TERM FOCUS Discovery of additional high-grade refractory and non-refractory ore resources. Explore high-grade

  48. Slide 48: Near-Term Exploration Focus

    NEAR-TERM EXPLORATION FOCUS Exploration added 709koz of Indicated resources in 2021 INSIGHTS Massawa Plan Map › During 2021, exploration efforts delineated 591koz of Indicated resources representing a 11% increase over the 31 December 2020 M&I resource estimate excluding 2021 mine depletion. › Indic

  49. Slide 49: Sofia North Extension

    SOFIA NORTH EXTENSION Shallow high grade mineralisation extending for over 800m along strike 49

  50. Slide 50: Samina

    SAMINA Mineralised strike length greater than 1,100 meters and open to the north and south 50 50

  51. Slide 51: Tina

    TINA Northeast striking mineralised occurrence with further drilling planned for 2022 51 51

  52. Slide 52: Bambaraya

    BAMBARAYA High grade mineralisation from surface extending over 800m along strike BBTR001 13.2m@3.64g/t from 0m MRC21-0725 19m @ 1.97g/t Au from 7m Incl. 8m @ 3.07g/t Au from 18m MRC21-0723 4m @ 7.24g/t Au from 10m MRC21-0723 13m @ 2.06g/t Au from 46m 52 52

  53. Slide 53: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Côte D’Ivoire 255-270koz $850-900/oz 3.0Moz 4.5Moz As at As at 2022 Target 2022 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources Overview The Ity mine is one of Endeavour’s cornerst

  54. Slide 54: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Côte D’Ivoire KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 Resources shown Tonnage Grade Content • Commencement of mining Le Plaque and continued inclusion of new inclusive of Reserves (on a 100% basis)

  55. Slide 55: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Consistent Q4-2021 production vs Q3-2021 Q4-2021 vs Q3-2021 INSIGHTS Production and AISC › Production remained consistent with the prior quarter as Production, koz AISC, US$/oz higher mill throughput was offset by lowe

  56. Slide 56: Ity Mine

    COO video presentation Website Latest technical report 3D mine site tour ITY MINE Côte D’Ivoire Ity production plan 2022 Guidance mid-point 2017 Optimization Study +294Koz Incremental production added 300koz Target production of 250koz over +10 years expected to be achieved based on exploration pote

  57. Slide 57: Ity Mine

    DISCOVERY TARGET (2021-2025) ITY MINE Côte D’Ivoire 3.5 – 4.5Moz $17/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 90Mt at 1.56g/t au containing 4.48Moz NEAR-TERM FOCUS 3.3Moz discovered since 2016 with +10 year mine life. Focus to maintain and extend mine life through high

  58. Slide 58: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Targets defined along the full length of the Ity belt INSIGHTS › During 2021 exploration efforts delineated 975koz of Indicated resources representing a 26% increase over the 31 December 2020 M&I resource estimate, excluding 2021 mine depletion. Walter-Bakatouo Zia NE Ext

  59. Slide 59: West Flotouo

    WEST FLOTOUO High grade discovery close to the Ity CIL plant West Flotouo Plan Map West Flotouo Cross Section VO21-165 8.4m @ 4.57 g/t Au 5.9m @ 14.55 g/t Au VO21-176 25.8m @ 4.91 g/t Au 4.2m @ 10.85 g/t Au VO21-158 14.8m @ 3.04 g/t Au 5.9m @ 10.65 g/t Au VO21-096 25.2m @ 13.00g/t Au 3.7m @ 11.01g/t

  60. Slide 60: Le Plaque

    LE PLAQUE Updated resources extended mineralisation INSIGHTS Le Plaque Exploration Targets › During the 2021 drilling campaign, an updated mineral resource was defined at Le Plaque, extending mineralisation towards Le Plaque SW and at depth at Delta Extension. › The high grade Le Plaque deposit has

  61. Slide 61: Delta Extension

    DELTA EXTENSION Mineralisation extends below pit shell 61 61

  62. Slide 62: Walter-Bakatouo

    WALTER-BAKATOUO Near mine low strip ratio resources added WA21-052 5m @ 17.02 g/t Au WA21-074 3m @ 4.35 g/t Au 26.9m @ 3.24 g/t Au 6m @ 2.7 g/t Au WA21-033 WA21-025 18.4m @ 2.73 g/t Au 2m @ 39.84 g/t Au 23m @ 4.29 g/t Au 6.4m @ 3.86 g/t Au WA21-022 11m @ 2.54 g/t Au WA21-060 16.9m @ 6.20 g/t Au 19m

