1414 Degrees Ltd. · ASX:14D
1414 Degrees — Investor Presentation (November 2021)
31 slides from 1414 Degrees's investor presentation, November 2021

Slide 1: 1414 Degrees Ltd Investor Update – November 2021
1414 Degrees Ltd Investor Update – November 2021 Matt Squire – Chief Executive Officer info@1414degrees.com.au

Slide 2: 1414 Degrees (ASX: 14D) - positioned for success
1414 Degrees (ASX: 14D) - positioned for success A$/share - 12 months 1. Leveraging off our investments to date: $0.35 • Intellectual property and know-how: innovative energy storage $0.30 technology $0.25 • 5 years practical knowledge - we know what we have to solve • Supportive government and stak

Slide 3: Clean energy transition needs storage ... and heat matters
Clean energy transition needs storage ... and heat matters • Solar and wind are the engines of change • Reduced funding available for fossil fuels • Gas prices are going up INSERT PICTURE/S • Society is now demanding action on renewables • Glasgow? Gretta Thunberg? • Mike CB and Twiggy? What we need

Slide 4: Managing supply and demand - the rise of intermittent renewables
Managing supply and demand - the rise of intermittent renewables Electricity “Duck Simplistic end-use energy Curve” demand INSERT PICTURE/S • Glasgow? Gretta Thunberg? • Mike CB and Twiggy? California Independent System Operator (CAISO) predicts net electricity demand over time on a typical spring d

Slide 5: Why do we need to think about clean heat?
Why do we need to think about clean heat? • Heat is ~50% of total global energy demand • ~50% of energy used by industry is for process heat • The demand from industry and governments for cleaner energy solutions means there is huge market gap and potential for clean heat • Industrial processes need

Slide 6: 1414 Degrees is working on the solution
1414 Degrees is working on the solution Past • Listed on the ASX in 2018 (14D) • Proprietary thermal energy storage technology with IP protection from successful patent applications • R&D focus on long-duration energy storage utilising the thermal properties of Silicon – supported by University of A

Slide 7: Utilising the properties of Silicon - phase change energy storage
Utilising the properties of Silicon - phase change energy storage • High energy storage capacity - > 500kWh/tonne • High melting (operating) temperature • High energy storage density • Efficient energy storage • Consistent, high temperature (highly usable) energy output

Slide 8: Renewed and focussed approach to our Silicon storage technology
Renewed and focussed approach to our Silicon storage technology Previous approach New focus - single module TESS-IND For industry (heat and power) Scalable energy storage solution, adaptable to all TESS-GRID For utilities and large industry (heat and power) users. GAS-TESS For biogas facilities (hea

Slide 9: … because heat matters!
Renewed focus on our energy storage technology: SiBox™ … because heat matters!

Slide 10: Renewed focus on our energy storage technology: SiBox™
Renewed focus on our energy storage technology: SiBox™ Energy Input: Heat Store: Heat Output: Excess solar / wind off the grid • Heat is stored in silicon-based Phase Change • Stored heat extracted as high temperature, via radiative electrical elements Material (PCM) low pressure, air (~1000°C) • He

Slide 11: SiBox economics: example of how it works
SiBox economics: example of how it works Example of renewable maths Future cost challenge: (A$) Process 1 MWh/d, 365 MWh pa $150/kWh capital Gross up for 90% (long life > 20yrs) Steam $20/MWh + $34/MWh + $4/MWh = $58/MWh heat Power Generation $5.50/GJ $9.40/GJ $1.00/GJ $16/GJ Delivered Other Our vis

Slide 12: SiBox economics: conversion of cheaper electricity to clean heat
SiBox economics: conversion of cheaper electricity to clean heat Energy user IRR of a SiBox installation at various electricity and gas prices Energy user benefits of SiBox: ~$10/GJ Delivered cost of gas (A$/GJ) ~$30/GJ IRR (%) • Increase purchase of intra-day ~$0/MWh High renewable electricity (sto

Slide 13: SiBox development: Technical and cost pathway
SiBox development: Technical and cost pathway Technology Readiness Level status SiBox cost reduction pathway Levelised cost of Heat (A$/kWh) Commercial Readiness Index 300 Future R&D 250 Design Future steps post SiBox module: improvements Original 14D concept projects to date S5: New low-cost PCM 20

Slide 14: SiBox technology: Demonstration module project
SiBox technology: Demonstration module project Cal 2021 2022 2023 2024 2025 + Final design and procurement Construct and commission Performance test and validation Woodside SPV partnership decision Commercialisation (pilots/manufacturing) studies Total project circa A$4.5 - 5 million Future pilot pr

