Terrain Minerals Ltd · ASX:TMX

Terrain Minerals — Investor Presentation (October 2016)

16 slides from Terrain Minerals's investor presentation, October 2016

  1. Slide 1: Terrain Minerals Limited – Production in Sight

    TERRAIN MINERALS LIMITED Production in Sight Investor Presentation | October 2016

  2. Slide 2: Important Information

    Important Information FORWARD LOOKING STATEMENTS This presentation has been prepared by Terrain Minerals Ltd (“Terrain”, “the Company”) as a summary of the Company, its mineral assets & its plans to explore its tenements & for general information purposes only. This presentation contains material th

  3. Slide 3: Company Profile

    Company Profile Capital Structure Issued Shares (TMX) 409m Issued Options Unlisted (board) 57.2m Share Price (11/10/2016) 0.01c Market Cap $4m Cash at hand (30/06/16) $617k Board of Directors Non-Executive Directors Paul Dickson Chairman Jonathan Lim Director Executive Director Justin Virgin Executi

  4. Slide 4: Terrain Minerals Summary

    Terrain Minerals Summary Advancing Towards Production  Two 100% owned Gold Projects Located in Western Australian  Board & Experienced Team focused on Advancing Great Western to Mine Approval & into Production – Strategy in Place & Underway Great Western - Advanced Gold Project  62,805oz Gold - M

  5. Slide 5: Great Western Gold Project

    Great Western Gold Project  62,805oz Gold JORC Compliant – 669,000 tons at 2.9grams*  147 RC Holes Totalling 15,000m~  Strike 450m long to a depth of 200m  Additional Resource Definition Drilling Underway RC & Diamond  Mineralisation Extended's Beyond Existing Mine Designs - Open at Depth & to

  6. Slide 6: Great Western Gold Project

    Great Western Gold Project Great Western Cross Section M37/54 Granted Mining Lease & Drill Collar Locations Work Program  Stage 1 - RC Drill Program, 21 holes for 1,020m - Commencing 4th Quarter 2016  Bulk Metallurgical Samples will be Taken for Advanced Testing  Mineral Resource Upgrade to Follo

  7. Slide 7: Great Western Gold Project – Drilling Strategy & Open Pit Shell Areas

    Great Western Gold Project Drilling Strategy & Open Pit Shell Areas One of the Proposed Pit Shell Generated Over 2012 JORC Block Model Drilling Strategy & Targeting  The dark green outer pit shell on the right contains the Eastern 42% inferred material  RC drilling underway includes 7 holes, ~612m

  8. Slide 8: Great Western Gold Project – Production Studies

    Great Western Gold Project Production Studies - Toll Treatment Options or 100% Terrain Onsite Sepro System: 75t 3 Stage Crushing Circuit Sepro System: 40 tph Grinding & Gravity Plant (dual stream Mills & centrifugal concentrator) Early Stage Finding from On Site Processing Studies & Designs  Studie

  9. Slide 9: Great Western Development Plan

    Great Western Development Plan Granted Mining Lease - M54/37 Complete Mineral Resource Upgraded to JORC 2012 Edition Scoping Studies – Phase 1 Completed including Processing Plant Design Stage 1- Resource Definition Drilling Underway Underway 1,020m RC with JORC Category Update to Follow Collect Bul

  10. Slide 10: Gimlet Geological Setting

    Gimlet Geological Setting Gimlet Auger Anomaly ‘A’ Arial view - Anomaly ‘A’ Location Historic Review Over Gimlet Project Area Identified  Anomaly ‘A’ is a discreet east-west trending 600x200m gold in soil (Gold target)  The 15-30ppb anomaly was identified by 200x100m auger sampling  Drilling just

  11. Slide 11: Gimlet Development Plan

    Gimlet Development Plan Acquire 100% of Project & Compile Available Historical Data Complete Review Identified Shallow & Untested Drill Target Board Approval for Exploration Drilling Campaign Underway Program of Works Application Planning for Drilling Underway Targeted Scout Drilling Program Planned

  12. Slide 12: Use of Funds – Share Purchase Plan (SPP)

    Use of Funds – Share Purchase Plan (SPP)  $120,000 – Stage 1: RC Drill Program at Great Western:  Planned for 4th Quarter 2016  21 Holes for 1,020m~  $5,000 – Collect & Store Bulk Metallurgical Sample Material for Testing  $5,000 – Update JORC 2012 Resource - Aim to lift Eastern Inferred Materi

  13. Slide 13: Summary

    Summary  Two 100% Owned Western Australian Gold Project – No Royalties  Great Western – 62,805oz Gold - Measured, Indicated, Inferred 2012 JORC Compliant Mineral Resource*:  Open at Depth & to the West  Focused Board & Team – Strategy to take Great Western to Mine Ready Stage & into Production 

  14. Slide 14: Appendix 1 – Great Western Brief History & Site Location Map

    Appendix 1 Great Western – Brief History & Site Location Map Pit & Decline are Proposed only & from Historic Mining Studies Above diagram does not show the May 2015 drilling intercepts that Great Western Centre & the Proximity of Possible Nearby intersected mineralisation between several conceptual

  15. Slide 15: Appendix 2 – Board of Directors & Key Staff

    Appendix 2 Board of Directors & Key Staff Directors Paul Dickson  Mr Dickson is a director of Proserpine Capital Partners Pty Ltd, a Melbourne based Private Equity Firm & has >25 Non – Executive years' experience in the securities & finance industries Chairman  Paul is currently a non-executive di

  16. Slide 16: Appendix 3 – Reportable Mineral Resource

    Appendix 3 The following Table Summarises the Reportable Mineral Resource Great Western Deposit Reportable in situ Mineral Resource depleted for mining Underground Open Cut (0.5g/t) (1.5g/t) Combined Class Tonnes Au g/t Tonnes Au g/t Tonnes Au g/t Measured 90,000 2.35 90,000 2.35 Indicated 166,000 2

Terrain Minerals — Investor Presentation (October 2016) on 6ix