  63. Slide 63: Daapleu Deeps

    DAAPLEU DEEPS High-grade mineralisation extends down dip DA15-178 21.3m @ 1.87g/t Au 8.9m @1.37 g/t Au 9.3m @ 1.12 g/t Au DA16-193 18m @ 1.54g/t Au DA16-194 12.1m @ 1.47g/t Au 6.9m @ 1.13 g/t Au 13.9m @ 1.23 g/t Au DA15-174 14.2m @ 1.21g/t Au 10.7m @ 2.87 g/t Au DA16-193 15.6m @ 1.36 g/t Au DA21-615

  64. Slide 64: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso 260-275koz $875-925/oz 2.5Moz 5.2Moz As at As at 2022 Target 2022 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources Overview The Houndé mine is one of Endeavour’s The

  65. Slide 65: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 Resources shown Tonnage Grade Content • Potential to integrate new discoveries including the Mambo and Golden inclusive of Reserves (on a 100

  66. Slide 66: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Record performance in FY-2021 Q4-2021 vs Q3-2021 INSIGHTS Production and AISC › Production increased due to the higher recovery rates as well as the Production, koz AISC, US$/oz increased mill tonnage despite the lo

  67. Slide 67: Houndé Mine

    COO video presentation Website Latest technical report 3D mine site tour HOUNDÉ MINE Burkina Faso Houndé production plan 2022 Guidance mid-point Incremental production added +426Koz 2016 Optimization Study 300Koz Target production of 250koz over +10 years expected to be achieved based on exploration

  68. Slide 68: Houndé Mine

    DISCOVERY TARGET (2021-2025) HOUNDÉ MINE Burkina Faso 3.0 – 4.0Moz $19/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 104Mt at 1.55g/t au containing 5.17Moz NEAR-TERM FOCUS Focused on maintaining +10-year mine life. Focused on near mill targets such as Kari Area, Vindaloo Sou

  69. Slide 69: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Maiden resources declared at Mambo and Vindaloo South INSIGHTS Houndé plan map highlighting soil geochemical anomalies › During 2021 exploration efforts delineated 889koz of Indicated resources, representing a 20% increase over the 31 December 2020, M&I resource estimate,

  70. Slide 70: Mambo

    MAMBO Delineation of the Mambo discovery INSIGHTS. Mambo geology and drilling intercepts › Mambo is an attractive deposit as it is expected to have a low strip ratio, the resource contains approximately 40% oxide and transitional material › The higher-grade portion (+2g/t) of the Mambo deposit is ex

  71. Slide 71: Mambo

    MAMBO Down dip mineralisation extension remains open 71 71

  72. Slide 72: Golden Hill Exploration

    GOLDEN HILL EXPLORATION Potential to integrate within the Houndé mine plan INSIGHTS › Advanced-stage exploration project on the Houndé Belt within trucking distance (25-30km) of the Houndé mine › Potential for development as a satellite deposit › Expansive exploration licenses covering 468km2 › Dril

  73. Slide 73: Wahgnion Mine

    COO video presentation Website Latest technical report 3D mine site tour WAHGNION MINE Burkina Faso 140-150koz $1,050-1,150/oz 1.1 Moz 1.9 Moz As at As at 2022 Target 2022 Target December 31, 2020 December 31, 2020 Production AISC P&P Reserves M&I Resources Overview The newly developed Wahgnion mine

  74. Slide 74: Wahgnion Mine

    COO video presentation Website Latest technical report 3D mine site tour WAHGNION MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 • Greater mining flexibility following commissioning of Resources shown Tonnage Grade Content satellite deposits inclusive of Reserves (on

  75. Slide 75: Wahgnion Mine

    COO video presentation Website Latest technical report 3D mine site tour WAHGNION MINE Increased throughput and grades with stable recoveries in Q4-2021 Q4-2021 vs Q3-2021 INSIGHTS › Production increased due to increased plant throughput and higher processed grade while the plant recovery rate remai

  76. Slide 76: Wahgnion Mine

    DISCOVERY TARGET (2021-2025) WAHGNION MINE Burkina Faso 1.5 – 2.0Moz $25/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 41Mt at 1.48g/t Au containing 1.94Moz NEAR-TERM FOCUS Extend mine life to +10 years through discovery of additional satellite deposits within trucking dista

  77. Slide 77: Wahgnion Mine

    WAHGNION MINE Significant exploration potential exists within the permitted mine license INSIGHTS Nogbele South: Significant Indicated resource potential › An exploration programme of up to $12 million was planned for 2021. The exploration efforts continued to focus on Nogbele North and Nogbele Sout

