Caravel Minerals Limited · ASX:CVV

Caravel Minerals — Resources Rising Stars Gold Coast Conference 2024

15 slides from Caravel Minerals's conference presentation, Sep 3, 2024

  1. Slide 1: Conference Presentation – Resources Rising Stars Investor Event

    3 September 2024 CONFERENCE PRESENTATION RESOURCES RISING STARS INVESTOR EVENT Caravel Minerals ASX: CVV is pleased to attach a copy of the presentation provided to the Resources Rising Stars Conference held on the Gold Coast. Managing Director, Don Hyma is today presenting to investors on the Carav

  2. Slide 2: Building Australia's Next Copper Company

    ASX: CVV Building Australia's For personal use only Next Copper Company Don Hyma​ Managing Director Resources Rising Stars Gold Coast Conference 2024 Example of simple photo graphic

  3. Slide 3: Forward Looking and Cautionary Statements

    Forward Looking and Cautionary Statements Caravel Minerals Limited (Caravel or the Company) This presentation should be considered in its entirety. If you do not understand • 13 April 2023 “PFS Processing Update – Caravel Copper consents to the inclusion in this report of the matters based on his in

  4. Slide 4: Caravel Copper Project

    Caravel Copper Project A project that must and will be built to meet world demand • Mining-friendly jurisdiction For personal use only Favoured location • Existing roads, power, water, ports • World class mining expertise • Minimum 25 years Long-life operation • Low-cost production • Critical for de

  5. Slide 5: The copper industry is transitioning

    The copper industry is transitioning… Grades are declining and discoveries are few For personal use only Source: Canaccord Financial Group • In the past decade, average grade mined by major producers • Despite billions of dollars spent on exploration over 20 has fallen from 1.2% to 0.7% years the ra

  6. Slide 6: Copper is heading for a structural deficit mid-decade

    Copper is heading for a structural deficit mid-decade… Strong forward demand, supply growth pressure, and gradual copper price increases Primary copper demand vs potential new supply Copper demand by end-use to 2050 For personal use only A structural deficit is emerging mid-decade Copper price is sl

  7. Slide 7: The next generation of long-life copper projects are lower grade

    The next generation of long-life copper projects are lower grade …and profitable because low costs are maintained by large scale Operating Assets Development Assets For personal use only Asset Copper Mountain5 Gibraltar6 Highland Valley3,7 Josemaria3,8 Caravel Cu, Au, Ag Cu, Mo Cu, Mo Cu, Au, Ag Cu,

  8. Slide 8: The value of new copper projects is starting to be recognised

    The value of new copper projects is starting to be recognised Caravel is well-positioned to benefit from the market’s desire for large, long-life copper projects in tier-1 jurisdictions Target Asset Eva Copper AU Copper Mountain CA Hillside AU Josemaría AR Date Announced December 2022 5 April 2023 6

  9. Slide 9: There are very few large-scale projects in Feasibility Study

    There are very few large-scale projects in Feasibility Study And even fewer located in low-risk mining jurisdictions • Large-scale deposits containing greater than 1 million tonnes copper metal • Ore grades between 0.25 and 0.4% Cu and all in Feasibility Study For personal use only Resources Rising

  10. Slide 10: Resource growth and confidence underpin robust financials

    Resource growth and confidence underpin robust financials With upside exploration potential along a 30km mineralised corridor For personal use only Resources Rising Stars Gold Coast Conference | 3 September 2024

  11. Slide 11: Proven bulk mining methods and simple metallurgy are key

    Proven bulk mining methods and simple metallurgy are key Low costs per lb achieved through scale efficiency and simplicity • Low-risk, traditional, near-surface open-pit mine with a low 1.3:1 strip ratio processing 30Mtpa For personal use only • Lower costs by using large mining equipment • Autonomo

  12. Slide 12: Location offers significant capital and operating cost benefits

    Location offers significant capital and operating cost benefits And the ability to design, construct, operate and maintain the business • 2-hrs by sealed road to bulk materials export facility • Available workforce with a strong mining and processing pedigree For personal use only • State operated e

  13. Slide 13: The project is on a clear pathway to development

    The project is on a clear pathway to development Major risks areas are well understood, and no significant obstacles identified Mineral resource and mine plan updated... ...to increase value and confirm mining rates, fleet size and costs For personal use only Process and tailings design and simplifi

  14. Slide 14: Caravel Copper Project opportunity

    Caravel Copper Project opportunity Tier 1 location with known regulatory process, world class mining expertise, and excellent infrastructure RESOURCE 3Mt contained copper with molybdenum and precious metals For personal use only MINING Proven low-cost, open-pit bulk mining in Western Australia Carav

  15. Slide 15: Thank you for your time

    Resources Rising Stars For personal use only Gold Coast Conference 2024 Thank you for your time Drop-by to see us at the booth FOR MORE INFORMATION ASX:CVV caravelminerals.com.au

Caravel Minerals — Resources Rising Stars Gold Coast Conference 2024 on 6ix