Slide 15: Advantages of SiBox
Advantages of SiBox High temperature heat: SiBox’s operating temperature far Efficient: exceeds the capabilities of current SiBox has a thermal efficiency of greater commercial thermal energy storage than 90%, based on one cycle per day alternatives, such as molten salts (<600°C) Flexible energy out

Slide 16: Advantages of SiBox
Advantages of SiBox Scalable: Flexible location: Using its modular design SiBox systems SiBox can be located where required, it can be cost-effectively scaled to meet does not need to be located with a customer requirements and integrate renewable energy source into existing facilities Compact size:

Slide 17: SiBox example: Industrial energy user
SiBox example: Industrial energy user • High temperature (up to 1000°C) integration to existing process • Combined heat and power solution • Absorb low-cost renewable power • Offset fuel usage and decarbonise • Provide security of energy supply against future price fluctuations or interruptions • In

Slide 18: SiBox example: repurpose existing power generation assets
SiBox example: repurpose existing power generation assets • Integrate with existing infrastructure • Reduce / remove coal consumption and decarbonise by offsetting with renewable power • Increase flexibility (ramp up / ramp down) • Maintain spinning reserve • Enable energy arbitrage

Slide 19: Storage and baseload renewable energy
Storage and baseload renewable energy

Slide 20: Aurora Energy Project: Location
Aurora Energy Project: Location • Approximately 30km north of Port Augusta, South Australia • Site of the previously approved SolarReserve Concentrated Solar Power (CSP) project • Adjacent to significant infrastructure: • Hill-to-Hill 275kV transmission line connected to NEM • Stuart Highway • Skill

Slide 21: Aurora Energy Project: Site features
Aurora Energy Project: Site features World class solar resource Solar monitoring station on-site • Excellent solar resource • Long term data monitoring (since November 2016) • High value DNI (Direct Normal Irradiance) resource • Lease area in excess of 1,500 ha • Largely flat, complete geotechnical

Slide 22: Large scale renewable energy development connected to the NEM
Large scale renewable energy development connected to the NEM • Planned renewable hybrid power plant • Stage 1 project - 140MW/280MWhr battery (BESS) • Strong business case with revenues from market arbitrage, frequency control ancillary services and fast frequency response • Future stages (also per

Slide 23: Future activities and indicative timeframe
Future activities and indicative timeframe Cal 2021 2022 2023 2024 25 Years + Final design Connection process Final Investment Decision (FID) Equipment selection Construction Confirmation with stakeholders Operation Potential partnering process Generator Performance Standards Study AEMO 5.3.4 Letter

Slide 24: Simple corporate focus over the next 12-18 months: exciting times ahead
Simple corporate focus over the next 12-18 months: exciting times ahead • We are a small, lean organisation • Our projects are clear and well defined 1. Build the SiBox • Excellent partners validate the potential of our technology • $4.2M of funding support from Woodside and Commonwealth Government

Slide 25: Further information
Further information

Slide 26: Board & Management
New leadership: Lean, strong governance, focus on shareholder value Board & Management TONY SACRE PETER GAN DANA LARSON MATTHEW SQUIRE JORDAN PARHAM Chair & Non-Executive Director Non-Executive Director Non-Executive Director Chief Executive Officer Chief Operating Officer Jordan oversees the Peter

Slide 27: Strong in-house technical team backed by external partners
Strong in-house technical team backed by external partners • Multi-disciplinary team of technical specialists • Further 2 graduate engineers starting December ‘21 • Dedicated workshop for research and development • Strategic partnerships with companies and Universities to access specialised skills a

Slide 28: Innovation only happens through actually doing it!
Innovation only happens through actually doing it! TESS-Demonstrator Lonsdale Project Glenelg Project Early Work (TESS-IND) (GAS-TESS) - Original concept by CSIRO - Energy storage and - Commercial scale pilot of - Commercial scale pilot project recovery proof of concept full system operation - Unive

Slide 29: Glenelg project (GAS-TESS) biogas energy storage
Glenelg project (GAS-TESS) biogas energy storage • Project in conjunction with SA Water and co-funding by SA Government's Renewable Technology Fund • Energy source - biogas fired through gas burners • Time-shifts energy for later electricity generation and provides a hot water feed to the waste-trea

Slide 30: Sibox: New technology for a low-carbon energy future
Sibox: New technology for a low-carbon energy future

Slide 31: … because heat matters!
… because heat matters!
Source: Internet Archive copy of 1414degrees.com.au
More decks from 1414 Degrees Ltd.
Shareholder Meeting (November 2026)17 slides · Nov 11, 2026
Tactic 202611 slides · Jul 29, 2026
Shareholder Meeting (November 2025)15 slides · Nov 19, 2025
Investor Presentation (October 2025)10 slides · Oct 23, 2025
Investor Presentation (October 2025)9 slides · October 2025
ASX Gems Investment Conference (July 2025)8 slides · Jul 11, 2025