  78. Slide 78: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Burkina Faso 170-190koz $1,000-1,100/oz 1.2 Moz 2.3 Moz As at As at 2022 Target 2022 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources Overview The Mana mine is located in the north

  79. Slide 79: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 • Mine life extensions through open pit and underground exploration Tonnage Grade Content Resources shown (Mt) (Au g/t) (Au koz) • Cost optimiz

  80. Slide 80: Mana Mine

    COO video presentation Website Latest technical report 3D mine site tour MANA MINE Wona underground development being expedited Q4-2021 vs Q3-2021 INSIGHTS Production and AISC › Production increased due to higher processed grade and Production, koz AISC, US$/oz plant recovery rate, which was partial

  81. Slide 81: Mana Mine

    DISCOVERY TARGET (2021-2025) Bara MANA MINE Burkina Faso 1.0 – 1.5Moz $30/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2020 38Mt at 1.89g/t Au containing 2.29Moz NEAR-TERM FOCUS Extend mine life to +10 years through exploration of Siou underground, Wona underground as well as ex

  82. Slide 82: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS Focus on discovering new oxide potential Mana exploration map INSIGHTS › An exploration programme of $8 million was planned for 2021 › In H2-2021 exploration was focussed on the Maoula open pit oxide target, and on evaluating underground targets at Siou, Wona and Nyafe. ›

  83. Slide 83: Maoula

    MAOULA Open pit oxide target MARC21-524 MARC21-513 5m @ 3.01 g/t \ 163m 3m @ 2.39 g/t \ 37m A MARC21-572 MARC21-559 3m @ 2.11 g/t \ 35m 3m @ 2.02 g/t \ 142m MARC21-169 MADD21-521 5m @ 3.24 g/t \ 29m 14m @ 2.65 g/t \ 69m MARC21-342 11m @ 6.27 g/t \ 104m MARC21-507 11m @ 3.72 g/t \ 14m MARC21-308 5m @

  84. Slide 84: Maoula

    MAOULA Mineralisation open between east and west structures NW MARC21-214 Base line MARC21-208 4.0m @ 3.33 g/t \ 14m SE 5.0m @ 1.99 g/t \ 25m 4.0m @ 1.35 g/t \ 21m 6.0m @ 1.53 g/t \ 69m MARC21-207 8.0m @ 2.09 g/t \ 26m Laterite MARC21-209 300m RL 5.0m @ 3.63 g/t \ 118m MARC21-210 7.0m @ 3.29 g/t \ 1

  85. Slide 85: Boungou Mine

    COO video presentation Website Latest technical report 3D mine site tour BOUNGOU MINE Burkina Faso 130-140koz $900-1,000/oz 1.1 Moz 1.4 Moz As at As at 2022 Target 2022 Target December 31, 2021 December 31, 2021 Production AISC P&P Reserves M&I Resources Overview The Boungou mine is a low cost, high

  86. Slide 86: Boungou Mine

    COO video presentation Website Latest technical report 3D mine site tour BOUNGOU MINE Burkina Faso KEY OPPORTUNITIES RESERVES AND RESOURCES AS AT DEC. 31, 2021 • Discovery of new deposits to maintain higher grade profile Resources shown Tonnage Grade Content inclusive of Reserves (on a 100% basis) (

  87. Slide 87: Boungou Mine

    COO video presentation Website Latest technical report 3D mine site tour BOUNGOU MINE Continued focus on waste stripping at East pit in Q4-2021 Q4-2021 vs Q3-2021 INSIGHTS Production and AISC › Production decreased due to a lower mined and processed grade Production, koz AISC, US$/oz while throughpu

  88. Slide 88: Boungou Mine

    DISCOVERY TARGET (2021-2025) BOUNGOU MINE Burkina Faso 1.0 – 1.5Moz $32/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2021 11Mt at 3.85g/t Au containing 1.38Moz NEAR-TERM FOCUS Extend mine life to +10 years through exploration of near mine targets Boungou North, Natougou SW, Nato

  89. Slide 89: Near Term Exploration Focus

    NEAR TERM EXPLORATION FOCUS High priority targets within 10km of the mine INSIGHTS Boungou Exploration Map › An exploration programme of up to $7 million was planned for 2021. The exploration efforts were focused on delineating near mine targets including Natougou Northeast, Boungou Northwest and Bo

  90. Slide 90: Lafigué Project

    PFS press release Latest technical report 3D mine site tour LAFIGUÉ PROJECT Côte D’Ivoire QUICKFACTS (ON 100% BASIS) – 2021 PFS RESERVES AND RESOURCES AS AT DEC. 31, 2021 Ownership 80% EDV; 10% Gov. Côte d’Ivoire, 10% SODEMI Mine Type Open Pit Tonnage Grade Content Mill Type 3.0Mtpa Gravity / CIP Pl

