Caravel Minerals Limited · ASX:CVV

Caravel Minerals — Resources Rising Stars Summer Series 2024

14 slides from Caravel Minerals's conference presentation, Dec 3, 2024

  1. Slide 1: Resources Rising Stars – Summer Series Caravel Minerals Presentations

    3 December 2024 RESOURCES RISING STARS – SUMMER SERIES CARAVEL MINERALS PRESENTATIONS Caravel Minerals ASX: CVV is pleased to advise shareholders and investors that Managing Director, Don Hyma will present at the Resources Rising Stars Summer Series Investor Conference being held on Tuesday 3 Decemb

  2. Slide 2: Building Australia's Next Copper Company

    ASX: CVV Building Australia's Next Copper Company For personal use only Don Hyma​ Managing Director Resources Rising Stars Conference Summer Series | Sydney | Melbourne 3 & 5 December 2024 Example of simple photo graphic Resources Rising Stars Conference Summer Series | Sydney 1 & Melbourne | 3 & 5

  3. Slide 3: Forward Looking and Cautionary Statements

    Forward Looking and Cautionary Statements Caravel Minerals Limited (Caravel or the Company) This presentation should be considered in its entirety. If you do not understand • 13 April 2023 “PFS Processing Update – Caravel Copper consents to the inclusion in this report of the matters based on his in

  4. Slide 4: Corporate snapshot

    Corporate snapshot Snapshot Ownership Paradice ASX ticker CVV 9.4% Board & For personal use only Share price (30 November 2024) 19.0c Management 8.1% Shares on issue 557M Glenvar Options on issue 43M 3.5% Other holders Market capitalisation (30 November 2024) $105M 55.2% Alma Metals Cash (30 Novembe

  5. Slide 5: Caravel Copper Project

    Caravel Copper Project A project that must and will be built to meet world demand For personal use only • Mining-friendly jurisdiction Favoured location • Existing roads, power, water, ports • World class mining expertise • Minimum 25 years Long-life operation • Low-cost production • Critical for de

  6. Slide 6: Resource growth and confidence

    Resource growth and confidence Upside exploration potential along a 30km mineralised corridor For personal use only Resources Rising Stars Conference Summer Series | Sydney & Melbourne | 3 & 5 December 2024

  7. Slide 7: Proven bulk mining methods and simple metallurgy are key

    Proven bulk mining methods and simple metallurgy are key Low costs per lb achieved through scale, efficiency and simplicity • Low-risk, traditional, near-surface open-pit mine with a low 1.3:1 strip ratio processing 30Mtpa for +25 years For personal use only • Drive down costs by large equipment bul

  8. Slide 8: Location offers significant capital and operating cost benefits

    Location offers significant capital and operating cost benefits And the ability to design, construct, operate and maintain the business • Global engineering firms experienced in copper For personal use only • Global mining and process plant equipment manufacturers, with facilities for offsite mainte

  9. Slide 9: 2024 in review

    2024 in review Defining key building blocks • Updated Mineral Resource Estimate • Updated Mine Plan For personal use only • Metallurgical testwork • Tailings management review • Updated the site layout • Progressed Environmental approvals • Land purchase option agreements • Continued stakeholder eng

  10. Slide 10: Concentrate shortages are an early indicator for the coming copper deficit

    Concentrate shortages are an early indicator for the coming copper deficit Strong forward demand and fewer developments is tipping the industry to lower stocks and higher prices Global copper production vs two demand scenarios Shrinking supply inventory vs copper price For personal use only AET-2 De

  11. Slide 11: Smelters are rapidly expanding to meet projected demand for finished copper

    Smelters are rapidly expanding to meet projected demand for finished copper China is still the main producer, but Indonesia and India are expanding quickly Planned smelter capacity projects (000s tonnes) • Global copper smelting capacity currently ~27Mtpa For personal use only • China dominates with

  12. Slide 12: But copper concentrate production cannot expand at the same rate

    But copper concentrate production cannot expand at the same rate Smelters will be seeking security of concentrate supply from new projects • Fewer projects are being found, and in challenging For personal use only locations • Ore grades are declining, and costs are rising in large mine built in the

  13. Slide 13: Looking ahead

    Looking ahead Nearing end of final feasibility study phase, de-risking the development pathway • Strategic agreements • Project partner and customer off-take For personal use only • Remaining land requirements • Finalise technical studies • Mine planning, costs and automation • Metallurgy including

  14. Slide 14: Thank you

    Resources Rising Stars For personal use only Summer Series 2024 Thank you Please drop-by to see us at the booth FOR MORE INFORMATION ASX:CVV Resources Rising Stars Conference Summer Series | Sydney 13 caravelminerals.com.au & Melbourne | 3 & 5 December 2024

Caravel Minerals — Resources Rising Stars Summer Series 2024 on 6ix