  91. Slide 91: Lafigué Project

    LAFIGUÉ PROJECT Simplified map of the Fetekro property showing Lafigué Côte D’Ivoire 2021 project economics are robust, with an attractive NPV and IRR being generated across a range of gold prices The PFS is based on the updated 2020 Mineral Resource Estimate, as published on August 18, 2020, which

  92. Slide 92: Lafigué Project Attractive Project Economics

    Fetekro 2020 PEA vs 2021 PFS LAFIGUÉ PROJECT PLANT TYPE, SIZE & CAPEX PFS PEA VARIANCE Côte D’Ivoire Plant type Gravity / CIP Gravity / CIL Mill Type 3.0 1.5 +100% Upfront capital cost, $m 338 268 +26% LIFE OF MINE PRODUCTION Mine life, years 9.5 8.0 +31% Strip ratio, W:O 10.3 7.4 +41% Tonnes proces

  93. Slide 93: Discovery Target (2021-2025) Lafigué Project

    DISCOVERY TARGET (2021-2025) LAFIGUÉ PROJECT Côte D’Ivoire 1.2 – 1.8Moz $14/oz Indicated resources Discovery cost M&I RESOURCES as at Dec 31, 2020 45Mt at 2.02g/t Au containing 2.92Moz NEAR-TERM FOCUS 2.92Moz have been discovered since 2018 with the aim to further extend the Lafigué resources. Sever

  94. Slide 94: Fetekro Project

    FETEKRO PROJECT DFS expected to be published in late Q1-2022 INSIGHTS Drilling between Lafigué Center and Lafigué North › Since the last resource update on 18 August 2020, more than 66,000 meters of drilling have been completed on the Lafigué deposit, the results of this drilling activity successful

  95. Slide 95: Fetekro Project

    FETEKRO PROJECT Mineralisation extends over 500m southeast of current pit shell LFRC21-1441 1.9m@ 0.99 g/t Au 95 95

  96. Slide 96: Kalana Project

    PFS press release Website Latest technical report KALANA PROJECT Mali QUICKFACTS (ON 100% BASIS) – 2021 UPDATED PFS RESERVES AND RESOURCES AS AT DEC. 31, 2021 Ownership 80% EDV; 20% Mali government Mine Type Open Pit Tonnage Grade Content Mill Type 3.0Mtpa Gravity / CIL Plant Resources shown inclusi

  97. Slide 97: Kalana Project

    KALANA PROJECT Kalana 2016 vs. 2021 Study Comparison1 Mali 2021 STUDY 2016 STUDY VARIANCE PLANT SIZE & CAPEX Nominal mill capacity, Mtpa 3.0 1.2 +150% Upfront capital cost, $m 297 196 +51% › Key changes in updated PFS compared to LIFE OF MINE STATS the 2016 Avnel study: Mine life, years 11 18 -39% ‒

  98. Slide 98: Kalana Project

    Kalana license and exploration targets KALANA PROJECT Mali › Discovery of additional deposits may provide an extension of the Kalana mining operation. In addition, potential high-grade free-digging soft material may provide further operating flexibility › The Kalanako Northwest area is highly prospe

  99. Slide 99: Bantou Project

    INSIGHTS › Acquired through Endeavour’s acquisition of SEMAFO in 2020 and currently consists of eight mineralized zones with diverse BANTOU PROJECT mineralization styles and grades within the prolific Houndé Burkina Faso Greenstone Belt › The inferred resource is comprised of three main areas with t

  100. Slide 100: Nabanga Project

    INSIGHTS Nabanga deposit plan map and schematic cross-section › Located 250 kilometres southeast of Ouagadougou, the Nabanga Gold NABANGA PROJECT Project lies within the Nabanga Burkina Faso exploration permit. › Results of Preliminary Economic Assessment (PEA) released on September 30, 2019. ‒ Pre-

  101. Slide 101: Greenfield Afema

    INSIGHTS › New Discovery: Woulo Woulo Prospect GREENFIELD AFEMA › Continued geological and Côte D’Ivoire structural evaluations to expand oxide mineralization along the Afema shear zone › Strong drill results across widespread mineralization the Woulo Woulo prospect › Average 40-50 metre wide gold m

  102. Slide 102: Greenfield Liguidi

    102 GREENFIELD LIGUIDI Burkina Faso

  103. Slide 103: Bondoukou - Tanda & Iguela

    INSIGHTS › Over 8 targets have been identified on the Tanda and Iguela exploration permits BONDOUKOU - TANDA & IGUELA Côte D’Ivoire › Dakou, Pala and Assafou- Broukro are high priority targets with the larger resource size potential › High gold in soil geochemical anomalies have been identified 103

  104. Slide 104: Greenfield: Siguiri Licenses

    104 GREENFIELD: SIGUIRI LICENSES Guinea

  105. Slide 105: Greenfield Sissedougou / Mankono

    JV WITH BARRICK GOLD › Drill results suggest the presence of an 800-metre Côte D’Ivoire GREENFIELD SISSEDOUGOU / MANKONO mineralized structure at Sissedougou with best drill results of: ‒ 34.6 m @ 2.08g/t Au at 74.6m, including 1.0m @ 31.52g/t Au ‒ 18.8 m @ 2.30g/t Au at 26.1m ‒ 23.0 m @ 2.14g/t Au

  106. Slide 106: Greenfield Nassile / Da-Guity

    INSIGHTS › Highly prospective area of Nassile and Dar-Guiti Niger GREENFIELD NASSILE / DA-GUITY › Exploration Permit obtained in 2017 › Exploration Permit covers a total surface area of 695km² 106

  107. Slide 107: Greenfield Kofi

    INSIGHTS › Kofi on same trend as Barrick’s Loulo- Mali GREENFIELD KOFI Gounkoto in Mali › Exploration license of Kofi not sold in Tabakoto sales process › Aim is to attain additional license around Kofi North/Netekoto to consolidate exploration cluster 107

  108. Slide 108: Being a Trusted Partner

    Watch video BEING A TRUSTED PARTNER Watch CEO video 4 108

  109. Slide 109: Improving Our Transparency & Disclosure

    IMPROVING OUR TRANSPARENCY & DISCLOSURE As our company has grown, so have our ESG initiatives and commitments 2022 • Set water targets 2021 • External assurance on key • Announce key ESG targets 2020 ESG data for 2025 • 1st RGMP externally • 7 RGMPs externally assured • Complete detailed assured aba

  110. Slide 110: Continuous Improvement in Ratings

    CONTINUOUS IMPROVEMENT IN RATINGS Reflecting increased transparency, disclosure and engagement 2019 2022 2019 2021 Relative Performance 2019 2020 2021 Climate Change D- C C 2020 Water N/A C C 2021 Forestry ✓ ✓ ✓ Defined targets required to advance to a B rating 110

  111. Slide 111: Rigorous Reporting with Board Oversight

    RIGOROUS REPORTING WITH BOARD OVERSIGHT THE BOARD Environment, Sustainability Audit Committee Quarterly & Governance Committee Executive Management Committee Executive ESG SteerCo Quarterly Sector Specialists Health, Human Social Finance Legal & Supply Investor IT safety & resources performance comp

  112. Slide 112: Aligning ESG Priorities Through Exec Comp.

    ALIGNING ESG PRIORITIES THROUGH EXEC COMP. Element Performance Metrics for 2021 Weighting ANNUAL BONUS (STIP) Net Free Cash Flow 20% Financial AISC 10% Production 10% Operational Exploration Targets 20% LSE Listing 20% ESG Safety & Malaria 20% LONG TERM INCENTIVE PLAN (LTIP) Shareholder value TSR vs

  113. Slide 113: Strong Corporate Governance

    STRONG CORPORATE GOVERNANCE Aiming for close alignment with UK Corporate Governance Code Size of Board = 10 Nationalities represented on the Board Board experience by sector Strategy & Leadership Accounting 9 5 1 Metals & Mining Finance International Business Operations & Exploration Corporate Gover

  114. Slide 114: Summary of Key Governance Improvements

    SUMMARY OF KEY GOVERNANCE IMPROVEMENTS Steps taken for listing on the Premium Segment of the LSE and to comply with UK Corporate Governance Code Employee Share Corporate Disclosure Board Executive Pay Scheme ✓ Redomiciled to the UK as a ✓ FPPP basis applied to ✓ Board Reserved ✓ Restructured CEO ✓ A

  115. Slide 115: Turning Our Purpose into an Actionable Strategy

    TURNING OUR PURPOSE INTO AN ACTIONABLE STRATEGY OUR PURPOSE PARTNERING WITH SUPPORTED BY OUR HOSTS STRONG ETHICS TO PRODUCE GOLD THAT AND GOVERNANCE PROVIDES LASTING VALUE TO SOCIETY INVESTING IN PROTECTING OUR HOST COUNTRIES OUR ENVIRONMENT We do so while protecting Respect for human rights and pro

  116. Slide 116: Our Sustainability Strategy

    ® ENDEAVOUR MINING ete OUR SUSTAINABILITY Warne STRATEGY ena 7 2 ey a oo wo eananaey pejeee comes ~ national and regional levels OUR AMBITION FOR OUR ESG MISSION INVESTING IN OUR ENVIRONMENT IMPLEMENTED ACROSS OUR OURIROST. COUNTIAES d 6 MINES, HOST COMMUNITIES AND BEYOND +) 4 Biodiversity Water Ste

  117. Slide 117: Embedding the UN SDGs into Our ESG Strategy

    EMBEDDING THE UN SDGS INTO OUR ESG STRATEGY Strong contributions to our host countries SOCIAL IMPACT › Economic Development › Education › Health › Access to Water & Electricity PROTECTING THE ENVIRONMENT › Climate Change › Water Stewardship › Biodiversity › Plastic Waste RESPONSIBLE MINING › Human R

  118. Slide 118: Investing in Our Host Communities

    INVESTING IN OUR HOST COMMUNITIES COMMUNITY ENGAGEMENT EDUCATION GOVERNMENT PAYMENTS › Grievance mechanism in place & and › Key priority for Endeavour to support the › Gold royalties paid on sliding scale, reported in our annual Sustainability Report next generation and overall national increasing a

  119. Slide 119: Supporting Economic Development

    CORPORATE PRESENTATION SUPPORTING ECONOMIC DEVELOPMENT PROCUREMENT ENDEAVOUR FOUNDATION IMPACT INVESTING › Supply chain re-orientated towards West › Created in 2021 to be Endeavour’s primary › Established an impact investing fund Africa since 2019 vehicle to implement regional and national ECODEV to

  120. Slide 120: Protecting the Environment

    CORPORATE PRESENTATION PROTECTING THE ENVIRONMENT WATER TAILINGS BIODIVERSITY › In 2020, we revised our water accounting › Annual disclosure in line with the Investor › Aim to minimise and mitigate our impacts and reporting methodology to align with Mining and Tailings Safety Initiative ICMM Water A

  121. Slide 121: Addressing Climate Change

    ADDRESSING Endeavour’s GHG emissions intensity amongst lowest in the industry Emissions intensity (kgCO2eq/oz) CLIMATE CHANGE 2020 GHG EMISSIONS INTENSITY In 2021 Endeavour committed to: ✓ -30% by 2030 => ~2C ✓ Net Zero by 2050 ✓ Carbon reduction included in Exec. Compensation Emissions intensity (k

  122. Slide 122: Addressing Our Climate Impact

    ADDRESSING OUR CLIMATE IMPACT SNAPSHOT OF OUR POWER GENERATION ENVIRONMENT SENEGAL Country Profile • Carbon-intensive grid • 87% fossil fuel - 9% hydropower solar and biofuels Mines & main power source • Sabodala-Massawa - HFO TRANSFORMATION OF OUR PORTFOLIO AS WE HAVE GROWN CÔTE D’IVOIRE BURKINA FA

  123. Slide 123: Our People

    CORPORATE PRESENTATION OUR PEOPLE SAFETY HEALTH GENDER DIVERSITY › Strong safety culture with Zero harm goal › COVID-19 Response › In 2020 set 25% increase in gender diversity as part of the Group-wide ‒ No impact on production › Safety KPI part of annual Group bonus annual bonus… ‒ Successful EDV v

  124. Slide 124: Ethical Business

    CORPORATE PRESENTATION ETHICAL BUSINESS HUMAN RIGHTS ANTI-BRIBERY/CORRUPTION RESPONSIBLE SOURCING › Our Human Rights Policy is reviewed › Independent 3rd party 24/7 whistleblower › All gold produced by Endeavour sourced annually, and we publish an annual Modern hotline from our own operations Slaver

  125. Slide 125: Competitive Advantage in West Africa

    Watch video COMPETITIVE ADVANTAGE IN WEST AFRICA 5 125

  126. Slide 126: Golden Opportunity in West Africa

    WEST AFRICA ENDEAVOUR'S PRESENCE No. 1 GOLDEN OPPORTUNITY No. 1 Gold producer in the region and in each of the countries in which we operate IN WEST AFRICA for global gold discoveries over past decade Endeavour is strategically positioned with an unmatched competitive advantage in the region. 20% En

  127. Slide 127: West African Production Growth

    REGION’S PRODUCTION GROWTH WEST AFRICAN PRODUCTION GROWTH WEST AFRICA 12.5Moz 12.5% IS THE FASTEST- GROWING GOLD 10.0Moz 10.0% PRODUCING REGION Percentage of Global Mine Supply West African Mine Supply 7.5Moz 7.5% +90% 5.0Moz 5.0% production increase over last decade 2.5Moz 2.5% 12% 0.0Moz 0.0% of g

  128. Slide 128: Annual Gold Production by Region

    PRODUCTION FOR THE REGION ANNUAL GOLD PRODUCTION BY REGION In millions of ounces, for 2019 WEST AFRICA 12Moz IS THE 2ND LARGEST 12Moz GLOBAL GOLD 11Moz 10Moz PRODUCING REGION Given the golden opportunity in West Africa, 6 out of the top 10 senior 6Moz gold producers have a presence in 6Moz the regio

  129. Slide 129: Endeavour Is the Dominant West African Gold Producer

    PRODUCTION WEST AFRICAN GOLD PRODUCTION (2021E) ENDEAVOUR Endeavour IS THE DOMINANT AngloGold WEST AFRICAN Newmont GOLD PRODUCER Gold Fields Barrick Given its focus on West Africa, Endeavour B2Gold has a strategic industrial benefit from Kinross being geographically focused yet diversified across mu

  130. Slide 130: Endeavour's Operating Model

    ENDEAVOUR’S OPERATING MODEL › Geographic focus provides a strong competitive advantage › Largest producer in each of our operating countries › Hands-on management model with teams close to operations › Senior management team spends significant time in-country › General managers empowered and rely on

  131. Slide 131: Enhanced Security Platform Due to Scale in the Region

    REGION’S PRODUCTION GROWTH ENHANCED SECURITY PLATFORM DUE TO SCALE IN THE REGION › Security unit structured as a business unit, led by ex-French military › Air strips on sites to avoid use of roads and improve operating efficiencies › Significant foreign aid and co- operation amongst West African na

  132. Slide 132: Industry 2020 Exploration Budget

    INDUSTRY EXPLORATION SPEND INDUSTRY 2020 EXPLORATION BUDGET In US$ millions 842 WEST AFRICA IS 788 THE 4TH LARGEST EXPLORATION FOCUS ACROSS THE GLOBE Given that exploration spend often 470 458 foreshadows future production growth, West Africa has the potential to continue to be a large producing reg

  133. Slide 133: Discoveries by Area

    INDUSTRY EXPLORATION SPEND DISCOVERIES BY AREA For the period between 2006-2016 79Moz WEST AFRICA RANKS 1ST FOR DISCOVERIES OVER PAST DECADE 50Moz The region is significantly under-explored 42Moz compared to other regions. 33Moz 27Moz 27Moz 79 23Moz 22Moz 20Moz 18Moz Moz 16Moz 16Moz 15Moz 13Moz 13Mo

  134. Slide 134: Endeavour Holds One of the Largest Land Tenement Holdings

    UNDER-EXPLORED REGION ENDEAVOUR HOLDS ONE OF THE LARGEST LAND TENEMENT HOLDINGS IN WEST AFRICA 60% of greenstone belt lies in Burkina Faso and Côte d’Ivoire but… …only represents Endeavour has a strategic foothold in ~30% of production two of West Africa’s most prospective belts since it is underexp

  135. Slide 135: Endeavour Controls the Full 125km Stretch Along the Ity Birimian Belt

    ENDEAVOUR CONTROLS THE FULL 125KM STRETCH ALONG THE ITY BIRIMIAN BELT 135

  136. Slide 136: Endeavour Has the Largest Foothold on the Houndé Belt

    ENDEAVOUR HAS THE LARGEST FOOTHOLD ON THE HOUNDÉ BELT 136 136

  137. Slide 137: West Africa Operates as a Stable Sector

    WEST AFRICA OPERATES STABLE SECTOR AS AN ECONOMIC UNION MINING CODE SIZE West African Economic and Well balanced profit sharing: Extractive sector Monetary Union (WAEMU) › Corporate tax rate between 25- represents a low % 35% of GDP1: › Free-carried interests between › Senegal: 2% 10-15% › Cote d’Iv

  138. Slide 138: Unmatched Competitive Advantage

    UNMATCHED COMPETITIVE ADVANTAGE Dominant presence in the world’s second-largest producing region STRATEGIC SUPERIOR MANAGEMENT POSITIONING OPERATING MODEL TRACK RECORD Largest producer in each country In country and regional synergies Discovered 11.5Moz of Indicated resources where we operate at <$2

  139. Slide 139: Appendix

    APPENDIX FT / 2) Es y

  140. Slide 140: Appendix 1 Company Profile, Management and Board

    01 APPENDIX 1 Company Profile, Management and Board

  141. Slide 141: Company Profile

    COMPANY PROFILE Highlights Top Shareholders Shareholder register as at 31 January 2021 Ticker LSE | TSX: EDV, OTXCQ: EDVMF Shares outstanding as at 22 March, 2022 249m Rank Institution name % of S/O 1 La Mancha 19.4% Share price as at 22 March 2022 £18.65 / C$31.33 2 BlackRock Investment Management

  142. Slide 142: Solid Management Track Record

    SOLID MANAGEMENT TRACK RECORD SÉBASTIEN • Sébastien de Montessus is President and CEO of Endeavour Mining. Under his leadership, he has introduced key strategic objectives that have created a sustainable business that generates long term cash flow DE MONTESSUS • Previously, Sébastien served as the C

  143. Slide 143: Board Members

    BOARD MEMBERS Michael Beckett Alison Baker Carmen Letton David Mimran Tertius Zongo Chairman Non-executive Director Non-executive Director Non-executive Director Non-executive Director Non-executive Director James Askew Livia Mahler Naguib Sawiris Sofia Bianchi Sébastien de Montessus Non-executive D

  144. Slide 144: Analyst Coverage

    ANALYST COVERAGE Firm Analyst Phone Email Bank of America Lawson Winder ✆ +1 416 369 7592 ✉ lawson.winder@bofa.com Barclays Amos Fletcher ✆ +44 20 7773 2225 ✉ amos.fletcher@barclays.com Berenberg Jonathan Guy ✆ +44 20 3753 3379 ✉ jonathan.guy@berenberg.com BMO Raj Ray ✆ +44 20 7246 5430 ✉ raj.ray@bm

  145. Slide 145: Appendix 2 Financial Appendices

    02 APPENDIX 2 Financial appendices

  146. Slide 146: Mine Statistics

    MINE STATISTICS On a quarterly basis (1) Includes waste capitalized. 146

  147. Slide 147: Mine Statistics

    MINE STATISTICS On a full year basis (1) Includes waste capitalized. 147

  148. Slide 148: Appendix 3 Reserves and Resources, 5-year Exploration Target

    03 APPENDIX 3 Reserves and Resources, 5-year exploration target and security

  149. Slide 149: Reserves and Resources

    RESERVES AND RESOURCES As of December 31, 2021 On a 100% basis On a 100% basis On a 100% basis Resources shown Tonnage Grade Content Resources shown Tonnage Grade Content Resources shown Tonnage Grade Content inclusive of Reserves (Mt) (Au g/t) (Au koz) inclusive of Reserves (Mt) (Au g/t) (Au koz) i

  150. Slide 150: Exploration Methodology and Strategy

    EXPLORATON METHODOLOGY AND STRATEGY Selection, ranking and risk evaluation of exploration targets Endeavour’s large land position (more than 17,000 sq Km) and comprehensive database over a very large number of exploration targets promotes the application of a general portfolio management theory wher

  151. Slide 151: Exploration Methodology and Strategy

    EXPLORATON METHODOLOGY AND STRATEGY Selection, ranking and risk evaluation of exploration targets Step 4: Final selection of targets, with higher PoO and priority, which can be physically be included in the 5 year exploration plan Since Endeavour cannot feasibly explore the 110 targets, defined in S

  152. Slide 152: Appendix 4 Debt Sources, Revenue Protection Program

    04 APPENDIX 4 Debt Sources, Revenue Protection Program

  153. Slide 153: Debt Structure

    DEBT STRUCTURE Refinanced to provide a low cost, long-term debt structure REFINANCING INSIGHTS: Balance Sheet Structure › On 14 October 2021, the Company completed an offering of fixed (in $ million unless stated otherwise) 31 Dec 2021 30 Sep 2021 31 Dec 2020 rate senior notes due in 2026 and an uns

  154. Slide 154: Short Term Revenue Protection Program

    SHORT TERM REVENUE PROTECTION PROGRAM Increased certainty of cash flow to achieve corporate objectives Gold collars INSIGHTS Gold price in US$/oz › Aimed at increasing cash flow certainty 2,100 Growth and shareholder return focus during construction while retaining headroom to continue an attractive

  155. Slide 155: Contact Us

    ®) ENDEAVOUR MINING | CONTACT US T: +44 203 011 2719 investor@endeavourmining.com Follow us: endeavourmining.com CORPORATE OFFICE 5 Young Street London W8 5EH United Kingdom T: +44 203 011 2723 OPERATIONS OFFICE Hotel Palm Club Croisement Boulevard Latrille et rue du Lycée Technique Abidjan 08 BP 87